Skip to content
PlanIndex Get alerts
Menu

Planning application

17, Woodland Drive, Penarth

Granted Vale of Glamorgan 2024/00873/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Re-submission of application 2024/00626/FUL 2 storey rear extension and single storey side extension. existing hard standing to front widened.

As published by the council, reference 2024/00873/FUL

Application record

Reference
2024/00873/FUL
Type
Full Planning Application
Status
Application DETERMINED
Decision
Approved
Received
25 Sep 2024
Validated
25 Sep 2024
Decided
29 Nov 2024
Ward
St. Augustines
Parish
Penarth Town Council
Decision by
Delegated

Timeline

Dates from the published record

  1. 25 Sep 2024

    Received by Vale of Glamorgan

  2. 29 Nov 2024

    Decision issued: Approved

  3. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9, Hickman Road, Penarth

    2019/01117/FUL Submitted 10 Oct 2019 128m away

    Replacement of ground and first floor windows and front door to front elevation

    Granted Full applications Windows or glazing 13 docs
  • 40, Stanwell Road, Penarth

    2021/00980/FUL Submitted 2 Jul 2021 164m away

    Loft conversion with installation of Velux window roof lights to the rear elevation only

    Granted Full applications Loft or dormer Windows or glazing 13 docs
  • 46, Stanwell Road, Penarth

    2021/00844/FUL Submitted 7 Jun 2021 174m away

    Demolish and rebuild unstable wall

    Granted Full applications Demolition 7 docs
  • Paget Rooms, Victoria Road, Penarth

    2020/00710/1/CD Submitted 7 Jul 2021 178m away

    Discharge of condition 3 (Materials Details). Planning approval 2020/00710/LBC - Main roof over the auditorium to be re-roofed and existing rooflights to be removed and opening boarded over at Paget Rooms, Victoria Road, Penarth

    Granted Conditions Loft or dormer 1 doc
  • Washington Buildings, Stanwell Road, Penarth

    2022/00767/ADV Submitted 30 Jun 2022 202m away

    Replacement fascia signage to new shop front glazing with manifestation to glazing and addition of LED screen

    Granted Advertising Windows or glazing 12 docs
  • 4 Victoria Avenue, Penarth

    2023/01216/1/CD Submitted 9 Oct 2024 207m away

    Discharge of Condition 4. (Materials Details) for planning ref 2023/01216/FUL - Partial demolition and rebuild of the front boundary wall at 4, Victoria Avenue, Penarth

    Granted Conditions Demolition 2 docs
    Small domestic

In Vale of Glamorgan

  • 2026/00243/FUL Withdrawn

    First Floor, 18 High Street, Cowbridge, CF71 7AG

    Proposed Change of Use of first floor from A1 Retail (Hair Salon) to D2 Assembly and Leisure (Yoga Studio)

    30 Mar 2026 Full applications
  • 2026/00247/FUL Granted

    4 Uphill Close, Sully

    Proposed single storey rear extension

    1 Apr 2026 Full applications
  • 2026/00285/FUL Granted

    12 Sycamore Crescent, Barry

    Variation of Condition 2 (Approved Plans) of Planning Approval 2023/00438/FUL: Demolition of existing garage to create new single storey side and rear extension

    14 Apr 2026 Full applications
  • 2026/00135/FUL Granted

    14 Hawthorn Close, Dinas Powys

    Single storey rear extension, heat pump, removal of existing garage and building of new garage/outbuilding

    16 Feb 2026 Full applications
  • 2025/01182/FUL Granted

    20 Boverton Brook, Llantwit Major

    First floor side extension, garage conversion and single storey rear extension, and widening of the driveway.

    24 Nov 2025 Full applications