Planning application
The Paddocks, Llanmaes
Works: Windows or glazing
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Removal of oriel windows on the front elevation and reinstatement of roof back to original. Replacement of windows on the front elevation to black upvc
As published by the council, reference 2024/00767/FUL
Application record
- Reference
- 2024/00767/FUL
- Type
- Full Planning Application
- Status
- Application DETERMINED
- Decision
- Approved
- Received
- 30 Aug 2024
- Validated
- 30 Aug 2024
- Decided
- 15 Nov 2024
- Ward
- Llantwit Major
- Parish
- Llanmaes Community Council
- Decision by
- Delegated
Timeline
Dates from the published record
-
30 Aug 2024
Received by Vale of Glamorgan
-
15 Nov 2024
Decision issued: Approved
-
7 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
3, Tyle House Close, Llanmaes
Demolish existing lean-to conservatory and rebuild into a permanent structure. Knock through to existing kitchen and dining room to create one room
Granted Lawful development Extension Demolition 8 docs -
Brown Lion House, Llanmaes
Non Material Amendment - The slight enlargement of the proposed Boot Room, material alterations from timber windows, and aluminium rainwater goods to upvc conservation type equivalents, and the introduction of conservation velux rather than sunpipes to the rear roof. Planning permission ref: 2021/01542/FUL - Ground floor single storey extension to northern aspect, including material alterations
Withdrawn Amendments Extension Loft or dormer +1Small domestic -
Malefant Grange, Llanmaes
Work to Trees in a Conservation Area: To cut down a Copper Beech tree located in front garden
Granted Trees 9 docs -
Pond Villa, Llanmaes
Work to Trees in a Conservation Area : Taking down and removal of diseased Ash tree located in rear garden of property. The tree stump will remain
Granted Trees 6 docs -
Ty Felin Fawr,Lane - Junction Froglands Farm To Lanmaes Village Via Caravan Park,Llanmaes
T1 Silver Birch: Removal of crossing branch systems and damaged/dead wood. T3 Sessile Oak: Crown lift. T6 Sweet Chestnut, T7 Flowering, Cherry T8 3x Sycamore: Crown reduction to upper scaffold with crown thinning and deadwood removed. Sycamore: 20% crown reduction, removal of dead and defected branches within the crown. T9 Field Maple: Coppice to a height of 1m. T10 Field Maple: Crown Raise
Granted Trees 2 docs
Other full applications applications
In Vale of Glamorgan
-
2026/00243/FUL Withdrawn
First Floor, 18 High Street, Cowbridge, CF71 7AG
Proposed Change of Use of first floor from A1 Retail (Hair Salon) to D2 Assembly and Leisure (Yoga Studio)
-
2026/00247/FUL Granted
4 Uphill Close, Sully
Proposed single storey rear extension
-
2026/00285/FUL Granted
12 Sycamore Crescent, Barry
Variation of Condition 2 (Approved Plans) of Planning Approval 2023/00438/FUL: Demolition of existing garage to create new single storey side and rear extension
-
2026/00135/FUL Granted
14 Hawthorn Close, Dinas Powys
Single storey rear extension, heat pump, removal of existing garage and building of new garage/outbuilding
-
2025/01182/FUL Granted
20 Boverton Brook, Llantwit Major
First floor side extension, garage conversion and single storey rear extension, and widening of the driveway.