Skip to content
PlanIndex Get alerts
Menu

Planning application

11, Westbourne Road, Penarth

Granted Vale of Glamorgan 2023/00291/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Replacement of defective rear single storey extension

As published by the council, reference 2023/00291/FUL

Application record

Reference
2023/00291/FUL
Type
Full Planning Application
Status
Application DETERMINED
Decision
Approved
Received
17 Mar 2023
Validated
17 Mar 2023
Decided
21 Apr 2023
Ward
Plymouth
Parish
Penarth Town Council
Decision by
Delegated

Timeline

Dates from the published record

  1. 17 Mar 2023

    Received by Vale of Glamorgan

  2. 21 Apr 2023

    Decision issued: Approved

  3. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 14 Westbourne Road, Penarth

    2024/01042/1/CD Submitted 1 Aug 2025 49m away

    Discharge of Condition 5 (Details / Additional Details): Planning permission re: 2024/01042/FUL - Demolition of Conservatory and part demolition of rear extension with new proposed rear extension

    Granted Conditions Extension Demolition 8 docs
  • Avalon, 5, Cwrt Y Vil Road, Penarth

    2021/01316/CAC Submitted 13 Sep 2021 63m away

    Demolition of existing shed and rear boundary wall to make way for new garden room with veranda

    Withdrawn Heritage and listed buildings Demolition 13 docs
    Small domestic
  • 25 Westbourne Road, Penarth, CF64 3HA

    2025/00814/TCA Submitted 11 Aug 2025 84m away

    Remove a non-native Eucalyptus globulus from the back boundary wall of the property and grind the stump to a suitable depth

    Granted Trees 2 docs
    Small domestic
  • 10A, Cwrt Y Vil Road, Penarth

    2021/00218/FUL Submitted 17 Feb 2021 96m away

    Replace roof, current roof is beyond repair. Replace existing landing window with 1 x Velux window. Replace all fascia's, downpipes and guttering.

    Granted Full applications Loft or dormer Windows or glazing 17 docs
  • 10, Victoria Road, Penarth

    2019/01145/FUL Submitted 16 Oct 2019 110m away

    To reinstate the original height of longstanding boundary fence, permission for fence along front boudary to highway to a maximum heigh of 1.8M

    Granted Full applications 7 docs
    Small domestic
  • 22, Victoria Road, Penarth

    2024/00954/TCA Submitted 16 Oct 2024 118m away

    Work to Tree(s) in a Conservation Area : Tree No.1 Yew to the front of the property, slight cut back as the tree is touching the property. Slight crown lift to 2m. Removal of the Laurel under-storey. Group 1 ,4 number lawsons Cypress previously reduced in height, reduce down back to their previous height by removing approx 2 to 3m from the top. Tree No.3 self sown Ash tree with early stages of Ash dieback, causing damage to he boundary wall, remove tree and treat stump to prevent re growth

    Granted Trees 5 docs
    Small domestic

In Vale of Glamorgan

  • 2026/00243/FUL Withdrawn

    First Floor, 18 High Street, Cowbridge, CF71 7AG

    Proposed Change of Use of first floor from A1 Retail (Hair Salon) to D2 Assembly and Leisure (Yoga Studio)

    30 Mar 2026 Full applications
  • 2026/00247/FUL Granted

    4 Uphill Close, Sully

    Proposed single storey rear extension

    1 Apr 2026 Full applications
  • 2026/00285/FUL Granted

    12 Sycamore Crescent, Barry

    Variation of Condition 2 (Approved Plans) of Planning Approval 2023/00438/FUL: Demolition of existing garage to create new single storey side and rear extension

    14 Apr 2026 Full applications
  • 2026/00135/FUL Granted

    14 Hawthorn Close, Dinas Powys

    Single storey rear extension, heat pump, removal of existing garage and building of new garage/outbuilding

    16 Feb 2026 Full applications
  • 2025/01182/FUL Granted

    20 Boverton Brook, Llantwit Major

    First floor side extension, garage conversion and single storey rear extension, and widening of the driveway.

    24 Nov 2025 Full applications