Skip to content
PlanIndex Get alerts
Menu

Planning application

3, Park Road, Penarth

Granted Vale of Glamorgan 2023/00129/FUL Full Planning Application

Works: Windows or glazing

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Replacement sash windows to front and side elevations of existing property

As published by the council, reference 2023/00129/FUL

Application record

Reference
2023/00129/FUL
Type
Full Planning Application
Status
Application DETERMINED
Decision
Approved
Received
6 Feb 2023
Validated
14 Feb 2023
Decided
19 Apr 2023
Ward
Plymouth
Parish
Penarth Town Council
Decision by
Delegated

Timeline

Dates from the published record

  1. 6 Feb 2023

    Received by Vale of Glamorgan

  2. 14 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 19 Apr 2023

    Decision issued: Approved

  4. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Monkton House, Holmesdale Place, Penarth

    2024/01097/TPO Submitted 20 Nov 2024 111m away

    Work to Tree(s) covered by Tree Preservation Order No. 1, 1997 - Remove Weeping Ash tree, remove stump

    Withdrawn Trees 2 docs
  • Holmelea Mews, 3 Holmesdale Place, Penarth

    2024/00860/FUL Submitted 23 Sep 2024 112m away

    First floor extension with Juliette balcony and alterations, changes to fenestration

    Granted Full applications Extension Windows or glazing 23 docs
  • Pinefield, 16, Park Road, Penarth

    2021/01712/1/NMA Submitted 23 Mar 2023 139m away

    Non Material Amendment - Alterations to the elevation treatment including material amendments. The omission of a first floor balcony and the retention and re-use of the existing garage structure. Planning application ref: 2021/01712/FUL - Building extensions to side and rear, including dormer and roof remodeling, external and internal material alterations, external workshop/gym and office accommodation

    Granted Amendments Extension Loft or dormer 10 docs
  • The Tower, Tower Hill, Penarth

    2018/00072/2/CD Submitted 18 Oct 2019 151m away

    Discharge of Condition 3 schedule of materials (alternative timber cladding from that approved) Planning permission 2018/00072/FUL:-External and internal alterations

    Granted Conditions 5 docs
  • Parkmount, Bridgeman Road, Penarth

    2021/00853/FUL Submitted 9 Jun 2021 154m away

    Demolition of existing side conservatory and replacement with orangery and alterations to existing balcony

    Granted Full applications Extension Demolition 13 docs
  • 58, Plymouth Road, Penarth

    2021/00664/1/NMA Submitted 5 Aug 2021 243m away

    Non Material Amendment - Re-roofing of dwelling. Planning approval 2021/00664/FUL - Replace existing main roof and front single storey roof coverings with clay tiles, replace rear single storey roof with concrete tiles, replace existing velux with new velux, rebuild chimney stack using salvaged bricks if possible, to existing dimensions, complete with lead DPC

    Granted Amendments Loft or dormer 5 docs
    Small domestic

In Vale of Glamorgan

  • 2026/00243/FUL Withdrawn

    First Floor, 18 High Street, Cowbridge, CF71 7AG

    Proposed Change of Use of first floor from A1 Retail (Hair Salon) to D2 Assembly and Leisure (Yoga Studio)

    30 Mar 2026 Full applications
  • 2026/00247/FUL Granted

    4 Uphill Close, Sully

    Proposed single storey rear extension

    1 Apr 2026 Full applications
  • 2026/00285/FUL Granted

    12 Sycamore Crescent, Barry

    Variation of Condition 2 (Approved Plans) of Planning Approval 2023/00438/FUL: Demolition of existing garage to create new single storey side and rear extension

    14 Apr 2026 Full applications
  • 2026/00135/FUL Granted

    14 Hawthorn Close, Dinas Powys

    Single storey rear extension, heat pump, removal of existing garage and building of new garage/outbuilding

    16 Feb 2026 Full applications
  • 2025/01182/FUL Granted

    20 Boverton Brook, Llantwit Major

    First floor side extension, garage conversion and single storey rear extension, and widening of the driveway.

    24 Nov 2025 Full applications