Skip to content
PlanIndex Get alerts
Menu

Planning application

10A, Clive Place, Penarth

Granted Vale of Glamorgan 2023/00083/FUL Full Planning Application

Works: Windows or glazing

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Current wooden windows/doors are replaced with high quality heritage UPVC windows/doors

As published by the council, reference 2023/00083/FUL

Application record

Reference
2023/00083/FUL
Type
Full Planning Application
Status
Application DETERMINED
Decision
Approved
Received
26 Jan 2023
Validated
3 Feb 2023
Decided
23 Apr 2023
Ward
St. Augustines
Parish
Penarth Town Council
Decision by
Delegated

Timeline

Dates from the published record

  1. 26 Jan 2023

    Received by Vale of Glamorgan

  2. 3 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 23 Apr 2023

    Decision issued: Approved

  4. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 13, Clive Place, Penarth

    2021/00864/FUL Submitted 11 Jun 2021 53m away

    External alterations to the rear elevation and the replacement of the existing upvc windows with timber box sash windows

    Granted Full applications Windows or glazing 21 docs
  • 8, Albert Court, Albert Crescent, Penarth

    2019/01227/TCA Submitted 7 Nov 2019 117m away

    Work to trees in Penarth Conversation Area: Fell Pine and Beech

    Granted Trees 5 docs
  • Flat 8, Albert Court, 11, Albert Crescent, Penarth

    2021/00196/1/NMA Submitted 27 Jul 2021 127m away

    Non Material Amendment - We are looking to replace the structural columns with a number of brackets to support the balcony. Planning approval 2021/00196/FUL - Replace 2no. existing windows with French doors and install new external balcony plus associated works

    Granted Amendments Windows or glazing 7 docs
  • Albert Primary School and Nursery, Albert Road, Penarth

    2020/01522/1/NMA Submitted 29 Mar 2021 175m away

    Non Material Amendment - Apply a rendered finish to the end gables of the building. Planning Permission:- 2020/01522/RG3 - Proposed refurbishment and internal alteration of existing outbuilding to provide classroom and ancillary areas for educational and community use

    Granted Amendments 3 docs
  • Lindens Lodge, Bradford Place, Penarth

    2024/00938/TPO Submitted 11 Oct 2024 189m away

    Works to tree covered by TPO No.08 of 2000: T1 Beech - Reduce crown by approx. 20% and thin out congested growth

    Granted Trees 5 docs
  • 6, Glebe Street, Penarth

    2019/00640/1/CD Submitted 24 Oct 2019 208m away

    Discharge of conditions 6 (works to building's exterior) and 7 (external materials) of planning permission 2019/00640/FUL (Change of use of Unit 1 of the building (ground and first floor) to A3 cafe use with outdoor seating (no hot food to be cooked on the premises))

    Granted Conditions 6 docs

In Vale of Glamorgan

  • 2026/00243/FUL Withdrawn

    First Floor, 18 High Street, Cowbridge, CF71 7AG

    Proposed Change of Use of first floor from A1 Retail (Hair Salon) to D2 Assembly and Leisure (Yoga Studio)

    30 Mar 2026 Full applications
  • 2026/00247/FUL Granted

    4 Uphill Close, Sully

    Proposed single storey rear extension

    1 Apr 2026 Full applications
  • 2026/00285/FUL Granted

    12 Sycamore Crescent, Barry

    Variation of Condition 2 (Approved Plans) of Planning Approval 2023/00438/FUL: Demolition of existing garage to create new single storey side and rear extension

    14 Apr 2026 Full applications
  • 2026/00135/FUL Granted

    14 Hawthorn Close, Dinas Powys

    Single storey rear extension, heat pump, removal of existing garage and building of new garage/outbuilding

    16 Feb 2026 Full applications
  • 2025/01182/FUL Granted

    20 Boverton Brook, Llantwit Major

    First floor side extension, garage conversion and single storey rear extension, and widening of the driveway.

    24 Nov 2025 Full applications