Skip to content
PlanIndex Get alerts
Menu

Planning application

5, Heol Y Pentir, Rhoose

Granted Vale of Glamorgan 2023/00057/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Proposed rear single storey extension to garage and partial conversion of the existing detached garage structure to provide study/ granny annexe, which is to be used in an ancillary capacity to main dwelling:all with associated external works.

As published by the council, reference 2023/00057/FUL

Application record

Reference
2023/00057/FUL
Type
Full Planning Application
Status
Application DETERMINED
Decision
Approved
Received
18 Jan 2023
Validated
9 Feb 2023
Decided
21 Apr 2023
Ward
Rhoose
Parish
Rhoose
Decision by
Delegated

Timeline

Dates from the published record

  1. 18 Jan 2023

    Received by Vale of Glamorgan

  2. 9 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 21 Apr 2023

    Decision issued: Approved

  4. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land north of Heol-y-Pentir, Heol-y-Pentir, Rhoose

    2018/01421/6/CD Submitted 2 Sep 2024 189m away

    Discharge of Condition 25 (Imported Soil), 26 (Imported Aggregates), and 27 (Use of Site Won Materials) ref 2018/01241/OUT - 100% affordable residential development (up to 15 units) and all associated works at land to the north of Heol-Y-Pentir, Rhoose

    Granted Conditions New dwelling 14 docs
    Major scheme
  • St. Peters Church, Church Road, Rhoose

    2019/01211/TCA Submitted 1 Nov 2019 409m away

    Work to tree in Rhoose Conservation Area: Take down single Greengage tree (Prunus p domestica), North of St. Peters Church bordering Station Road

    Withdrawn Trees 6 docs
  • South Point Primary School, Rhoose Way, Rhoose

    2024/00806/ADV Submitted 9 Sep 2024 419m away

    Proposed displaying of School Eco Flag on 6 metre high flagpole

    Granted Advertising 8 docs
  • South Point Primary School, Rhoose Way, Rhoose

    2024/00805/RG3 Submitted 9 Sep 2024 419m away

    Proposed displaying of School Eco Flag on 6 metre high flagpole

    Granted Other 10 docs
  • Land to the North of the railway, Rhoose

    2020/00741/4/CD Submitted 23 Jul 2021 420m away

    Discharge of Condition 10 (Contamination 6). Planning approval 2020/00741/RG3 - Proposed new primary school and associated works

    Granted Conditions 9 docs

In Vale of Glamorgan

  • 2026/00243/FUL Withdrawn

    First Floor, 18 High Street, Cowbridge, CF71 7AG

    Proposed Change of Use of first floor from A1 Retail (Hair Salon) to D2 Assembly and Leisure (Yoga Studio)

    30 Mar 2026 Full applications
  • 2026/00247/FUL Granted

    4 Uphill Close, Sully

    Proposed single storey rear extension

    1 Apr 2026 Full applications
  • 2026/00285/FUL Granted

    12 Sycamore Crescent, Barry

    Variation of Condition 2 (Approved Plans) of Planning Approval 2023/00438/FUL: Demolition of existing garage to create new single storey side and rear extension

    14 Apr 2026 Full applications
  • 2026/00135/FUL Granted

    14 Hawthorn Close, Dinas Powys

    Single storey rear extension, heat pump, removal of existing garage and building of new garage/outbuilding

    16 Feb 2026 Full applications
  • 2025/01182/FUL Granted

    20 Boverton Brook, Llantwit Major

    First floor side extension, garage conversion and single storey rear extension, and widening of the driveway.

    24 Nov 2025 Full applications