Skip to content
PlanIndex Get alerts
Menu

Planning application

25, Sully Terrace, Penarth

Granted Vale of Glamorgan 2022/01000/FUL Full Planning Application

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Two storey rear extension/loft conversion/front porch / new bay window

As published by the council, reference 2022/01000/FUL

Application record

Reference
2022/01000/FUL
Type
Full Planning Application
Status
Application DETERMINED
Decision
Approved
Received
7 Sep 2022
Validated
19 Oct 2022
Decided
4 Apr 2023
Ward
Plymouth
Parish
Penarth Town Council
Decision by
Delegated

Timeline

Dates from the published record

  1. 7 Sep 2022

    Received by Vale of Glamorgan

  2. 19 Oct 2022

    Validated

    Checked as complete and ready for consideration.

  3. 4 Apr 2023

    Decision issued: Approved

  4. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 28, Sully Terrace, Penarth

    2021/00895/FUL Submitted 17 Jun 2021 16m away

    Single storey rear extension and loft conversion with rear dormer

    Granted Full applications Extension Loft or dormer 7 docs
    Small domestic
  • 55, Plymouth Road, Penarth

    2021/00818/FUL Submitted 4 Jun 2021 131m away

    Single storey rear extension. Change all windows including roof lights and dormer windows to be like for like in wood painted white and external alterations

    Granted Full applications Extension Loft or dormer +1 17 docs
    Small domestic
  • Mews Cottage, Rear of 12, Marine Parade, Penarth

    2022/01281/FUL Submitted 24 Nov 2022 164m away

    Erection of single storey extension to the left hand side of the property. Extending the existing single storey front elevation

    Granted Full applications Extension 7 docs
    Small domestic
  • 60 Plymouth Road, Penarth

    2021/00669/1/NMA Submitted 5 Aug 2021 166m away

    Non Material Amendment - Re-roofing of dwelling. Planning approval 2021/00669/FUL - Main roof, front low level roof and rear two storey roof: remove existing clay plain tile roof coverings, including felt and battens, and renew with new Redland Rosemary clay plain tiles, Smooth Red in colour. Introduce Velux roof window within front roof elevation, located between the dormer and party wall. Two storey chimney stack: remove existing pots and cap over chimney with code 5 lead

    Granted Amendments Loft or dormer Windows or glazing 3 docs
    Domestic
  • 60, Plymouth Road, Penarth

    2021/00669/FUL Submitted 6 May 2021 166m away

    Main roof, front low level roof and rear two storey roof: remove existing clay plain tile roof coverings, including felt and battens, and renew with new Redland Rosemary clay plain tiles, Smooth Red in colour. Introduce Velux roof window within front roof elevation, located between the dormer and party wall. Two storey chimney stack: remove existing pots and cap over chimney with code 5 lead.

    Granted Full applications Loft or dormer Windows or glazing 9 docs
  • 58, Plymouth Road, Penarth

    2021/00664/1/NMA Submitted 5 Aug 2021 173m away

    Non Material Amendment - Re-roofing of dwelling. Planning approval 2021/00664/FUL - Replace existing main roof and front single storey roof coverings with clay tiles, replace rear single storey roof with concrete tiles, replace existing velux with new velux, rebuild chimney stack using salvaged bricks if possible, to existing dimensions, complete with lead DPC

    Granted Amendments Loft or dormer 5 docs
    Small domestic

In Vale of Glamorgan

  • 2026/00243/FUL Withdrawn

    First Floor, 18 High Street, Cowbridge, CF71 7AG

    Proposed Change of Use of first floor from A1 Retail (Hair Salon) to D2 Assembly and Leisure (Yoga Studio)

    30 Mar 2026 Full applications
  • 2026/00247/FUL Granted

    4 Uphill Close, Sully

    Proposed single storey rear extension

    1 Apr 2026 Full applications
  • 2026/00285/FUL Granted

    12 Sycamore Crescent, Barry

    Variation of Condition 2 (Approved Plans) of Planning Approval 2023/00438/FUL: Demolition of existing garage to create new single storey side and rear extension

    14 Apr 2026 Full applications
  • 2026/00135/FUL Granted

    14 Hawthorn Close, Dinas Powys

    Single storey rear extension, heat pump, removal of existing garage and building of new garage/outbuilding

    16 Feb 2026 Full applications
  • 2025/01182/FUL Granted

    20 Boverton Brook, Llantwit Major

    First floor side extension, garage conversion and single storey rear extension, and widening of the driveway.

    24 Nov 2025 Full applications