Planning application

68, White Farm, Barry

Granted Vale of Glamorgan 2021/00855/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Single storey extension to rear of existing domestic dwelling

As published by the council, reference 2021/00855/FUL

Application record

Reference
2021/00855/FUL
Type
Full Planning Application
Status
Application DETERMINED
Decision
Approved
Received
9 Jun 2021
Validated
9 Jun 2021
Decided
4 Aug 2021
Ward
Dyfan
Parish
Barry Town Council
Decision by
Delegated

Timeline

Dates from the published record

  1. 9 Jun 2021

    Received by Vale of Glamorgan

  2. 4 Aug 2021

    Decision issued: Approved

  3. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Cemetery, Cemetery Approach Road, Barry

    2023/00205/ADV Submitted 27 Feb 2023 314m away

    The retention of 2 flagpoles with associated flag, Green Flag Award and Barry Town Council Coat of Arms

    Granted Advertising 5 docs
  • Cemetery Road, Barry

    2017/01312/1/CD Submitted 4 Nov 2019 376m away

    Discharge Conditions 5, 6, and 7. Planning permission 2017/01312/FUL: Construction of a community building to be used by the Barry Town Council

    Granted Conditions 12 docs
  • 26, Collard Crescent, Barry

    2023/00089/FUL Submitted 26 Jan 2023 411m away

    Loft conversion with rear dormer. Single storey rear extension

    Granted Full applications Extension Loft or dormer 7 docs
    Small domestic
  • Colcot Health Clinic, Winston Road, Barry

    2021/01444/5/CD Submitted 20 Sep 2024 468m away

    Discharge of Conditions 12.(Ecology/Biodiversity) 13.(Landscaping Scheme) & 15.( Highways Details) for planning permission ref: 2021/01444/RG3 - Demolition of existing clinic building and construction of 100% affordable flatted development consisting of 12 one-bedroom units including associated works

    Granted Conditions Demolition 10 docs
  • Skomer Road, Barry

    2023/00084/PNT Submitted 26 Jan 2023 487m away

    Proposed 5G telecoms installation: H3G 15m street pole and additional equipment cabinets

    Granted Telecoms 15 docs

In Vale of Glamorgan

  • 2026/00243/FUL Withdrawn

    First Floor, 18 High Street, Cowbridge, CF71 7AG

    Proposed Change of Use of first floor from A1 Retail (Hair Salon) to D2 Assembly and Leisure (Yoga Studio)

    30 Mar 2026 Full applications
  • 2026/00247/FUL Granted

    4 Uphill Close, Sully

    Proposed single storey rear extension

    1 Apr 2026 Full applications
  • 2026/00285/FUL Granted

    12 Sycamore Crescent, Barry

    Variation of Condition 2 (Approved Plans) of Planning Approval 2023/00438/FUL: Demolition of existing garage to create new single storey side and rear extension

    14 Apr 2026 Full applications
  • 2026/00135/FUL Granted

    14 Hawthorn Close, Dinas Powys

    Single storey rear extension, heat pump, removal of existing garage and building of new garage/outbuilding

    16 Feb 2026 Full applications
  • 2025/01182/FUL Granted

    20 Boverton Brook, Llantwit Major

    First floor side extension, garage conversion and single storey rear extension, and widening of the driveway.

    24 Nov 2025 Full applications