University Hospital Llandough, Penlan Road, Llandough
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Proposed external works to the Energy Centre, including the development of a free standing 37m tall single core chimney, duct work for CHP plant, external blowdown vessel, dry air coolers and external alterations to the building including new and replacement louvres.
As published by the council, reference 2021/00550/FUL
Application record
- Reference
- 2021/00550/FUL
- Type
- Full Planning Application
- Status
- Granted As published: Application DETERMINED
- Decision
- Granted As published: Approved
- Received
- 14 Apr 2021
- Validated
- 4 May 2021
- Decided
- 2 Sep 2021
- Ward
- Llandough
- Parish
- Llandough Community Council
- Decision by
- Committee
Timeline
Dates from the published record
-
14 Apr 2021
Received by Vale of Glamorgan
-
4 May 2021
Validated
Checked as complete and ready for consideration.
-
2 Sep 2021
Decision issued: Approved
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
25 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Vale of Glamorgan granted permission on 2 September 2021, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
University Hospital Llandough, Penlan Road, Llandough, Penarth
Discharge of Condition 4 (CTMP). Planning approval 2021/00231/FUL - Two storey Endoscopy extension to house new plant room on the first floor and new recovery area on the ground floor. The existing recovery area re-modelled to house two new theatres
Granted Conditions Extension 8 docs -
10, Summerland Crescent, Llandough, Penarth
New ground floor porch and window changed to French doors at first floor on front elevation of dwelling
Granted Full applications Extension Windows or glazing 7 docsSmall domestic -
Vale Car Sales, Leckwith Road, Llandough
To enable future housing development.
Granted Prior approval 15 docs -
Bryn Tynel, Leckwith Road, LLandough
92% historically approved · decision due ~29 Jan
Erection of a detached three bedroom residential dwelling, detached garage and container office, with means of access only to be considered at this stage
Awaiting decision Outline 25 docsDomestic
Other full applications
In Vale of Glamorgan
-
2026/00243/FUL Withdrawn
First Floor, 18 High Street, Cowbridge, CF71 7AG
Proposed Change of Use of first floor from A1 Retail (Hair Salon) to D2 Assembly and Leisure (Yoga Studio)
-
2026/00247/FUL Granted
4 Uphill Close, Sully
Proposed single storey rear extension
-
2026/00285/FUL Granted
12 Sycamore Crescent, Barry
Variation of Condition 2 (Approved Plans) of Planning Approval 2023/00438/FUL: Demolition of existing garage to create new single storey side and rear extension
-
2026/00135/FUL Granted
14 Hawthorn Close, Dinas Powys
Single storey rear extension, heat pump, removal of existing garage and building of new garage/outbuilding
-
2025/01182/FUL Granted
20 Boverton Brook, Llantwit Major
First floor side extension, garage conversion and single storey rear extension, and widening of the driveway.