Planning application

University Hospital Llandough, Penlan Road, Llandough

Granted Vale of Glamorgan 2021/00550/FUL Full Planning Application

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Proposed external works to the Energy Centre, including the development of a free standing 37m tall single core chimney, duct work for CHP plant, external blowdown vessel, dry air coolers and external alterations to the building including new and replacement louvres.

As published by the council, reference 2021/00550/FUL

Application record

Reference
2021/00550/FUL
Type
Full Planning Application
Status
Application DETERMINED
Decision
Approved
Received
14 Apr 2021
Validated
4 May 2021
Decided
2 Sep 2021
Ward
Llandough
Parish
Llandough Community Council
Decision by
Committee

Timeline

Dates from the published record

  1. 14 Apr 2021

    Received by Vale of Glamorgan

  2. 4 May 2021

    Validated

    Checked as complete and ready for consideration.

  3. 2 Sep 2021

    Decision issued: Approved

  4. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • University Hospital Llandough, Penlan Road, Llandough, Penarth

    2021/00231/1/CD Submitted 7 Jul 2022 122m away

    Discharge of Condition 4 (CTMP). Planning approval 2021/00231/FUL - Two storey Endoscopy extension to house new plant room on the first floor and new recovery area on the ground floor. The existing recovery area re-modelled to house two new theatres

    Granted Conditions Extension 8 docs
  • 10, Summerland Crescent, Llandough, Penarth

    2021/00951/FUL Submitted 28 Jun 2021 383m away

    New ground floor porch and window changed to French doors at first floor on front elevation of dwelling

    Granted Full applications Extension Windows or glazing 7 docs
    Small domestic
  • Vale Car Sales, Leckwith Road, Llandough

    2024/01007/PND Submitted 25 Oct 2024 437m away

    To enable future housing development.

    Granted Prior approval 15 docs
  • Bryn Tynel, Leckwith Road, LLandough

    2024/01149/OUT Submitted 4 Dec 2024 481m away

    Erection of a detached three bedroom residential dwelling, detached garage and container office, with means of access only to be considered at this stage

    Decided Outline 25 docs
    Domestic

In Vale of Glamorgan

  • 2026/00243/FUL Withdrawn

    First Floor, 18 High Street, Cowbridge, CF71 7AG

    Proposed Change of Use of first floor from A1 Retail (Hair Salon) to D2 Assembly and Leisure (Yoga Studio)

    30 Mar 2026 Full applications
  • 2026/00247/FUL Granted

    4 Uphill Close, Sully

    Proposed single storey rear extension

    1 Apr 2026 Full applications
  • 2026/00285/FUL Granted

    12 Sycamore Crescent, Barry

    Variation of Condition 2 (Approved Plans) of Planning Approval 2023/00438/FUL: Demolition of existing garage to create new single storey side and rear extension

    14 Apr 2026 Full applications
  • 2026/00135/FUL Granted

    14 Hawthorn Close, Dinas Powys

    Single storey rear extension, heat pump, removal of existing garage and building of new garage/outbuilding

    16 Feb 2026 Full applications
  • 2025/01182/FUL Granted

    20 Boverton Brook, Llantwit Major

    First floor side extension, garage conversion and single storey rear extension, and widening of the driveway.

    24 Nov 2025 Full applications