Skip to content
PlanIndex Get alerts
Menu

Planning application

36, Laburnum Way, Penarth

Granted Vale of Glamorgan 2019/01215/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Single and Double storey rear / single storey side extensions plus all associated works

As published by the council, reference 2019/01215/FUL

Application record

Reference
2019/01215/FUL
Type
Full Planning Application
Status
Application DETERMINED
Decision
Approved
Received
5 Nov 2019
Validated
5 Nov 2019
Decided
18 Dec 2019
Ward
Stanwell
Parish
Penarth Town Council
Decision by
Delegated

Timeline

Dates from the published record

  1. 5 Nov 2019

    Received by Vale of Glamorgan

  2. 18 Dec 2019

    Decision issued: Approved

  3. 14 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 57, Laburnum Way, Penarth

    2023/00112/FUL Submitted 1 Feb 2023 59m away

    Proposed rear single storey extension

    Granted Full applications Extension 7 docs
    Small domestic
  • 1, Earl Road, Penarth

    2019/01192/FUL Submitted 31 Oct 2019 205m away

    Single storey extension to the rear of the house

    Granted Full applications Extension 12 docs
    Small domestic
  • 13, St. Peters Road, Penarth

    2018/00478/1/NMA Submitted 11 Oct 2019 255m away

    Non-Material Amendment - Replacing the large roof window to single storey extension with 2 No. roof lights 3 No. additional roof lights to double storey extension roof. Planning Permission ref. 2018/00478/FUL: Proposed two storey extension, single storey extension and loft conversion with dormer window

    Granted Amendments Extension Loft or dormer +1 6 docs
    Small domestic
  • 61, Redlands Road, Penarth

    2019/01202/FUL Submitted 1 Nov 2019 278m away

    Proposed demolition of two storey extension, erection of single storey extension with loft conversion and dormer to rear

    Granted Full applications Extension Loft or dormer +1 8 docs
    Small domestic
  • TVG26574 Grass Verge of Elfed Avenue, Penarth

    2023/00247/PNT Submitted 8 Mar 2023 331m away

    Proposed Telecommunications Radio Base Station Installation

    Granted Telecoms 35 docs
  • 14, Glyndwr Road, Penarth

    2021/01002/FUL Submitted 6 Jul 2021 352m away

    Removal of existing rear conservatory and single storey side structure and replace with proposed front, side and rear, wrap around single storey extension with alterations to fenestration and all associated external works

    Granted Full applications Extension Windows or glazing 7 docs
    Small domestic

In Vale of Glamorgan

  • 2026/00243/FUL Withdrawn

    First Floor, 18 High Street, Cowbridge, CF71 7AG

    Proposed Change of Use of first floor from A1 Retail (Hair Salon) to D2 Assembly and Leisure (Yoga Studio)

    30 Mar 2026 Full applications
  • 2026/00247/FUL Granted

    4 Uphill Close, Sully

    Proposed single storey rear extension

    1 Apr 2026 Full applications
  • 2026/00285/FUL Granted

    12 Sycamore Crescent, Barry

    Variation of Condition 2 (Approved Plans) of Planning Approval 2023/00438/FUL: Demolition of existing garage to create new single storey side and rear extension

    14 Apr 2026 Full applications
  • 2026/00135/FUL Granted

    14 Hawthorn Close, Dinas Powys

    Single storey rear extension, heat pump, removal of existing garage and building of new garage/outbuilding

    16 Feb 2026 Full applications
  • 2025/01182/FUL Granted

    20 Boverton Brook, Llantwit Major

    First floor side extension, garage conversion and single storey rear extension, and widening of the driveway.

    24 Nov 2025 Full applications