Planning application
Car Park Recreation Ground The Causeway Dunmow Essex
Works: Extension
Relates to UTT/23/2494/FUL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Non-material amendment to UTT/23/2494/FUL - amendment to finish of the extended car park from tarmac to Drive Grid with soil and grass infill
As published by the council, reference UTT/26/2102/NMA
Application record
- Reference
- UTT/26/2102/NMA
- Category
- Amendments
- Status
- Awaiting decision
- Received
- 17 Aug 2026
- Validated
- 17 Aug 2026
Site history
Applications at this address on the Uttlesford register
This site has had 5 applications since 2023: 2 approved, 0 refused.
-
UTT/26/2043/NMA Withdrawn
Car Park Recreation Ground The Causeway Dunmow Essex
Non-material amendment to UTT/23/2494/FUL - amendment to the finish of the extended car park from tarmac to loose stone.
-
UTT/26/1296/NMA Granted
Car Park Recreation Ground The Causeway Dunmow Essex
Non-material amendment to UTT/23/2494/FUL - change the trigger point for provision of electric charging points
-
UTT/26/1202/FUL Withdrawn
Car Park Recreation Ground The Causeway Dunmow Essex
S73 application to vary condition 20 (electric car charging facilities) of UTT/23/2494/FUL (Redevelopment of existing car park to provide 70no. parking spaces and widening of existing crossover. Demolition of existing toilet block and construction of new block with bottle filling station. New storage facility with photovoltaic panels and new MUGA with surrounding hardstanding and landscaping) - in order to install electric car charging facilities within the first 12 months of occupation rather than prior to occupation
-
UTT/23/2494/FUL Granted
Car Park Recreation Ground The Causeway Dunmow Essex
Redevelopment of existing car park to provide 70no. parking spaces and widening of existing crossover. Demolition of existing toilet block and construction of new block with bottle filling station. New storage facility with photovoltaic panels and new MUGA with surrounding hardstanding and landscaping.
Timeline
Dates from the published record
-
17 Aug 2026
Received by Uttlesford
-
18 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Uttlesford took a median of 57 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
UTT/23/2494/FUL Granted
Car Park Recreation Ground The Causeway Dunmow Essex
Redevelopment of existing car park to provide 70no. parking spaces and widening of existing crossover. Demolition of existing toilet block and construction of new block with bottle filling station. New storage facility with photovoltaic panels and new MUGA with surrounding hardstanding and landscaping.
What happens while it is decided
This application is with Uttlesford for determination, against a statutory target of eight weeks. Over the last year Uttlesford decided amendment applications in a median of 18 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Other amendment applications
In Uttlesford
-
UTT/26/1219/NMA Refused
Land North Of Knight Park Thaxted Road Saffron Walden Essex
Non Material Amendment to UTT/25/0101/PINS (S62A/2024/0075) - amending the heights of certain windows for plots 1-15, 24-32, 41-51 and 53-55. Revising the orientation (internal layout and principal elevation) of plot 14 and 42. Insertion of a single window to the rear of the building at ground floor level, insertion of a velux window on the front elevation of the building and removal of a window by the front door for plots 33-40 (block A). Insertion of additional openers to the ground floor rear elevation patio doors for plots 2, 3, 7, 8, 10, 11, 13, 15, 27, 28, 45, 46, 54 and 55.
-
UTT/26/1992/NMA Awaiting decision
1 Easton View Bambers Green Road Takeley Bishops Stortford CM22 6PA
Non-material amendment to UTT/25/0925/HHF - omission of render finish to 1st floor level and addition of composite weatherboarding
-
UTT/26/1369/NMA Granted
Land East Of School Road And Main Road Felsted School Road Felsted Essex
Application under Section 96A of the Town and Country Planning Act 1990 for non-material amendments to application UTT/22/0007/FUL via amendment to conditions 6, 11, 15, 16, 21, 23, 26, 27 and 28.
-
UTT/26/1915/NMA Awaiting decision
Gardens Easton Lodge Park Road Little Easton Essex CM6 2BB
Non-material amendment to UTT/25/3293/FUL - move position of proposed greenhouse
-
UTT/26/1881/NMA Awaiting decision
Limeen 25A Station Road Felsted Dunmow Essex CM6 3HD
Non-material amendment to UTT/23/2561/HHF - reduce width of sliding doors and change fenestration from four to three sash