White Hall Chelmsford Road Margaret Roding Essex CM6 1QL

Granted Uttlesford UTT/26/0618/FUL Fully Detailed

Works: New dwelling Demolition Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

S73 application to vary condition 2 (approved plans) and 12 (vehicle parking and turning) of UTT/23/1826/FUL (Demolition of existing buildings and redevelopment to residential use comprising 7 no. new dwellings)

As published by the council, reference UTT/26/0618/FUL

Application record

Reference
UTT/26/0618/FUL
Type
Fully Detailed
Status
Approved
Decision
Approve with Conditions
Received
11 Mar 2026
Validated
11 Mar 2026
Decided
23 Apr 2026
Ward
High Easter And The Rodings
Parish
Margaret Roding
Decision by
Delegated Decision
Postcode
CM6 1QL

Timeline

Dates from the published record

  1. 11 Mar 2026

    Received by Uttlesford

  2. 23 Apr 2026

    Decision issued: Approve with Conditions

  3. 17 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Bristol

189 applications on PlanIndex · across 12 councils · 82% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • White Hall Chelmsford Road Margaret Roding Essex CM6 1QL

    UTT/23/1826/FUL Submitted 18 Jul 2023 0m away

    Demolition of existing buildings and redevelopment to residential use comprising 7 no. new dwellings

    Granted Full applications New dwelling Demolition 30 docs
    Several homes
  • Barns At White Hall Chelmsford Road Margaret Roding Dunmow Essex CM6 1QL

    UTT/20/2942/PAQ3 Submitted 10 Nov 2020 26m away

    Prior Notification of change of use of agricultural building to 4 no. dwellings

    Granted Prior approval 28 docs
    Several homes
  • White Hall Chelmsford Road Margaret Roding Essex CM6 1QL

    UTT/26/1066/FUL Submitted 1 May 2026 33m away

    Demolition of existing buildings and redevelopment to residential use comprising 2 new dwellings

    Granted Full applications New dwelling Demolition 38 docs
    Several homes
  • Land At White Hall Chelmsford Road Margaret Roding Essex

    UTT/26/0647/OHL Submitted 10 Mar 2026 256m away

    Notice under Electricity Act 1989 Overhead Line (Exemption) (England & Wales) Regulations 2009 - to upgrade the existing LV overhead line from pole 352529 to 352528. Upgrade White Hall Pole-Mounted Transformer to 200kVA and install a lame-leg pole. Install a new terminal pole to the north of the site with two new stays, replace existing HV overhead span to allow for a new terminal pole installation with two new stays. Replace two angle stays at pole 31411

    Decided Other 3 docs
  • Margaret Roding House Chelmsford Road Margaret Roding Essex CM6 1QL

    UTT/26/1335/DOC Submitted 3 Jun 2026 319m away

    Application to discharge condition 5 (method statement and structural drawings) attached to UTT/17/3578/LB

    Decided Conditions 7 docs
  • Margaret Roding House Chelmsford Road Margaret Roding Dunmow Essex CM6 1QL

    UTT/26/1675/LB Submitted 7 Jul 2026 332m away

    79% historically approved · decision due ~1 Sep

    Proposed front-mounted EV charging point, external CCTV cameras, air conditioning system with external condenser, trunking and screening, replacement of UPVC rainwater goods with black painted aluminium and retention of existing timbers in cellar

    Awaiting decision Heritage and listed buildings

In Uttlesford

  • UTT/26/2262/FUL Awaiting decision

    Wire Farm Crawley End Road Chrishall Essex SG8 8QN

    Erection of 1 no. single storey self build dwelling with associated proposed access and landscaping details

    1 Sep 2026 Full applications
  • UTT/26/2222/FUL Awaiting decision

    Site Adjacent Little Jenkins Jenkins Lane Great Hallingbury Hertfordshire CM22 7QL

    Change of use and conversion of existing buildings to provide six self-contained residential dwellings (Use Class C3), together with minor associated extensions and alterations, including the construction of a linking extension and external staircase, and associated landscaping, parking and amenity provision

    27 Aug 2026 Full applications
  • UTT/26/1104/FUL Granted

    Land To The North Of Stewarts Way Manuden

    S73 application to vary condition 34 (part M building regulations) of UTT/25/0343/FUL - to amend the wording of the condition to state that plots 21 and 29 are to be M4(1) compliant (in addition to plots 03 and 04) as opposed to M4(2) compliant, while all other plots that are to be M4(2)/(3) compliant can remain so

    7 May 2026 Full applications
  • UTT/26/2186/FUL Awaiting decision

    35 Wicken Road Newport Essex CB11 3QF

    S73 application to retrospectively vary condition 2 (approved plans) attached to UTT/23/1986/HHF - to reflect as-built plans

    25 Aug 2026 Full applications
  • UTT/26/2169/FUL Awaiting decision

    The Old Armoury 3 Museum Street Saffron Walden Essex CB10 1JN

    Change of use from Class E (offices) to Class C3 (residential) and proposed internal and external renovations and alterations

    24 Aug 2026 Full applications