Skip to content
PlanIndex Get alerts
Menu

Planning application

Pond House Upp End Mallows Green Road Manuden Bishops Stortford CM23 1BT

Granted Uttlesford UTT/26/0392/LB Listed Building

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Remove existing 'modern' tiles, floating timber floors and screed from kitchen, utility room and study area of main dwelling. Replace with new liquid/flow screed (including underfloor heating pipes), new tiles and flooring. Remove existing modern radiators and associated pipework.

As published by the council, reference UTT/26/0392/LB

Application record

Reference
UTT/26/0392/LB
Type
Listed Building
Status
Approved
Decision
Granted As published: Approve with Conditions
Received
16 Feb 2026
Validated
19 Feb 2026
Decided
21 Apr 2026
Ward
Stort Valley
Parish
Manuden
Decision by
Delegated Decision
Postcode
CM23 1BT

Timeline

Dates from the published record

  1. 16 Feb 2026

    Received by Uttlesford

  2. 19 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Apr 2026

    Decision issued: Approve with Conditions

  4. 17 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Donald Purkiss and Associates LLP Agent, registered in Saffron Walden

Active · incorporated 2010 · Saffron Walden

93 applications on PlanIndex · across 4 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Uttlesford granted permission on 21 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

In Uttlesford

  • UTT/26/2364/LB Granted

    3 Station Road Stansted Essex CM24 8BE

    Installation of Gigaclear broadband to external wall

    Received 14 Sep, published by the council 17 Sep 2026 Heritage and listed buildings
  • UTT/26/2688/LB Awaiting decision

    Council Offices London Road Saffron Walden Essex CB11 4ER

    Proposed sign fixed to wall adjacent to main entrance with accompanying letter box.

    Received 21 Oct, published by the council 22 Oct 2026 Heritage and listed buildings
  • UTT/26/2675/LB Awaiting decision

    The Grange Finchingfield Road Little Sampford Essex CB10 2QT

    Proposed removal of the clay roof tiles and dry-fix ridge system installed to the verges and ridges of two roof sections at The Grange (refused under UTT/26/1928/LB), and their replacement with Lifestiles Woburn Finchingfield handmade clay plain tiles, matching handmade ridge tiles and traditional lime mortar-bedded ridges and verges.

    Received 20 Oct, published by the council 21 Oct 2026 Heritage and listed buildings
  • UTT/26/1841/LB Granted

    Little Oak Jollyboys Lane South Felsted Essex CM6 3LR

    Proposed first floor bathroom with associated drainage works, removal of ground floor bathroom, removal of internal walls within rear extension, removal of internal door and infilling of door opening and external redecoration of render to white/cream colour

    Received 21 Jul, published by the council 26 Jul 2026 Heritage and listed buildings
  • UTT/26/2661/LB Awaiting decision

    49 The Close Great Dunmow Essex CM6 1EW

    Selective removal and repair of a section of garden wall. Removal of two existing outbuildings and construction of a new consolidated outbuilding. Replacement of a deteriorated sash window

    Received 19 Oct, published by the council 22 Oct 2026 Heritage and listed buildings