Planning application
Friars Manor Tindon End Great Sampford Essex CB10 2XT
Works: Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Rebuild the existing dwelling including new walls, roof and fenestration, and create a new outdoor swimming pool and a replacement outbuilding. Installation of 3 no. air source heat pumps
As published by the council, reference UTT/22/2405/FUL
Application record
- Reference
- UTT/22/2405/FUL
- Type
- Fully Detailed
- Status
- Approved
- Decision
- Granted As published: Approve with Conditions
- Received
- 31 Aug 2022
- Validated
- 7 Sep 2022
- Decided
- 2 Nov 2022
- Ward
- The Sampfords
- Parish
- Little Sampford
- Decision by
- Delegated Decision
- Postcode
- CB10 2XT
Site history
Applications at this address on the Uttlesford register
This site has had 2 applications since 2022: 2 approved, 0 refused.
-
UTT/26/0051/FUL Granted
Friars Manor Tindon End Great Sampford Essex CB10 2XT
Proposed rebuilding of existing dwelling and creation of new outdoor swimming pool and replacement outbuilding. Installation of 3 no. air source heat pumps.
Timeline
Dates from the published record
-
31 Aug 2022
Received by Uttlesford
-
7 Sep 2022
Validated
Checked as complete and ready for consideration.
-
2 Nov 2022
Decision issued: Approve with Conditions
-
15 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
43 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Uttlesford granted permission on 2 November 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Friars Manor Tindon End Great Sampford Essex CB10 2XT
Proposed rebuilding of existing dwelling and creation of new outdoor swimming pool and replacement outbuilding. Installation of 3 no. air source heat pumps.
Granted Full applications 44 docsSmall domestic -
Westwood Lodge Tindon End Great Sampford Essex CB10 2XT
81% historically approved · decision due ~9 Nov
Two storey side extension with changes to front entrance porch
Awaiting decision ExtensionSmall domestic -
Friars Farm Tindon End Great Sampford Essex CB10 2XT
Proposed garden studio building
Granted Householder 9 docsDomestic -
Friars Farm Tindon End Great Sampford Saffron Walden Essex CB10 2XT
Proposed construction of swimming pool and pool house (seeking to extend permission granted under UTT/1012/11/FUL).
Granted Householder 11 docsDomestic
Other full applications
In Uttlesford
-
UTT/26/1710/FUL Granted
Farm Shop Priors Hall Church End Lindsell Dunmow Essex CM6 3QR
S73 application to vary condition 6 (operating hours) attached to UTT/25/1726/FUL
-
UTT/26/2732/FUL Awaiting decision
Willow Cottage Church Lane White Roding Dunmow Essex CM6 1RN
Construction of a single self-build residential dwelling alongside associated development
-
UTT/26/2736/FUL Awaiting decision
Coopers Farm Philpot End Philpot End Lane Great Dunmow Essex CM6 1JQ
Change of use of part of redundant stables to home gym, with new roof window. Replace two dilapidated timber windows with metal windows.
-
UTT/26/2720/FUL Awaiting decision
Marpa House Rectory Lane Ashdon Essex CB10 2HN
Proposed erection of Stupa
-
UTT/26/2721/FUL Awaiting decision
The Oaks Cornells Lane Widdington Essex CB11 3SP
S73 application to vary condition 2 (approved plans) and to remove conditions 4 (landscaping), 6 (construction management plan), 8 (biodiversity enhancement strategy) and 9 (lighting for biodiversity) attached to UTT/25/0580/FUL