Skip to content
PlanIndex Get alerts
Menu

Planning application

Land South Of Green Corners Latchmore Bank Little Hallingbury Hertfordshire

Granted Uttlesford UTT/22/1886/NMA Non Material Amendment

Works: Extension Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non material amendment to UTT/21/1121/DFO- Plots 2 and 4 revised elevations treatments, insertion of rooflights and additional opening added to side and rear elevation. Plots 3 and 5 revised elevation treatments, flat roof with glazed lantern to rear extension to replace pitched roof. Plots 4 and 5 positions slightly amended

As published by the council, reference UTT/22/1886/NMA

Application record

Reference
UTT/22/1886/NMA
Type
Non Material Amendment
Status
Approved
Decision
Approve
Received
5 Jul 2022
Validated
5 Jul 2022
Decided
10 Aug 2022
Ward
Broad Oak And The Hallingburys
Parish
Little Hallingbury
Decision by
Delegated Decision

Site history

Applications at this address on the Uttlesford register

This site has had 3 applications since 2022: 3 approved, 0 refused.

  • UTT/22/1820/DOC Granted

    Land South Of Green Corners Latchmore Bank Little Hallingbury Hertfordshire

    Application to discharge condition 5 (Biodiversity enhancement layout), 6 (lighting design scheme) and 7 (Badger survey) attached to UTT/21/1121/DFO.

    Decided 7 Sep 2022 Conditions
  • UTT/22/1614/DOC Granted

    Land South Of Green Corners Latchmore Bank Little Hallingbury Hertfordshire

    Application to discharge condition 1 (materials) attached to UTT/21/1121/DFO.

    Decided 13 Jul 2022 Conditions

Timeline

Dates from the published record

  1. 5 Jul 2022

    Received by Uttlesford

  2. 10 Aug 2022

    Decision issued: Approve

  3. 23 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Uttlesford granted permission on 10 August 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Uttlesford

  • UTT/26/2406/NMA Awaiting decision

    The Manor House (Coach House) Church Road Stansted Essex CM24 8PZ

    Non material Amendment to UTT/25/2140/FUL - addition of a roof light into small flat roof section

    17 Sep 2026 Amendments
  • UTT/26/2346/NMA Decided

    Bluegates Farm Stortford Road Great Dunmow Essex CM6 1SN

    Non-material amendment to UTT/25/2655/FUL - variations to window/door arrangement to proposed units

    11 Sep 2026 Amendments
  • UTT/26/2332/NMA Awaiting decision

    Cage End House Cage End Hatfield Broad Oak Essex CM22 7HT

    Non-material amendment to UTT/0641/11/FUL - additional weatherboarding, bottom of jetty walls lifted, additional porch bracket, fascia to front and rear elevation and simplified dormer fascia to side elevations, reduction in size of bifold doors, increased width of ground floor side window and different brick material.

    10 Sep 2026 Amendments
  • UTT/26/2327/NMA Awaiting decision

    Dovecote Lower Road Little Hallingbury Bishops Stortford Hertfordshire CM22 7QZ

    Non-material amendment to UTT/25/2455/FUL - change to front pitch of the approved roof slope.

    8 Sep 2026 Amendments
  • UTT/26/1992/NMA Granted

    1 Easton View Bambers Green Road Takeley Bishops Stortford CM22 6PA

    Non-material amendment to UTT/25/0925/HHF - omission of render finish to 1st floor level and addition of composite weatherboarding

    4 Aug 2026 Amendments