Planning application
Deans Meadow Wicken Road Arkesden CB11 4EY
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Application to discharge condition 2 (materials), 4 (Badger method statement), 5 (Biodiversity enhancement layout), 6 (lighting design scheme), 7 (Ecology time limits) and 8 (hard/soft landscaping) attached to UTT/21/2204/FUL.
As published by the council, reference UTT/22/1840/DOC
Application record
- Reference
- UTT/22/1840/DOC
- Type
- Discharge of Conditions
- Status
- Discharge Conditons in Full
- Decision
- Discharge Conditions in Full
- Received
- 30 Jun 2022
- Validated
- 1 Jul 2022
- Decided
- 5 Sep 2022
- Ward
- Clavering
- Parish
- Arkesden
- Decision by
- Delegated Decision
- Postcode
- CB11 4EY
Timeline
Dates from the published record
-
30 Jun 2022
Received by Uttlesford
-
1 Jul 2022
Validated
Checked as complete and ready for consideration.
-
5 Sep 2022
Decision issued: Discharge Conditions in Full
-
17 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
6 applications on PlanIndex · across 5 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
Deans Meadow Wicken Road Arkesden CB11 4EY
Demolition of swimming pool and associated structures and erection of 1 no. detached dwelling with garage and new access from Wicken Road.
Granted Full applications New dwelling Demolition 33 docsDomestic -
Deans Meadow Wicken Road Arkesden CB11 4EY
Removal of swimming pool and pool house, erection of detached house and creation of new access for existing dwelling house
Granted Full applications New dwelling 40 docsDomestic -
Domestic
-
September Hill Wicken Road Arkesden Essex CB11 4EY
Application to discharge condition 2 (Biodiversity enhancement) attached to UTT/21/2729/HHF.
Refused Conditions 8 docs -
September Hill Wicken Road Arkesden Essex CB11 4EY
Application to discharge condition 3 (materials), 4 (hard/soft landscaping), 13 (badger method statement) and 14 (Biodiversity enhancement layout) attached to UTT/21/1293/FUL.
Decided Conditions 10 docs -
September Hill Wicken Road Arkesden Essex CB11 4EY
Application to discharge condition 13 (Badger Method Statement) attached to UTT/21/1293/FUL.
Decided Conditions 7 docs
Other conditions applications
In Uttlesford
-
UTT/26/2306/DOC Awaiting decision
Staines Farm Henham Road Debden Essex CB11 3NA
Application to discharge conditions 8 (Hard and Soft Landscaping) 9 (Biodiversity Enhancement Strategy) 10 (Lighting Design Scheme) 16 (External Lighting) attached to UTT/25/2144/FUL
-
UTT/26/2297/DOC Awaiting decision
Toad Hall Chapel End Broxted Essex CM6 2BW
Application to discharge condition 6 (Construction Environmental Management Plan) 7 (Biodiversity Enhancement Strategy) 12 (Noise Mitigation) attached to UTT/25/1970/FUL
-
UTT/26/2294/DOC Awaiting decision
Badcock Farm Land Newpasture Lane Saling Road Stebbing Essex CM6 3TD
Application to discharge conditions 3 (Demolition and Construction Environmental Management Plan) 4 (Surface Water Drainage) 5 (Infiltration Testing) 6 (Discharge Arrangements) 8 (Maintenance and Management Plan) 12 (Biodiversity Enhancement Strategy) 13 (External Materials) attached to UTT/25/3313/FUL
-
UTT/26/2292/DOC Awaiting decision
3 Church Path Saffron Walden Essex CB10 1JP
Application to discharge condition 3 (staircase details) attached to UTT/26/0798/LB
-
UTT/26/2264/DOC Awaiting decision
Warehouse Elizabeth Way Saffron Walden Essex CB10 2BL
Application to discharge conditions 7 (External Lighting) 8 (Lighting Design Strategy for Biodiversity) 10 (Refuse and Recycling) attached to UTT/26/1023/FUL