Planning application
2 The Cottage Church End Great Canfield Dunmow Essex CM6 1JT
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Replacement of stable door.
As published by the council, reference UTT/20/2435/CLLB
Application record
- Reference
- UTT/20/2435/CLLB
- Type
- Listed Build Cert of Lawfulness Prop
- Status
- Refused
- Decision
- Refuse Certificate Lawfulness
- Received
- 24 Sep 2020
- Validated
- 1 Oct 2020
- Decided
- 5 Nov 2020
- Ward
- Broad Oak And The Hallingburys
- Parish
- Great Canfield
- Decision by
- Delegated Decision
- Postcode
- CM6 1JT
Timeline
Dates from the published record
-
24 Sep 2020
Received by Uttlesford
-
1 Oct 2020
Validated
Checked as complete and ready for consideration.
-
5 Nov 2020
Decision issued: Refuse Certificate Lawfulness
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About lawful development applications
How this application type works
A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.
Nearby applications
Within 500 metres
-
Rodingbourne Church End Great Canfield Dunmow Essex CM6 1JT
94% historically approved · decision due ~3 Sep
Remove two branches from 1 no. Ash
Awaiting decision Trees -
Rodingbourne Church End Great Canfield Dunmow Essex CM6 1JT
94% historically approved · decision due ~3 Aug
Reduce crown of 1 no. Ash by 2 metres
Awaiting decision Trees -
The Gables Church End Great Canfield Dunmow Essex CM6 1JT
Tidy up, cut back overhanging branches and side branches of the small bushes to the front of the property
Granted Trees 4 docs -
St Marys Church Church End Great Canfield Essex CM6 3QR
1. Fell to ground level no.1 dead tree along the right hand boundary . 2. Raise all the trees on site to 2.5m above ground level including the large Beech trees along the left side of the boundary.
Granted Trees 13 docs -
Rodingbourne Church End Great Canfield CM6 1JT
Rebuilding of the existing coach house, restoring it to its previous structural integrity
Refused Householder 33 docsDomestic -
Rodingbourne Church End Great Canfield CM6 1JT
Construction of a timber cart-lodge garage.
Granted Householder 16 docsDomestic
Other lawful development applications
In Uttlesford
-
UTT/26/2286/CLP Awaiting decision
2 Endways Cottage Stickling Green Clavering Essex CB11 4QX
Replacing roof on existing conservatory
-
UTT/26/2243/CLP Decided
Cantlow House Little London Lane Berden Essex CM23 1BD
Change of roof covering from thatch to handmade plain tiles.
-
UTT/26/2196/CLE Awaiting decision
Brook Barn Stebbing Road Felsted Essex CM6 3LQ
Existing cartlodge for use as covered parking bays and annexe accommodation
-
UTT/26/2155/CLP Awaiting decision
Pippins Wrights Green Little Hallingbury Essex CM22 7RH
Proposed outdoor swimming pool and associated pool plant room and air-source/fan-coil equipment within the residential curtilage of the dwelling.
-
UTT/26/2136/CLP Awaiting decision
Cricket Ground Dunmow Road High Roding Essex CM6 1NL
Removing existing concrete base and replacing with compacted aggregate base which is smaller than the existing. We are also replacing the metal poles and nets like for like, also slightly reduced.