Planning application

Power Station 132 Manchester Road Carrington Manchester M31 4AY

Awaiting decision Trafford 119447/FUL/26 Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of a purpose-built Protection and Control Room building with associated equipment and minor works.

As published by the council, reference 119447/FUL/26

Application record

Reference
119447/FUL/26
Type
Full Application
Status
Awaiting decision
Received
24 Jun 2026
Validated
3 Aug 2026
Ward
Bucklow St Martins
Parish
Carrington Parish Council
Postcode
M31 4AY

Timeline

Dates from the published record

  1. 24 Jun 2026

    Received by Trafford

  2. 3 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 28 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Trafford took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Trafford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Power Station 132 Manchester Road Carrington Manchester M31 4AY

    119804/NMA/26 Submitted 17 Aug 2026 0m away

    Application for non-material amendment (114439/FUL/24) to allow for extended hours of construction work to be undertaken between 30th August 2026 and 7th September 2026.

    Granted Amendments 4 docs
  • Power Station, 132 Manchester Road, Carrington, M31 4AY

    23/81312/LPACON Submitted 27 Feb 2023 0m away

    Consultation from Trafford Council on Application No 110320/FUL/23 for Construction of a 1,040 MW Battery Energy Storage System (BESS) facility comprising: containerised battery units with transformer units and inverter cabinets; internal access tracks; electrical substation compounds including tansformers and associated switchgear equipment; infrared CCTV fixed on poles; perimeter fencing; underground surface water drainage infrastructure; vehicular parking area; and site welfare facilities.

    Granted Outline 21 docs
  • Power Station 132 Manchester Road Carrington Manchester M31 4AY

    119526/CND/26 Submitted 8 Jul 2026 0m away

    Application for approval of details reserved by conditions of grant of planning permission 116280/VAR/25. Condition number: 4 (Contaminated Land).

    Decided Conditions 4 docs
  • Power Station, 132 Manchester Road, Carrington, M31 4AY

    21/78258/LPACON Submitted 9 Aug 2021 0m away

    Consultation from Trafford Council (reference number 105316/HYB/21) for the Hybrid application comprising: (a) Full application for the creation of a green hydrogen production facility (10MW capacity, circa 4 tonnes of hydrogen production per day), including battery storage, compressors, hydrogen storage and tanker loading facilities. (b) Outline application for expanded green hydrogen production facility within wider site (200MW capacity, up to 50 tonnes of hydrogen storage).

    Granted Outline 6 docs

In Trafford

  • 119543/FUL/26 Granted

    Essity UK Ltd Trafford Park Road Trafford Park Manchester M17 1EQ

    Application for removal of redundant roof ventilation plant and replacement with new plant equipment services.

    10 Jul 2026 Full applications
  • 118583/FUL/26 Granted

    Springfield Primary School Springfield Road Sale M33 7XS

    Installation of flood lights around the multi-use games area (sports pitch)

    10 Mar 2026 Full applications
  • 118502/FUL/26 Granted

    Thorn Bank Barrow Lane Hale Barns Altrincham WA15 0DN

    Erection of a proposed two storey dwelling with new access, landscaping and associated work.

    27 Feb 2026 Full applications
  • 118699/FUL/26 Granted

    5 - 9 Crofts Bank Road Urmston Manchester M41 0TZ

    Conversion of upper floors from bank to 7 no. apartments in conjunction with the use of the ground floor as a restaurant. Associated alterations to front and rear elevations including the creation of an external staircase, new external access and boundary treatments.

    23 Mar 2026 Full applications
  • 119840/FUL/26 Awaiting decision

    Unit 1 The Square Hale Road Hale Barns Altrincham WA15 8ZN

    Minor alteration to an existing glazed window on the southern elevation to allow for the installation of a hatch

    21 Aug 2026 Full applications