Planning application

Bow Business Centre Bow House, 157 Bow Road, London E3

Granted Tower Hamlets PA/26/01571/NC

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed refurbishment and fire safety improvement works comprising the replacement of the existi...

As published by the council, reference PA/26/01571/NC

Application record

Reference
PA/26/01571/NC
Status
Decided
Decision
Granted As published: Permit
Validated
10 Sep 2026
Decided
3 Nov 2026
Ward
Bow East
Decision by
Delegated

Site history

Applications at this address on the Tower Hamlets register

This site has had 3 applications since 2025: 3 approved, 0 refused.

  • PA/26/01572/NC Granted

    Bow Business Centre Bow House, 157 Bow Road, London E3

    Proposed refurbishment and fire safety improvement works comprising the replacement of the existi...

    Decided 3 Nov 2026
  • PA/25/02016/NC Granted

    Bow Business Centre Bow House, 157 Bow Road, London E3

    Section 19 application to vary condition 2 (approved drawings) to application PA/25/01263

    Decided 20 Jan 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 10 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  2. 18 Sep 2026

    Added to PlanIndex

  3. 3 Nov 2026

    Decision issued: Permit

  4. 3 Nov 2026

    Status changed to Decided

    Previously Registered.

Documents

The council's own list, drawings first

21 documents on file for this application

Drawings (15)

  • Proposed render system elevations 11 Sep 2026
  • Proposed elevation 11 Sep 2026
  • Proposed render system construction 11 Sep 2026
  • Combined aov and roof access proposed floor and main roof 11 Sep 2026
  • Proposed terrace roof coverings 11 Sep 2026
  • New aov to west stair proposed 11 Sep 2026
  • Terraces lead drainage chutes proposed 11 Sep 2026
  • Location plan 11 Sep 2026
  • Existing render system elevations 11 Sep 2026
  • Existing elevation 11 Sep 2026
  • Existing render system construction 11 Sep 2026
  • Combined aov and roof access existing floor and main roof 11 Sep 2026
  • Existing terrace roof coverings 11 Sep 2026
  • New aov to west stair existing 11 Sep 2026
  • Terraces lead drainage chutes existing 11 Sep 2026

Everything on file (21)

  • LOCATION PLAN OS Extract · 11 Sep 2026
  • TECHNICAL NOTICE - REVIEW OF PROPOSED CURTAIN WALL AND SPANDREL Correspondence · 11 Sep 2026
  • TECHNICAL NOTE - PLYWOOD SHEATHING ENCAPSULATION STRATEGY Report · 11 Sep 2026
  • RETROSPECTIVE FIRE SAFETY STRATEGY REPORT Report · 11 Sep 2026
  • STRUCTURAL CALCULATIONS Report · 11 Sep 2026
  • EXISTING RENDER SYSTEM ELEVATIONS Current Plan · 11 Sep 2026
  • EXISTING RENDER SYSTEM CONSTRUCTION Current Plan · 11 Sep 2026
  • PROPOSED RENDER SYSTEM ELEVATIONS Current Plan · 11 Sep 2026
  • PROPOSED RENDER SYSTEM CONSTRUCTION Current Plan · 11 Sep 2026
  • COMBINED AOV AND ROOF ACCESS - EXISTING 6TH FLOOR AND MAIN ROOF Current Plan · 11 Sep 2026
  • COMBINED AOV AND ROOF ACCESS - EXISTING ELEVATION Current Plan · 11 Sep 2026
  • COMBINED AOV AND ROOF ACCESS - PROPOSED 6TH FLOOR AND MAIN ROOF Current Plan · 11 Sep 2026
  • COMBINED AOV AND ROOF ACCESS - PROPOSED ELEVATION Current Plan · 11 Sep 2026
  • EXISTING TERRACE ROOF COVERINGS Current Plan · 11 Sep 2026
  • PROPOSED TERRACE ROOF COVERINGS Current Plan · 11 Sep 2026
  • NEW AOV TO WEST STAIR - EXISTING Current Plan · 11 Sep 2026
  • NEW AOV TO WEST STAIR - PROPOSED Current Plan · 11 Sep 2026
  • TERRACES LEAD DRAINAGE CHUTES EXISTING Current Plan · 11 Sep 2026
  • TERRACES LEAD DRAINAGE CHUTES PROPOSED Current Plan · 11 Sep 2026
  • FIRE STATEMENT Report · 11 Sep 2026
  • PROPOSED RENDER SYSTEM - WETHERBY ETICS SYSTEM Correspondence · 11 Sep 2026

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you the drawings on every job in your area. 14 days free.

What this grant of permission means

Tower Hamlets granted permission on 3 November 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.