Skip to content
PlanIndex Get alerts
Menu

Planning application

Faraday House, Brightlingsea Place, London, E14 8DA

Awaiting decision Tower Hamlets PA/26/01503/NC

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed replacement of all existing timber sliding sash windows with double-glazed uPVC vertical...

As published by the council, reference PA/26/01503/NC

Application record

Reference
PA/26/01503/NC
Status
Registered
Validated
26 Aug 2026
Ward
Limehouse
Decision by
Delegated
Postcode
E14 8DA

Timeline

Dates from the published record

  1. 26 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  2. 8 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 21 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tower Hamlets took a median of 56 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Beckenham

238 applications on PlanIndex · across 10 councils · 96% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

  • EXISTING ELEVATIONS Current Plan · 26 Aug 2026
  • REASONABLE EXCEPTION STATEMENT Correspondence · 26 Aug 2026
  • SUSTAINABILITY STATEMENT Report · 26 Aug 2026
  • INCLUDING HERITAGE AND PLANNING STATEMENTS Design & Access Statement · 26 Aug 2026
  • LOCATION PLAN OS Extract · 26 Aug 2026
  • EXISTING AND PROPOSED WINDOW AND DOOR SCHEDULE Current Plan · 26 Aug 2026
  • PROPOSED ELEVATIONS Current Plan · 26 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets's median decision took 56 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • The Grapes Public House, 76 Narrow Street, London, E14 8BP

    PA/26/00527/NC Submitted 24 Mar 2026 88m away

    Listed Building Consent for emergency repair works to rear elevation balcony, including timber supports and repairs to existing foreshore access stairs

    Granted Heritage and listed buildings 11 docs
  • One Hundred and Thirty Six and a Half, 136 Narrow Street, London, E14 8BP

    PA/26/01111/NC Submitted 7 Jul 2026 108m away

    91% historically approved · decision due ~1 Sep

    Reinstate existing infilled basement

    Awaiting decision
  • One Hundred and Thirty Six and a Half, 136 Narrow Street, London, E14 8BP

    PA/26/01112/NC Submitted 7 Jul 2026 108m away

    91% historically approved · decision due ~1 Sep

    Reinstate existing infilled basement

    Awaiting decision
  • Flat 8, Molines Wharf, 100 Narrow Street, London, E14 8BP

    PA/26/01302/NC Submitted 4 Aug 2026 108m away

    91% historically approved · decision due ~29 Sep

    Application for certificate of Lawfulness in respect of proposed Installation of Heat Pump on Bal...

    Awaiting decision
  • Block F, Basin Approach, London, E14 7JS

    PA/25/01971/NC Submitted 26 Nov 2025 155m away

    Application for certificate of Lawfulness in respect of existing external works of combustible materials replaced with non-combustible materials.

    Granted Amendments 15 docs
  • Kiln Court, 18 Newell Street, London E14

    PA/25/01856/NC Submitted 10 Nov 2025 183m away

    85% historically approved · decision due ~5 Jan

    Proposed works comprise the recovery of the main flat roofs, including the application of tapered insulation, as well as the refurbishment of lower roofs, walkways, and balconies. Thermal insulation will be upgraded where necessary. Rainwater management will be improved by increasing the number and size of outlets across the main roofs, lower roofs, and balconies, with emergency overflows provided. All rainwater pipes will be installed externally. Steel parapet capping sheets will be fitted to all concrete parapet walls.

    Awaiting decision Full applications 77 docs