Planning application
50 St Katharines Way, London, E1W 1LA
Works: Trees
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Tree works: (T4) Holm oak- Raise canopy to 2.5m above ground level Liquidamber (T8) - London Pl...
As published by the council, reference PA/26/01431/NC
Application record
- Reference
- PA/26/01431/NC
- Status
- Registered
- Validated
- 13 Aug 2026
- Postcode
- E1W 1LA
Timeline
Dates from the published record
-
13 Aug 2026
Validated
Checked as complete and ready for consideration.
-
25 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tower Hamlets took a median of 56 days over the applications it decided in the last year.
What happens while it is decided
This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets's median decision took 56 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Unit 12, Ivory House, East Smithfield, London, E1W 1BW
Works to T13/T14 (London Plane Trees) - Re-pollard by 4m to previous points.
Granted Trees 6 docs -
Tower Guoman Hotel, St Katharines Way, London, E1W 1LD
85% historically approved · decision due ~10 Mar
Proposed change of use of maintenance workshop/storage area to Class E(b) restaurant unit operated by the hotel, including alterations to existing facades and additional plant on the open mezzanine above.
Awaiting decision Full applications 17 docs -
Tower Thistle Hotel, 10 St Katharines Way, London, E1W 1LD
91% historically approved · decision due ~17 Sep
Installation of 3no new satellite dishes and one new tv aerial to existing roof.
Awaiting decision -
Tower Bridge Quay, Tower Bridge Approach, London E1W
85% historically approved · decision due ~22 May
Proposed installation of a floating barge at Tower Bridge Quay to facilitate the charging and operation of a zero-emission electric light goods ferry service.
Awaiting decision Full applications 37 docs -
Tower Wharf, Tower of London and Arches beneath Tower Bridge, Tower Bridge Approach, London, EC3N 4AB
Application for Non-Material amendment to planning permission ref: PA/25/00620, Dated 30/06/2025. Non Material amendment(s) Sought: Reconfiguration of Reveller entrance doors Alterations to doors within Moat Arches Increase in ASHP enclosure footprint
Granted Amendments 56 docs -
Tower Wharf, Tower of London and Arches beneath Tower Bridge, Tower Bridge Approach, London, EC3N 4AB
Application under Section 19 for minor material amendments to Listed Building Consent Ref: PA/25/00621, Dated 30/06/2025, which sought consent for: Change of use and refurbishment of the existing Reveller Building to form a Learning Centre to provide enhanced schools and communities facilities in association with the Tower of London (Sui Generis use), conversion and connection of the existing arches of Tower Bridge Approach to provide a dedicated school's entrance to the adjacent Moat, and other associated works. Amendment(s) sought, to vary Condition 2 (Approved plans): Reconfiguration of Reveller entrance doors Alterations to doors within Moat Arches Increase in ASHP enclosure footprint
Granted Conditions 57 docs