Planning application
Flat 530 Lexington Building, Bow Quarter, 60 Fairfield Road, London, E3 2UF
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of existing damaged uPVC balcony doors with aluminium bi-fold doors on a like-for-lik...
As published by the council, reference PA/26/01363/NC
Application record
- Reference
- PA/26/01363/NC
- Status
- Decided
- Decision
- Granted As published: Permit
- Received
- 18 Aug 2026
- Validated
- 18 Aug 2026
- Decided
- 5 Oct 2026
- Ward
- Bow East
- Decision by
- Delegated
- Postcode
- E3 2UF
Site history
Applications at this address on the Tower Hamlets register
This site has had 2 applications since 2026: 2 approved, 0 refused.
-
PA/26/01364/NC Granted
Flat 530 Lexington Building, Bow Quarter, 60 Fairfield Road, London, E3 2UF
Replacement of existing damaged uPVC balcony doors with aluminium bi-fold doors on a like-for-lik...
Timeline
Dates from the published record
-
18 Aug 2026
Received by Tower Hamlets
-
25 Aug 2026
Added to PlanIndex
-
5 Oct 2026
Decision issued: Permit
-
5 Oct 2026
Status changed to Decided
Previously Registered.
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Tower Hamlets granted permission on 5 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Flat 530 Lexington Building, Bow Quarter, 60 Fairfield Road, London, E3 2UF
Replacement of existing damaged uPVC balcony doors with aluminium bi-fold doors on a like-for-lik...
Granted Windows or glazing 2 docs -
Flat 223 Lexington Building, Bow Quarter, 60 Fairfield Road, London, E3 2UE
Internal alterations including removal of the existing mezzanine bedroom, extension of the mezzan...
Granted Extension -
Flat 513 Lexington Building, Bow Quarter, 60 Fairfield Road, London, E3 2UF
Proposed replacement external glazing, replacement of existing rooflight and new rooflight and new air source heat pump located on balcony. Internal alterations to include, removal of the short wall between the kitchen and the living room, enlargement of the tiled floor area in the kitchen, under floor heating to the lower level, thermal upgrades of the existing external walls, new staircase, extension of the existing mezzanine to create additional floor space and other minor associated works.
Granted Heritage and listed buildings Extension Loft or dormer +1 4 docs -
Flat 513 Lexington Building, Bow Quarter, 60 Fairfield Road, London, E3 2UF
Proposed replacement external glazing, replacement of existing rooflight and new rooflight and new air source heat pump located on balcony. Internal alterations to include, removal of the short wall between the kitchen and the living room, enlargement of the tiled floor area in the kitchen, under floor heating to the lower level, thermal upgrades of the existing external walls, new staircase, extension of the existing mezzanine to create additional floor space and other minor associated works.
Granted Full applications Extension Loft or dormer +1 14 docs -
Flat 541 Manhattan Building, Bow Quarter, 60 Fairfield Road, London, E3 2UP
Listed Building Consent for the retention of internal alterations, comprising the removal of an existing non-load bearing stud partition between the kitchen and dining room to create an open-plan living space to improve the functionality of the kitchen space. The works also include removal of existing and installation of new kitchen units, cabinets, and appliances.
Granted Heritage and listed buildings 6 docs -
Flat 339 Manhattan Building, Bow Quarter, 60 Fairfield Road, London, E3 2UQ
Removal of the enclosed office space and its associated stud walls. Removal of the existing staircase and reinstatement of the original 1988 staircase in its former position. Reinstatement of the balustrades to ensure protection against falls from height. Removal of small sections of stud walls to enlarge the wardrobe area. The reinstated staircase and balustrade are the original black-painted metal components removed under the previous application. New stud walls will be constructed from painted gypsum board to match the existing finishes.
Granted Heritage and listed buildings 9 docs