Planning application

FORMER NATIONAL GRID SITE, MILLENNIUM WAY, GREENWICH, SE10 0BB

Awaiting decision Tower Hamlets PA/26/01255/NC

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Observation requested by Royal borough of Greenwich for Construction of two buildings for use as ...

As published by the council, reference PA/26/01255/NC

Application record

Reference
PA/26/01255/NC
Status
Registered
Validated
22 Jul 2026
Postcode
SE10 0BB

Timeline

Dates from the published record

  1. 22 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  2. 3 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 16 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tower Hamlets took a median of 56 days over the applications it decided in the last year.

What happens while it is decided

This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets's median decision took 56 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • FORMER NATIONAL GRID SITE, MILLENNIUM WAY, GREENWICH, SE10 0BB

    26/2018/F Submitted 7 Jul 2026 0m away

    74% historically approved · decision due ~1 Sep

    Construction of two buildings for use as Purpose Built Student Accommodation (PBSA) (sui generis)...

    Awaiting decision Full applications 162 docs
  • UNIT 2, VICTORIA DEEP WATER TERMINAL, TUNNEL AVENUE, GREENWICH, LONDON, SE10 0QE

    25/1660/SD Submitted 21 May 2025 229m away

    Submission of details pursuant to the discharge of Condition 18 (River Wall Survey) and Condition 19 (River Wall Strengthening and Habitat Enhancement) of planning permission 16/3478/F dated 20/06/2019, as amended by 20/0545/NM.

    Granted Conditions 67 docs
  • LAND AT BAY WHARF, TUNNEL AVENUE, GREENWICH, SE10 0QE

    26/0706/F Submitted 5 Mar 2026 229m away

    74% historically approved · decision due ~30 Apr

    Use of the land for Class B8 (storage and distribution) purposes, temporary installation of buildings, storage units and containers, installation of fencing, parking, external storage bays and drainage infrastructure, and other infrastructure and ancillary works.

    Awaiting decision Full applications 22 docs
  • Golf Driving Range, 265 TUNNEL AVENUE, LONDON, SE10 0QE

    25/3802/NM Submitted 11 Nov 2025 229m away

    An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the planning permission dated 21/10/2024 (Reference: 24/1818/MA) for Temporary use of the land for 10 years for the construction of a Golf Driving Range, including mini golf / family amenity area, Club House, retail units, café, floodlighting, associated car and cycle parking, landscaping, infrastructure and public footpath diversion. This amendment seeks the introduction of a replacement netting system.

    Granted Amendments 8 docs
  • 265 TUNNEL AVENUE, LONDON, SE10 0QE

    24/1818/MA Submitted 6 Jun 2024 229m away

    An application under S73 of the Town and Country Planning Act 1990 for a minor material amendment to planning permission 14/2161/F dated 09/02/2015 for Temporary use of the land for 10 years for the construction of a Golf Driving Range, including mini golf / family amenity area, Club House, retail units, café, floodlighting, associated car and cycle parking, landscaping, infrastructure and public footpath diversion, to allow: Vary Condition 2 (Expiration of Planning Permission) to extend the period of the temporary Golf Driving Range for a further 10-year period. Update the plans listed under Condition 1 (Approved Drawings) with those amended to reflect the as built development. Variation of the wording of the following conditions to compliance conditions with reference to details included within this application: Condition 3 (Facing Materials), Condition 4 (Hard and Soft Landscaping), Condition 6 (External Lighting), Condition 8 (Artificial Light/Illumination Validation Test), Condition 14 (London Underground Infrastructure Protection), Condition 15 (Delivery and Servicing Plan), Condition 16 (Car Park Management), Condition 17 (Cycle Parking), Condition 18 (Refuse and Recycling), Condition 22 (Wayfinding and Signage Strategy), Condition 24 (Mini Golf/Family Amenity Area), Condition 25 (Ecological Assessment Report), Condition 27 (Control of Invasive Plants), Condition 29 (Verification report), Condition 31 (surface water drainage scheme), Condition 32 (flood evacuation plan), Condition 33 (rainwater harvesting), Condition 34 (secure by design), Condition 35 (travel plan). Deletion of the following conditions: Condition 10 (Demolition and Construction Method Statement), Condition 13 (Construction Logistics Plan), Condition 20 (Monitoring Dust and Noise), Condition 21 (Archaeology), Condition 26 (Timing of vegetation clearance), Condition 28 (Contaminated Land), Condition 30 (Unsuspected contamination).

    Granted Amendments Demolition 63 docs
  • Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF

    25/3952/NM Submitted 24 Nov 2025 230m away

    An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: Design alterations to the central circulation core to comply with fire regulations; Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios. Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms. Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O. Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade. Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing. Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15. Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.

    Granted Amendments Windows or glazing Trees 61 docs