Planning application
11 Havering Street, London, E1 0LP
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Listed Building Consent for the removal of a non- structural wall between the toilet and the bath...
As published by the council, reference PA/26/01030/NC
Application record
- Reference
- PA/26/01030/NC
- Status
- Registered
- Validated
- 1 Sep 2026
- Postcode
- E1 0LP
Timeline
Dates from the published record
-
1 Sep 2026
Validated
Checked as complete and ready for consideration.
-
4 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tower Hamlets took a median of 56 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Tower Hamlets for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Tower Hamlets is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
37 Havering Street, London, E1 0LP
Replacement of existing uPVC front door and fanlight with new timber-framed door and timber-framed fanlight, designed to match the traditional style and detailing of neighbouring properties. All works will be sympathetically undertaken using traditional methods of construction.
Granted Heritage and listed buildings 7 docs -
33 Havering Street, London, E1 0LP
Replacement of existing uPVC front door and fanlight with new timber-framed door and timber-framed fanlight, designed to match the traditional style and detailing of neighbouring properties. All works will be sympathetically undertaken using traditional methods of construction.
Granted Heritage and listed buildings 8 docs -
40 Havering Street, London, E1 0LP
Replacement of existing UPVC front door and fanlight with new timber framed door and timber framed fanlight, designed to match the traditional style and detailling of neighbouring properties. All works will be sympathetically undertaken using traditional methods of construction.
Granted Heritage and listed buildings 8 docs -
29 Havering Street, London, E1 0LP
Replacement of existing composite door with a new door with the same original six panel Georgian door to keep the historic fabric of the conservation area.
Granted Heritage and listed buildings 10 docs -
Railway Arches, 203 Barnardo Street, London, E1 0LL
91% historically approved · decision due ~18 Sep
Change of use of part existing workshop to accommodate a Class 4 MOT centre.
Awaiting decision -
Create Day Centre, 35 Ronald Street, London, E1 0DT
91% historically approved · decision due ~8 Sep
Installation of a new heating, cooling and ventilation system including 1 no. roof-mounted mechan...
Awaiting decision