Skip to content
PlanIndex Get alerts
Menu

Planning application

St George in the East Gardens, London E1 0BH

Awaiting decision Tower Hamlets PA/26/00967/NC

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of (relocated) gravestones (gravestones removed under planning permission PA/24/01804 an...

As published by the council, reference PA/26/00967/NC

Application record

Reference
PA/26/00967/NC
Status
Registered
Validated
19 Jun 2026
Postcode
E1 0BH

Timeline

Dates from the published record

  1. 19 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 14 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tower Hamlets took a median of 56 days over the applications it decided in the last year.

What happens while it is decided

This application is with Tower Hamlets for determination, against a statutory target of eight weeks. Over the last year Tower Hamlets's median decision took 56 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Caxton Apartments, 172 Cable Street, London E1 0EY

    PA/25/02207/NC Submitted 19 Dec 2025 76m away

    Application for certificate of lawfulness in relation to a proposal consisting of remediation works to the façade of St. Georges Estate, Site 7 - Caxton Apartments. Proposed works include removal of areas of present combustible materials in the building elevations and replace with non-combustible alternatives with minimal visual impact to the existing development.

    Granted Outline New dwelling 20 docs
  • St George-in-the-East Church, 14 Cannon Street Road, London E1

    PA/26/00581 Submitted 7 Apr 2026 81m away

    Works to T1-Lime Tree - reduce leaving 5m stem due to poorly formed stem union and TG1-Lime Tree x4 - repollard by reducing branches height and lateral branches by 2-2.5m, remove dead branches with a diameter between 2-4m.

    Granted Trees 4 docs
  • St George-in-the-East Church, 14 Cannon Street Road, London E1

    PA/26/00581/NC Submitted 7 Apr 2026 81m away

    Works to T1-Lime Tree - reduce leaving 5m stem due to poorly formed stem union and TG1-Lime Tree x4 - repollard by reducing branches height and lateral branches by 2-2.5m, remove dead branches with a diameter between 2-4m.

    Granted Trees 4 docs
  • Flat 48, Newton House, Cornwall Street, London, E1 2QP

    PA/26/00214/NC Submitted 5 Feb 2026 92m away

    Proposed installation of extractor fan in bathroom with associated outward pipe work

    Granted Full applications 4 docs
  • Garamond Building, 2 Crowder Street, London E1

    PA/25/02208/NC Submitted 19 Dec 2025 96m away

    Application for certificate of lawfulness in respect of proposal consisting of remediation works to the façade of St. Georges Estate, Site 6 - Garamond Building. Proposed works include removal of areas of present combustible materials in the building elevations and replace with non-combustible alternatives with minimal visual impact to the existing development.

    Granted Outline 18 docs
  • Chi Building, 54 Crowder Street, London, E1 0EZ

    PA/26/01136/NC Submitted 15 Jul 2026 125m away

    91% historically approved · decision due ~9 Sep

    Application for Certificate of Lawfulness in respect of proposed remediation works to the elevati...

    Decided