Skip to content
PlanIndex Get alerts
Menu

Planning application

12 to 54 Stayners Road, London, E1 4AH

Granted Tower Hamlets PA/26/00791/NC Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of PV panels and associated external alterations to the roof level.

As published by the council, reference PA/26/00791/NC

Application record

Reference
PA/26/00791/NC
Type
Full Planning Permission
Status
Decided
Decision
Permit
Received
14 May 2026
Validated
14 May 2026
Decided
4 Aug 2026
Ward
Bethnal Green East
Decision by
Delegated
Postcode
E1 4AH

Timeline

Dates from the published record

  1. 14 May 2026

    Received by Tower Hamlets

  2. 25 Jul 2026

    Added to PlanIndex

  3. 4 Aug 2026

    Decision issued: Permit

Who's behind it

Company information only, from the register and Companies House

CBRE Ltd Agent, registered in London

Active · incorporated 1998 · London

354 applications on PlanIndex · across 77 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Queen Mary University of London Applicant

Active

5 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

  • OFFICERS REPORT Delegated Report · 04 Aug 2026
  • DECISION_NOTICE Decision Notice · 04 Aug 2026
  • EXISTING AND PROPOSED SOFFIT AND FASCIA Current Plan · 31 Jul 2026
  • PROPOSED - NORTH EAST ELEVATIONS Current Plan · 31 Jul 2026
  • PROPOSED - SOUTH EAST & NORTH WEST ELEVATIONS Current Plan · 31 Jul 2026
  • PROPOSED - SOUTH WEST ELEVATION Current Plan · 31 Jul 2026
  • PLANNING COMMENT? DETAILS OVERHANGING SUPPORTS Correspondence · 27 Jul 2026
  • BLOCK PLAN OS Extract · 01 May 2026
  • EXISTING SOUTH WEST ELEVATION Current Plan · 01 May 2026
  • EXISTING SOUTH EAST AND NORTH WEST ELEVATIONS Current Plan · 01 May 2026
  • EXISTING NORTH EAST ELEVATIONS Current Plan · 01 May 2026
  • EXISTING AND PROPOSED ROOF PLAN Current Plan · 01 May 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Tower Hamlets granted permission on 4 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Bus Shelter, pavement outside 169 Mile End Road, London, E1

    PA/25/02053/NC Submitted 5 Dec 2025 73m away

    Display of a double sided internally illuminated LCD screen at the existing bus shelter, freestanding.

    Granted Advertising 10 docs
  • 43 Alderney Road, London, E1 4EG

    PA/26/00039/NC Submitted 8 Jan 2026 101m away

    T1 Gleditsia Tree - crown reduction by 30%, outgrown crown, property encroachment, removal of deceased wood for maintenance,

    Granted Trees 5 docs
  • 1A Argyle Road, London, E1 4EQ

    PA/25/01452/NC Submitted 3 Sep 2025 106m away

    Demolish lean-to and removal of roller shutter. Infill single storey extension, new flat roof with two rooflights. Amendments to front elevation with the installation of new windows and door.

    Granted Full applications Extension Loft or dormer +2 16 docs
    Small domestic
  • 31 Tollet Street, London, E1 4EE

    PA/26/01340/NC Submitted 3 Aug 2026 117m away

    91% historically approved · decision due ~28 Sep

    Proposed replacement of all windows and rear door

    Decided Windows or glazing
  • 35 Tollet Street, London, E1 4EE

    PA/26/01337/NC Submitted 3 Aug 2026 117m away

    91% historically approved · decision due ~28 Sep

    Replacement of existing windows with white UPVC double glazed windows, replacement of front and r...

    Decided Windows or glazing
  • 29 Tollet Street, London, E1 4EE

    PA/26/01341/NC Submitted 14 Aug 2026 117m away

    91% historically approved · decision due ~9 Oct

    Replacement of existing windows to all elevations and replacement of the existing front and rear ...

    Awaiting decision Windows or glazing

In Tower Hamlets

  • PA/26/00497/NC Decided

    72 Cambridge Heath Road, London, E1 5QJ

    The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.

    25 Mar 2026 Full applications
  • PA/26/00815/NC Granted

    22-28 Mackenzie Walk, London, E14 4PH

    Display of the Logo and pub name to existing canopies and the addition of one new canopy

    19 May 2026 Full applications
  • PA/26/00848/NC Granted

    9, 11 - 15 Baxendale Street, London, E2 7BY

    Replace existing single-glazed timber windows with slimline double-glazed timber windows.

    13 May 2026 Full applications
  • PA/26/00364/A1 Granted

    Bradwell Street Garages, Junction of Bradwell St and Moody, London, E1 4BY

    Redevelopment of the site to provide a four-storey building comprising 7 no. self-contained residential flats (Class C3), including 1 no. M4(3) unit, along with soft and hard landscaping.

    25 Mar 2026 Full applications
  • PA/25/01040/NC Granted

    Whitechapel Fire Station, 27 Commercial Road, London, E1 1LD

    Proposed development includes the replacement of flat roofs of Whitechapel Fire Station building with associated works such as raising external railings, replacement of rain water goods and external door replacements. New proposal also includes refurbishment of flat roof 1 memorial garden.

    10 Jun 2025 Full applications