Planning application
10 Cabot Square, London, E14 5AB
Works: Extension Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Part demolition of existing building structure, replacement of building façade, extension at roof...
As published by the council, reference PA/26/00133/A1
Application record
- Reference
- PA/26/00133/A1
- Status
- Decided
- Decision
- Granted As published: Permit
- Received
- 22 Jan 2026
- Validated
- 22 Jan 2026
- Ward
- Canary Wharf
- Decision by
- Delegated
- Postcode
- E14 5AB
Timeline
Dates from the published record
-
22 Jan 2026
Received by Tower Hamlets
-
25 Jul 2026
Added to PlanIndex
-
30 Oct 2026
Status changed to Decided
Previously Registered.
Documents
Plans, drawings, consultee responses and the officer's report
129 documents on file for this application
- ECOLOGY AND BIODIVERSITY ? INTERIM REVIEW REPORT
- WIND MICROCLIMATE ASSESSMENT REVIEW INTERIM REVIEW REPORT
- HISTORIC ENGLAND ADVICE
- CANAL & RIVER TRUST
- HISTORIC ENGLAND GLAAS
- TFL
- ENVIRONMENT AGENCY
- LONDON CITY AIRPORT
- CROSSRAIL
- ACTIVE TRAVEL ENGLAND
- CADENT GAS
- NATS
- EXTERNAL CONSULTATION CHECKLIST FOR LPAS
- GA PLAN L02 - DEMOLITION
- PROPOSED GA PLAN GROUND FLOOR
- EXISTING GA PLAN GROUND FLOOR
- GA PLAN GROUND FLOOR - DEMOLITION
- PROPOSED GA PLAN L01
- EXISTING GA PLAN L01
- GA PLAN L01 - DEMOLITION
- PROPOSED GA PLAN L02
- EXISTING GA PLAN L02
- PROPOSED GA ROOF PLAN
- EXISTING GA ROOF PLAN
- GA ROOF PLAN - DEMOLITION
- PROPOSED GA PLAN L03
- EXISTING GA PLAN L03
- GA PLAN L03 - DEMOLITION
- PROPOSED GA PLAN L04
- EXISTING GA PLAN L04
- GA PLAN L04 - DEMOLITION
- PROPOSED GA PLAN L05
- EXISTING GA PLAN L05
- GA PLAN L05 - DEMOLITION
- PROPOSED GA PLAN L06
- EXISTING GA PLAN L06
- GA PLAN L06 - DEMOLITION
- PROPOSED GA PLAN L07
- EXISTING GA PLAN L07
- GA PLAN L07 - DEMOLITION
- PROPOSED GA PLAN L08
- EXISTING GA PLAN L08
- GA PLAN L08 - DEMOLITION
- PROPOSED GA PLAN L09
- EXISTING GA PLAN L09
- GA PLAN L09 - DEMOLITION
- PROPOSED GA PLAN L10
- EXISTING GA PLAN L10
- GA PLAN L10 - DEMOLITION
- PROPOSED GA PLAN L11
- EXISTING GA PLAN L11
- GA PLAN L11 - DEMOLITION
- PROPOSED GA PLAN L12
- EXISTING GA PLAN L12
- GA PLAN L12 - DEMOLITION
- PROPOSED GA PLAN L13
- PROPOSED GA PLAN L14
- PROPOSED GA PLAN LOWER GROUND FLOOR
- EXISTING GA PLAN LOWER GROUND FLOOR
- GA PLAN LOWER GROUND FLOOR - DEMOLITION
- SITE LOCATION PLAN
- EXISTING SITE PLAN
- PROPOSED SITE PLAN
- PROPOSED GA ELEVATION NORTH
- PROPOSED GA ELEVATION EAST
- PROPOSED GA ELEVATION SOUTH
- PROPOSED GA ELEVATION WEST
- EXISTING GA ELEVATION NORTH
- EXISTING GA ELEVATION EAST
- EXISTING GA ELEVATION SOUTH
- EXISTING GA ELEVATION WEST
- GA ELEVATION NORTH - DEMOLITION
- GA ELEVATION EAST - DEMOLITION
- GA ELEVATION SOUTH - DEMOLITION
- GA ELEVATION WEST - DEMOLITION
- PROPOSED GA SECTION AA
- PROPOSED GA SECTION BB
- EXISTING GA SECTION AA
- EXISTING GA SECTION BB
- GA SECTION AA - DEMOLITION
- GA SECTION BB - DEMOLITION
- PROPOSED BAY STUDY - TYPICAL OFFICE FLOOR
- RETAIL FRONTAGE
- PROPOSED GA PLAN MEZZANINE
- EXISTING GA PLAN MEZZANINE
- GA PLAN MEZZANINE - DEMOLITION
- GREEN ROOF GA L14
- LANDSCAPE TERRACE GA L02
- LANDSCAPE TERRACE GA L03
- LANDSCAPE TERRACE GA L05
- LANDSCAPE TERRACE GA L08
- LANDSCAPE TERRACE GA L09
- LANDSCAPE TERRACE GA L11
- LANDSCAPE TERRACE GA L12
- AIR QUALITY ASSESSMENT
- DELIVERY AND SERVICING MANAGEMENT PLAN
- DUST MANAGEMENT PLAN
- ENERGY ASSESSMENT AND OVERHEATING MITIGATION
- FIRE STATEMENT
- SURFACE WATER DRAINAGE STRATEGY
- WIND MICROCLIMATE STUDY
- PART 1
- PART 2
- PART 3
- PART 4
- PART 5
- PART 6
- PART 7
- PART 8
- PART 9
- PART 10
- CIRCULAR ECONOMY STATEMENT - PART 2
- CIRCULAR ECONOMY STATEMENT - PART 3
- CIRCULAR ECONOMY STATEMENT - PART 4
- FOUL SEWAGE AND UTILITIES ASSESSMENT - PART 1
- FOUL SEWAGE AND UTILITIES ASSESSMENT - PART 2
- HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT - PART 1
- HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT - PART 2
- STATEMENT OF COMMUNITY INVOLVEMENT - PART 1
- STATEMENT OF COMMUNITY INVOLVEMENT - PART 2
- ECOLOGICAL APPRAISAL AND BIODIVERSITY NET GAIN STATEMENT
- HABITAT MAP
- LBTH BIODIVERSITY NET GAIN CHECKLIST
- STATUTORY BIODIVERSITY METRIC
- CONSTRUCTION ENVIRONMENTAL LOGISTICS MANAGEMENT PLAN
- COVERING LETTER DATED: 21 JAN 26
- CIRCULAR ECONOMY STATEMENT - PART 1
- SUSTAINABILITY STATEMENT
- WHOLE LIFE CARBON ASSESSMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Tower Hamlets granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Twenty Ninth Floor, 1 Canada Square, London, , E14 5AB
91% historically approved · decision due ~18 Nov
Change of use from Use Class E(g)(i) Office to Flexible Use Class F1 (Learning and Non-Residentia...
Awaiting decision -
1 Canada Square, London, E14 5AB
External alterations and associated works to introduce revolving door to north elevation, at grou...
Granted 9 docs -
Level 5, One Canada Square, Canary Wharf, London, E14 5AB
External alterations to replace eight existing windows with eight louvres at Level 5.
Granted Windows or glazing 6 docs -
Level 21, 1 Canada Square, London, E14 5AB
Replacement of two glazed units with two metal louvres and associated works.
Granted Full applications Windows or glazing 6 docs -
Twenty First Floor, 1 Canada Square, London, E14 5AB
Change of use of part of Level 21 from Use Class E(g)(i) (Office) to Flexible Use Class F1 (Learning and Non-Residential Institution) or Use Class E (g)(i) (Office)
Granted Full applications 10 docs -
Twenty First Floor, 1 Canada Square, London, E14 5AB
Submission of Details pursuant to Condition 5 (Travel Plan), of Planning Permission PA/25/01484 dated 31/10/2025
Granted Conditions 4 docs