Planning application

10 Cabot Square, London, E14 5AB

Granted Tower Hamlets PA/26/00133/A1

Works: Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Part demolition of existing building structure, replacement of building façade, extension at roof...

As published by the council, reference PA/26/00133/A1

Application record

Reference
PA/26/00133/A1
Status
Decided
Decision
Granted As published: Permit
Received
22 Jan 2026
Validated
22 Jan 2026
Ward
Canary Wharf
Decision by
Delegated
Postcode
E14 5AB

Timeline

Dates from the published record

  1. 22 Jan 2026

    Received by Tower Hamlets

  2. 25 Jul 2026

    Added to PlanIndex

  3. 30 Oct 2026

    Status changed to Decided

    Previously Registered.

Documents

Plans, drawings, consultee responses and the officer's report

129 documents on file for this application

  • ECOLOGY AND BIODIVERSITY ? INTERIM REVIEW REPORT Report · 23 Mar 2026
  • WIND MICROCLIMATE ASSESSMENT REVIEW INTERIM REVIEW REPORT Report · 23 Mar 2026
  • HISTORIC ENGLAND ADVICE Consultee Comment · 26 Feb 2026
  • CANAL & RIVER TRUST Consultee Comment · 23 Feb 2026
  • HISTORIC ENGLAND GLAAS Consultee Comment · 23 Feb 2026
  • TFL Consultee Comment · 19 Feb 2026
  • ENVIRONMENT AGENCY Consultee Comment · 19 Feb 2026
  • LONDON CITY AIRPORT Consultee Comment · 19 Feb 2026
  • CROSSRAIL Consultee Comment · 13 Feb 2026
  • ACTIVE TRAVEL ENGLAND Consultee Comment · 11 Feb 2026
  • CADENT GAS Consultee Comment · 09 Feb 2026
  • NATS Consultee Comment · 04 Feb 2026
  • EXTERNAL CONSULTATION CHECKLIST FOR LPAS Correspondence · 29 Jan 2026
  • GA PLAN L02 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN GROUND FLOOR Current Plan · 22 Jan 2026
  • EXISTING GA PLAN GROUND FLOOR Current Plan · 22 Jan 2026
  • GA PLAN GROUND FLOOR - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L01 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L01 Current Plan · 22 Jan 2026
  • GA PLAN L01 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L02 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L02 Current Plan · 22 Jan 2026
  • PROPOSED GA ROOF PLAN Current Plan · 22 Jan 2026
  • EXISTING GA ROOF PLAN Current Plan · 22 Jan 2026
  • GA ROOF PLAN - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L03 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L03 Current Plan · 22 Jan 2026
  • GA PLAN L03 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L04 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L04 Current Plan · 22 Jan 2026
  • GA PLAN L04 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L05 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L05 Current Plan · 22 Jan 2026
  • GA PLAN L05 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L06 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L06 Current Plan · 22 Jan 2026
  • GA PLAN L06 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L07 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L07 Current Plan · 22 Jan 2026
  • GA PLAN L07 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L08 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L08 Current Plan · 22 Jan 2026
  • GA PLAN L08 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L09 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L09 Current Plan · 22 Jan 2026
  • GA PLAN L09 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L10 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L10 Current Plan · 22 Jan 2026
  • GA PLAN L10 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L11 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L11 Current Plan · 22 Jan 2026
  • GA PLAN L11 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L12 Current Plan · 22 Jan 2026
  • EXISTING GA PLAN L12 Current Plan · 22 Jan 2026
  • GA PLAN L12 - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L13 Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN L14 Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN LOWER GROUND FLOOR Current Plan · 22 Jan 2026
  • EXISTING GA PLAN LOWER GROUND FLOOR Current Plan · 22 Jan 2026
  • GA PLAN LOWER GROUND FLOOR - DEMOLITION Current Plan · 22 Jan 2026
  • SITE LOCATION PLAN Current Plan · 22 Jan 2026
  • EXISTING SITE PLAN Current Plan · 22 Jan 2026
  • PROPOSED SITE PLAN Current Plan · 22 Jan 2026
  • PROPOSED GA ELEVATION NORTH Current Plan · 22 Jan 2026
  • PROPOSED GA ELEVATION EAST Current Plan · 22 Jan 2026
  • PROPOSED GA ELEVATION SOUTH Current Plan · 22 Jan 2026
  • PROPOSED GA ELEVATION WEST Current Plan · 22 Jan 2026
  • EXISTING GA ELEVATION NORTH Current Plan · 22 Jan 2026
  • EXISTING GA ELEVATION EAST Current Plan · 22 Jan 2026
  • EXISTING GA ELEVATION SOUTH Current Plan · 22 Jan 2026
  • EXISTING GA ELEVATION WEST Current Plan · 22 Jan 2026
  • GA ELEVATION NORTH - DEMOLITION Current Plan · 22 Jan 2026
  • GA ELEVATION EAST - DEMOLITION Current Plan · 22 Jan 2026
  • GA ELEVATION SOUTH - DEMOLITION Current Plan · 22 Jan 2026
  • GA ELEVATION WEST - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED GA SECTION AA Current Plan · 22 Jan 2026
  • PROPOSED GA SECTION BB Current Plan · 22 Jan 2026
  • EXISTING GA SECTION AA Current Plan · 22 Jan 2026
  • EXISTING GA SECTION BB Current Plan · 22 Jan 2026
  • GA SECTION AA - DEMOLITION Current Plan · 22 Jan 2026
  • GA SECTION BB - DEMOLITION Current Plan · 22 Jan 2026
  • PROPOSED BAY STUDY - TYPICAL OFFICE FLOOR Current Plan · 22 Jan 2026
  • RETAIL FRONTAGE Current Plan · 22 Jan 2026
  • PROPOSED GA PLAN MEZZANINE Current Plan · 22 Jan 2026
  • EXISTING GA PLAN MEZZANINE Current Plan · 22 Jan 2026
  • GA PLAN MEZZANINE - DEMOLITION Current Plan · 22 Jan 2026
  • GREEN ROOF GA L14 Current Plan · 22 Jan 2026
  • LANDSCAPE TERRACE GA L02 Current Plan · 22 Jan 2026
  • LANDSCAPE TERRACE GA L03 Current Plan · 22 Jan 2026
  • LANDSCAPE TERRACE GA L05 Current Plan · 22 Jan 2026
  • LANDSCAPE TERRACE GA L08 Current Plan · 22 Jan 2026
  • LANDSCAPE TERRACE GA L09 Current Plan · 22 Jan 2026
  • LANDSCAPE TERRACE GA L11 Current Plan · 22 Jan 2026
  • LANDSCAPE TERRACE GA L12 Current Plan · 22 Jan 2026
  • AIR QUALITY ASSESSMENT Report · 22 Jan 2026
  • DELIVERY AND SERVICING MANAGEMENT PLAN Report · 22 Jan 2026
  • DUST MANAGEMENT PLAN Report · 22 Jan 2026
  • ENERGY ASSESSMENT AND OVERHEATING MITIGATION Report · 22 Jan 2026
  • FIRE STATEMENT Report · 22 Jan 2026
  • SURFACE WATER DRAINAGE STRATEGY Report · 22 Jan 2026
  • WIND MICROCLIMATE STUDY Report · 22 Jan 2026
  • PART 1 Design & Access Statement · 22 Jan 2026
  • PART 2 Design & Access Statement · 22 Jan 2026
  • PART 3 Design & Access Statement · 22 Jan 2026
  • PART 4 Design & Access Statement · 22 Jan 2026
  • PART 5 Design & Access Statement · 22 Jan 2026
  • PART 6 Design & Access Statement · 22 Jan 2026
  • PART 7 Design & Access Statement · 22 Jan 2026
  • PART 8 Design & Access Statement · 22 Jan 2026
  • PART 9 Design & Access Statement · 22 Jan 2026
  • PART 10 Design & Access Statement · 22 Jan 2026
  • CIRCULAR ECONOMY STATEMENT - PART 2 Report · 22 Jan 2026
  • CIRCULAR ECONOMY STATEMENT - PART 3 Report · 22 Jan 2026
  • CIRCULAR ECONOMY STATEMENT - PART 4 Report · 22 Jan 2026
  • FOUL SEWAGE AND UTILITIES ASSESSMENT - PART 1 Report · 22 Jan 2026
  • FOUL SEWAGE AND UTILITIES ASSESSMENT - PART 2 Report · 22 Jan 2026
  • HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT - PART 1 Report · 22 Jan 2026
  • HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT - PART 2 Report · 22 Jan 2026
  • STATEMENT OF COMMUNITY INVOLVEMENT - PART 1 Report · 22 Jan 2026
  • STATEMENT OF COMMUNITY INVOLVEMENT - PART 2 Report · 22 Jan 2026
  • ECOLOGICAL APPRAISAL AND BIODIVERSITY NET GAIN STATEMENT Report · 22 Jan 2026
  • HABITAT MAP Current Plan · 22 Jan 2026
  • LBTH BIODIVERSITY NET GAIN CHECKLIST Correspondence · 22 Jan 2026
  • STATUTORY BIODIVERSITY METRIC Correspondence · 22 Jan 2026
  • CONSTRUCTION ENVIRONMENTAL LOGISTICS MANAGEMENT PLAN Report · 22 Jan 2026
  • COVERING LETTER DATED: 21 JAN 26 Correspondence · 22 Jan 2026
  • CIRCULAR ECONOMY STATEMENT - PART 1 Report · 22 Jan 2026
  • SUSTAINABILITY STATEMENT Report · 22 Jan 2026
  • WHOLE LIFE CARBON ASSESSMENT Report · 22 Jan 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Tower Hamlets granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Twenty Ninth Floor, 1 Canada Square, London, , E14 5AB

    PA/26/01638/NC Submitted 23 Sep 2026 50 yards away

    91% historically approved · decision due ~18 Nov

    Change of use from Use Class E(g)(i) Office to Flexible Use Class F1 (Learning and Non-Residentia...

    Awaiting decision
  • 1 Canada Square, London, E14 5AB

    PA/26/01532/NC Submitted 2 Sep 2026 50 yards away

    External alterations and associated works to introduce revolving door to north elevation, at grou...

    Granted 9 docs
  • Level 5, One Canada Square, Canary Wharf, London, E14 5AB

    PA/26/01530/NC Submitted 2 Sep 2026 50 yards away

    External alterations to replace eight existing windows with eight louvres at Level 5.

    Granted Windows or glazing 6 docs
  • Level 21, 1 Canada Square, London, E14 5AB

    PA/26/00175/NC Submitted 30 Jan 2026 50 yards away

    Replacement of two glazed units with two metal louvres and associated works.

    Granted Full applications Windows or glazing 6 docs
  • Twenty First Floor, 1 Canada Square, London, E14 5AB

    PA/25/01484/NC Submitted 22 Aug 2025 50 yards away

    Change of use of part of Level 21 from Use Class E(g)(i) (Office) to Flexible Use Class F1 (Learning and Non-Residential Institution) or Use Class E (g)(i) (Office)

    Granted Full applications 10 docs
  • Twenty First Floor, 1 Canada Square, London, E14 5AB

    PA/26/00015/S Submitted 5 Jan 2026 50 yards away

    Submission of Details pursuant to Condition 5 (Travel Plan), of Planning Permission PA/25/01484 dated 31/10/2025

    Granted Conditions 4 docs