Planning application
Imperial Phase 3 (formerly Imperial 1, Plot A), Land at Imperial Street, Bromley by Bow, London, E3 3ED
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application for Non-Material amendment to planning permission ref: LL/19/00554, Dated 21/01/2022. Non Material amendments sought: - Minor changes to roof terrace screening and some balcony designs - Amendment to the wording of condition 15 (Sustainability Statement)
As published by the council, reference PA/25/02074/S
Application record
- Reference
- PA/25/02074/S
- Type
- Non-material amendment (TCPA S96a)
- Status
- Decided
- Decision
- Granted As published: Permit
- Received
- 1 Dec 2025
- Validated
- 1 Dec 2025
- Decided
- 23 Dec 2025
- Ward
- Bromley North
- Decision by
- Delegated
- Postcode
- E3 3ED
Site history
Applications at this address on the Tower Hamlets register
This site has had 6 applications since 2025: 3 approved, 0 refused.
-
PA/26/01576/S Granted
Imperial Phase 3 (formerly Imperial 1, Plot A), Land at Imperial Street, Bromley by Bow, London, E3 3ED
Submission of details pursuant to condition no.32 (Secured by Design) of planning permission ref:...
-
PA/26/01577/S Awaiting decision
Imperial Phase 3 (formerly Imperial 1, Plot A), Land at Imperial Street, Bromley by Bow, London, E3 3ED
Submission of details pursuant to condition no.7 (Construction Management Plan) of planning permi...
-
PA/26/00671/S Awaiting decision
Imperial Phase 3 (formerly Imperial 1, Plot A), Land at Imperial Street, Bromley by Bow, London, E3 3ED
Application for Non-Material amendment to planning permission ref: LL/19/00554, Dated 21/01/2022. Non Material amendments sought: Switch in tenure of 135 private units to 135 social rented units and amendments to the mix of shared ownership units Amendments of Wheelchair units to meet M4(3)(2)(b) (Wheelchair Adaptable) standards as a result of tenure switch Change to Shared-ownership affordability caps to meet GLA Policy Removal of Condition 16
-
PA/26/00065/S Granted
Imperial Phase 3 (formerly Imperial 1, Plot A), Land at Imperial Street, Bromley by Bow, London, E3 3ED
Submission of details pursuant to condition no.33 (Service and Delivery Plan) of planning permission ref: LL/19/00554/FUL, dated 20/01/2022
-
PA/25/00415/S Awaiting decision
Imperial Phase 3 (formerly Imperial 1, Plot A), Land at Imperial Street, Bromley by Bow, London, E3 3ED
Submission of details pursuant to conditions 42 (Electric Vehicle Charging Provision) and Condition 46 (Hours of Operation) for Leaside Lock Phase 3 (Main Construction Phase: Blocks 1-3 incl. Townhouses and Courtyard/Landscaping Scheme), of planning permission LLDC Ref: 19/00554/FUL (LBTH Ref: LL/19/00554/FUL), dated 20/01/2022
Timeline
Dates from the published record
-
1 Dec 2025
Received by Tower Hamlets
-
23 Dec 2025
Decision issued: Permit
-
25 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: PA/25/00083/S (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
37 documents on file for this application
- OFFICERS REPORT
- DECISION_NOTICE
- SUSTAINABILITY STATEMENT
- BALUSTRADE ELEVATIONS BLOCK 03 ROOF
- COVER LETTER - 24 NOV 2025
- GA PLAN BLOCK 01 - LEVEL 01
- GA PLAN BLOCK 01 - LEVEL 02
- GA PLAN BLOCK 01 - LEVEL 03
- GA PLAN BLOCK 01 - LEVEL 04
- GA PLAN BLOCK 01 - LEVEL 05
- GA PLAN BLOCK 01 - LEVEL 06
- GA PLAN BLOCK 01 - LEVEL 07
- GA PLAN BLOCK 01 - LEVEL 08
- GA PLAN BLOCK 01 - LEVEL 09
- GA PLAN BLOCK 01 - LEVEL 10
- GA PLAN BLOCK 01 - LEVEL 11
- GA PLAN BLOCK 01 - LEVEL 12
- GA PLAN BLOCK 01 - LEVEL 13
- GA ELEVATION BLOCK 01 - WEST 01
- GA PLAN BLOCK 02 - LEVEL 01
- GA PLAN BLOCK 02 - LEVEL 02
- GA PLAN BLOCK 02 - LEVEL 03
- GA PLAN BLOCK 02 - LEVEL 04
- GA PLAN BLOCK 02 - LEVEL 05
- GA PLAN BLOCK 02 - LEVEL 06
- GA PLAN BLOCK 02 - LEVEL 07
- GA PLAN BLOCK 02 - LEVEL 08
- GA ELEVATION BLOCK 02 - EAST 01
- GA ELEVATION BLOCK 02 - EAST 02
- GA ELEVATION BLOCK 02 - WEST 02
- GA ELEVATION BLOCK 03 - NORTH 01
- GA ELEVATION BLOCK 03 - NORTH 02
- GA ELEVATION BLOCK 03 - NORTH 03
- GA ELEVATION BLOCK 03 - EAST
- GA ELEVATION BLOCK 03 - SOUTH
- GA ELEVATION BLOCK 03 - WEST 01
- GA ELEVATION BLOCK 03 - WEST 02
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Tower Hamlets granted permission on 23 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Imperial Phase 3 (formerly Imperial 1, Plot A), Land at Imperial Street, Bromley by Bow, London, E3 3ED
92% historically approved · decision due ~9 Jun
Application for Non-Material amendment to planning permission ref: LL/19/00554, Dated 21/01/2022. Non Material amendments sought: Switch in tenure of 135 private units to 135 social rented units and amendments to the mix of shared ownership units Amendments of Wheelchair units to meet M4(3)(2)(b) (Wheelchair Adaptable) standards as a result of tenure switch Change to Shared-ownership affordability caps to meet GLA Policy Removal of Condition 16
Awaiting decision Amendments 4 docs -
Imperial Phase 3 (formerly Imperial 1, Plot A), Land at Imperial Street, Bromley by Bow, London, E3 3ED
Submission of details pursuant to condition no.33 (Service and Delivery Plan) of planning permission ref: LL/19/00554/FUL, dated 20/01/2022
Granted Conditions 7 docs -
Leaside Lock Phase 3 (Formerly: Land at Imperial Street and 'Imperial Phase 3'), Land at Imperial Street, Bromley by Bow, E3 3ED
Submission of detail pursuant to condition no 18 part P (Elevational locations of all items) part Q(Details of Key architectural metal work/screens/gates) 23. ( Lighting Schemes), 24 (Wayfinding/Signage) , 29 (Long Stay Residential Cycle Parking Provision) no.31 (Waste and Recycling Storage) and no.44(Imperial Street Vehicle Access) of LLDC planning permission ref:19/00554/FUL Dated 20/01/2022
Granted Conditions 84 docs -
Imperial Phase 3 (formerly Imperial 1, Plot A), Land at Imperial Street, Bromley by Bow, London, E3 3ED
97% historically approved · decision due ~30 Apr
Submission of details pursuant to conditions 42 (Electric Vehicle Charging Provision) and Condition 46 (Hours of Operation) for Leaside Lock Phase 3 (Main Construction Phase: Blocks 1-3 incl. Townhouses and Courtyard/Landscaping Scheme), of planning permission LLDC Ref: 19/00554/FUL (LBTH Ref: LL/19/00554/FUL), dated 20/01/2022
Awaiting decision Conditions 3 docs -
Leaside Lock Phase 3 (Formerly: Land at Imperial Street and 'Imperial Phase 3'), Land at Imperial Street, Bromley by Bow London E3 3ED
97% historically approved · decision due ~17 Jan
Submission of Details Pursuant to Condition No.27 (Ecology) of LLDC Planning Permission Ref: 19/00554/FUL, Dated 20/01/2022
Awaiting decision Conditions 20 docs -
Leaside Lock Phase 3 (Formerly: Land at Imperial Street and Imperial Phase 3), Land at Imperial Street, Bromley by Bow, E3 3ED
Proposed temporary change of use of the Block 1 commercial unit from Flexible Class E use to a Ma...
Granted
Other amendment applications
In Tower Hamlets
-
PA/26/01362 Refused
Cuba Street Site, Land At North East Junction Of Manilla Street And Tobago Street, Tobago Street, London E14
Application for non-material amendment of planning permission dated 29/05/2025, ref: PA/24/00733. Non Material Amendment(s) Sought: Amendment to the wording of Condition 3(b)(Construction Hours) and Condition 11(Construction Environmental Management & Logistics Plan)
-
PA/26/01245/NC Awaiting decision
21 Bow Triangle Business Centre, 21 Eleanor Street, London, E3 4UR
Certificate of lawfulness in respect of the existing use of the railway arch at Unit 21, Bow Triangle Business Centre, as a delivery-only commercial kitchen.
-
PA/26/01428/S Awaiting decision
Former Poplar Bus Depot, Leven Road, London, E14 0LN
Application for Non-Material amendment to planning permission ref: PA/19/02148, Dated 20/10/2020. Non Material amendment(s) Sought Proposed changes on product specification/supplier due to procurement reason following appointment of landscape contractor.
-
PA/26/01435/A1 Awaiting decision
56 - 58 Marsh Wall, London E14 9TP
Demolition of existing buildings and construction of building up to 46 storeys (151.905 m AOD) comprising up to 795 co-living units in sui generis use together with communal facilities, non-residential floor space (class E use) and public realm improvements including landscaping, access and highways works; together with other associated works in respect of the development. This application is accompanied by an Environmental Statement. Minor Material Amendments to Planning Permission PA/22/00591 Dated 28/07/2023 Amendment include:- Variation of Condition 2 of planning permission PA/22/00591 (as amended) to include design amendments to the southern elevation and reduce the approved affordable housing payment in lieu to £15,000,000.00 .' (the 'S73 Application')
-
PA/26/01295/S Granted
Mulberry Place Town Hall, 5 Clove Crescent, And Lighterman House, 3 Clove Crescent, London, E14 2BG (Republic Masterplan Site)
Application for Non-Material amendment to planning permission ref: PA/21/02182, Dated 01/12/2023. Non Material amendment(s) Sought: Amendment to the wording of Condition 2 to allow any Reserved Matters applications to be made within 3 years for the first outline plot .