Planning application
King Edward Memorial Park Foreshore, Glamis Road, Shadwell E1W 3EQ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 - Non-Material Amendment to Schedule 3 Requirements KEMPF3 (Detailed design approval for permanent above-ground structures) and KEMPF6 (Landscaping works) as approved by application PA/21/01190/NC and revised in PA/25/00752/NC.
As published by the council, reference PA/25/01836/NC
Application record
- Reference
- PA/25/01836/NC
- Type
- Thames Tideway Tunnel DOR
- Status
- Decided
- Decision
- Permit
- Received
- 15 Oct 2025
- Validated
- 15 Oct 2025
- Decided
- 27 Oct 2025
- Ward
- St Katharines and Wapping
- Decision by
- Delegated
- Postcode
- E1W 3EQ
Timeline
Dates from the published record
-
15 Oct 2025
Received by Tower Hamlets
-
27 Oct 2025
Decision issued: Permit
-
25 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Tower Hamlets granted permission on 27 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Tower Hamlets's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
King Edward Memorial Park, Glamis Road, London, E1W 3TD
85% historically approved · decision due ~26 Mar
Refurbishment of King Edward Memorial Park to provide upgraded sports facilities, improved play areas, enhanced landscaping, accessibility improvements. Refurbishment and extension of the former Bowls Pavilion Building to create a community hub with café kiosk, changing rooms, toilets and associated amenities.
Awaiting decision Full applications Extension 65 docs -
King Edward Memorial Park, Glamis Road, London, E1
The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 - Discharge Schedule 3 Requirement KEMPF9 (Contaminated Land): Submission of site-specific land remediation verification report.
Granted 93 docs -
King Edward Memorial Park, Glamis Road, London, E1W 3TD
Application for Certificate of Lawfulness in respect of proposed cleaning, repair and improvement works of the park's existing features, furniture and hard and soft landscaping, including the reinstatement of the commemoration plaque.
Granted Outline 8 docs -
11 Peartree Lane, London, E1W 3SR
Listed Building Consent for the following proposed Works: Bathroom 1: Replace failed electric sho...
Granted 8 docs -
Reception Area, Free Trade Wharf, 340 The Highway, London, E1W 3ES
Proposed installation of a new sliding entrance door, internal remodelling the existing reception space within the Ziggurat building to improve functionality for reception staff working in the area and to accommodate storage of resident deliveries.
Granted Full applications 11 docs -
Gordon House, Glamis Road, London E1W 3ED
91% historically approved · decision due ~20 Oct
Submission of Details pursuant to Condition 3 (Car Free), of Planning Permission PA/20/02315 date...
Awaiting decision 5 docs