Skip to content
PlanIndex Get alerts
Menu

Planning application

Boat Yard, 82-84 Wapping High Street and Wapping Police Station, 98-102 Wapping High Street, London, E1W 2NE

Granted Tower Hamlets PA/25/01701/NC Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Repairs to river wall.

As published by the council, reference PA/25/01701/NC

Application record

Reference
PA/25/01701/NC
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Permit
Received
7 Oct 2025
Validated
7 Oct 2025
Decided
2 Dec 2025
Ward
St Katharines and Wapping
Decision by
Delegated
Postcode
E1W 2NE

Site history

Applications at this address on the Tower Hamlets register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • PA/25/01702/NC Granted

    Boat Yard, 82-84 Wapping High Street and Wapping Police Station, 98-102 Wapping High Street, London, E1W 2NE

    Repairs to river wall.

    Decided 2 Dec 2025 Heritage and listed buildings

Timeline

Dates from the published record

  1. 7 Oct 2025

    Received by Tower Hamlets

  2. 2 Dec 2025

    Decision issued: Permit

  3. 25 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: PA/25/01702/NC (Decided)

Who's behind it

Company information only, from the register and Companies House

Knight Frank LLP Agent, registered in London

Active · incorporated 2003 · London

161 applications on PlanIndex · across 45 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

  • OFFICERS REPORT Delegated Report · 02 Dec 2025
  • DECISION_NOTICE Decision Notice · 02 Dec 2025
  • PORT OF LONDON AUTHORITY Consultee Comment · 06 Nov 2025
  • ENVIRONMENT AGENCY Consultee Comment · 06 Nov 2025
  • CANAL & RIVER TRUST Consultee Comment · 17 Oct 2025
  • BNG BASELINE REPORT Report · 29 Sep 2025
  • MATERIALS REGISTER Correspondence · 29 Sep 2025
  • HELIFIX HELIBAR - PRODUCT SHEET Correspondence · 29 Sep 2025
  • HIT-HY INJECTION MORTAR - TECHNICAL DATASHEET Correspondence · 29 Sep 2025
  • BOATYARD RIVER WALL - RETURN WALL EXISTING AND PROPOSED ELEVATIONS Current Plan · 29 Sep 2025
  • LOCATION PLAN Current Plan · 29 Sep 2025
  • MARINE MORTAR S CLASS R4 STRUCTURAL REPAIR MORTAR - PRODUCT DATASHEET Correspondence · 29 Sep 2025
  • GREENHEART TIMBER Correspondence · 29 Sep 2025
  • SIGMADUR 550 - PRODUCT DATASHEET Correspondence · 29 Sep 2025
  • EXISTING AND PROPOSED SITE PLAN Current Plan · 29 Sep 2025
  • UKHAB PLAN Current Plan · 29 Sep 2025
  • 1 CLASS A BLUE BLACK SOLID ENGINEERING BRICK Correspondence · 29 Sep 2025
  • HELIFIX HELIBOND - PRODUCT DATASHEET Correspondence · 29 Sep 2025
  • FOSROC LOKFIX E55S SPEC Correspondence · 29 Sep 2025
  • EXISTING AND PROPOSED SITE PLAN Current Plan · 29 Sep 2025
  • AND HERITAGE STATEMENT Design & Access Statement · 29 Sep 2025
  • RENDEROC HB45 Correspondence · 29 Sep 2025
  • FOSROC NITOFILL LVTH Correspondence · 29 Sep 2025
  • SIGMASHIELD 880 - AMERLOCK SPEC Correspondence · 29 Sep 2025
  • EXISTING AND PROPOSED ELEVATIONS WAPPING POLICE STATION Current Plan · 29 Sep 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Tower Hamlets granted permission on 2 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Tower Hamlets

  • PA/26/00916/NC Granted

    2 Athelstane Grove, London, E3 5JG

    Conversion of existing butterfly roof with front and back mansard to utilise the loft area as habitable space.

    Received 3 Jun, published by the council 25 Jul 2026 Full applications
  • PA/26/01372/NC Awaiting decision

    Anglesey House, Lindfield Street, London E14 6HS

    Proposal for the installation of a new flat roof covering, including the removal of the existing curved metal profile roof and supporting framework, demolition of the existing gable walls, installation of a warm deck flat roof over the original concrete roof slab, and provision of an edge protection system to facilitate safe roof access for maintenance.

    Received 8 Sep, published by the council 9 Sep 2026 Full applications
  • PA/26/01504/NC Awaiting decision

    412 Hackney Road, London, E2 7AP

    Proposed for a new side extension, alterations to the existing side extension, installation of a new glazed screen and rooflight, and alterations to the street-facing façade.

    Received 4 Sep, published by the council 11 Oct 2026 Full applications
  • PA/26/01517/NC Awaiting decision

    11 Lyal Road, London, E3 5QG

    Proposed single-storey rear infill side extension

    Received 4 Sep, published by the council 8 Sep 2026 Full applications
  • PA/26/00497/NC Decided

    72 Cambridge Heath Road, London, E1 5QJ

    The change of use of the ground floor premises at 72 Cambridge Heath Road, London E1 5QJ from Use Class E (Commercial, Business and Service) to Sui Generis (Laundrette) including external flue.

    Received 25 Mar, published by the council 25 Jul 2026 Full applications