Skip to content
PlanIndex Get alerts
Menu

Planning application

Wickside, 3 to 13 Hepscott Road, Hackney Wick, London, E9 5HB

Granted Tower Hamlets PA/24/02048/S Variation / Removal Condition (TCPA S73)

Works: Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application for the variation of condition 2 (Approved Drawings) of planning permission ref: 16/00451/OUT dated 21st January 2020 (original description altered by S96A application Ref. PA/24/02049) which gave consent for the following: 'Hybrid planning application for comprehensive mixed-use redevelopment of 2.88ha site comprising: Retained/part-retained/refurbished buildings, demolition of all remaining operational buildings, structures and plant, including sections of perimeter wall/steel fence. New open space, canal-side urban park integrated into towpath and internal pedestrian and vehicular access routes Up to 39 new/refurbished buildings/blocks to provide for a mix of residential (Use Class C3) and a range of commercial and non-residential uses Parking for private car/motorcycle, plus resident and visitor cycle parking. Detailed Element Application for full planning permission for Phase 1, 2, 3A and 4 on 2.63ha comprising: 5 No. retained (or part -retained) and refurbished buildings G1-G5 Demolition of all remaining buildings and boundary structures; New/retained buildings comprising a mix of residential (Use Class C3) and a range of commercial and non-residential floorspace New site access for pedestrians/vehicles, new internal access routes/streets/circulation; associated surface and underground parking for cars/cycles Commercial vehicle service bays New open spaces, including private and communal amenity, public realm and associated landscaping Associated site works. Outline Element Application for outline planning permission (with all matters reserved except access) for up to 3 co-joined blocks on 0.25ha to comprise: Demolition of all existing buildings and removal of structures to provide Residential (Use Class C3) and a range of commercial and non-residential floorspace Creation of northern bridge approach/abutment for new Canal Crossing Provision of new site access points Provision of new open spaces, including private and communal amenity, public realm and associated landscaping Associated site works. PROPOSED AMENDMENTS - Change the use of the consented Block W19 from a micro-brewery (Use Class B1c/B2) to a hotel (Use Class C1) - Amendments to the internal layout and elevations of the consented Block W19.

As published by the council, reference PA/24/02048/S

Application record

Reference
PA/24/02048/S
Type
Variation / Removal Condition (TCPA S73)
Status
Decided
Decision
Granted As published: Permit
Received
1 Dec 2024
Validated
1 Dec 2024
Ward
Bow East
Decision by
Delegated
Postcode
E9 5HB

Site history

Applications at this address on the Tower Hamlets register

This site has had 3 applications since 2024: 2 approved, 0 refused.

  • PA/26/01684/NC Granted

    Wickside, 3 to 13 Hepscott Road, Hackney Wick, London, E9 5HB

    Application for Non-Material amendment to planning permission ref: PA/24/02048, Dated 06/07/2026....

    Submitted 2 Oct 2026
  • PA/26/01168/S Decided

    Wickside, 3 to 13 Hepscott Road, Hackney Wick, London, E9 5HB

    Application for Non-Material amendment to planning permission ref: PA/24/02048, Dated 06/07/2026....

    Submitted 4 Aug 2026

Timeline

Dates from the published record

  1. 1 Dec 2024

    Received by Tower Hamlets

  2. 29 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: LL/16/00451/OUT (Decided)

Who's behind it

Company information only, from the register and Companies House

Avison Young Limited Agent

1,577 applications on PlanIndex · across 182 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

GHL (Wickside) Limited Applicant, registered in Loughton

Active · incorporated 2013 · Loughton

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

153 documents on file for this application

  • OFFICERS REPORT Delegated Report · 04 Aug 2026
  • DECISION_NOTICE Decision Notice · 04 Aug 2026
  • DEED OF VARIATION S106 Agreement · 24 Jul 2026
  • DATED: 16 JULY 2026 S106 Agreement · 24 Jul 2026
  • SUMMARY Correspondence · 24 Jul 2026
  • 16 JULY 2026 S106 Agreement · 23 Jul 2026
  • ELTHERINGTON ALUMINIUM CASETTE DATASHEET Correspondence · 16 Jun 2026
  • EQUITONE NATURA DATASHEET Correspondence · 16 Jun 2026
  • IBSTOCK PRODUCT INFORMATION SHEET Correspondence · 16 Jun 2026
  • CGI BROWN ALUMINUM METAL ACCENTS Photo · 16 Jun 2026
  • THAMES WATER Consultee Comment · 18 May 2026
  • HSE - BSR Consultee Comment · 13 May 2026
  • CANAL & RIVER TRUST Consultee Comment · 06 May 2026
  • PORT OF LONDON AUTHORITY Consultee Comment · 05 May 2026
  • ACTIVE TRAVEL ENGLAND Consultee Comment · 01 May 2026
  • LONDON CITY AIRPORT Consultee Comment · 28 Apr 2026
  • ENVIRONMENT AGENCY Consultee Comment · 28 Apr 2026
  • HISTORIC ENGLAND GLAAS LETTER Consultee Comment · 24 Apr 2026
  • CROSSRAIL Consultee Comment · 24 Apr 2026
  • SPORT ENGLAND Consultee Comment · 23 Apr 2026
  • LONDON UNDERGROUND Consultee Comment · 23 Apr 2026
  • EA CHECKLIST FOR LPA Other · 20 Apr 2026
  • TFL Consultee Comment · 26 Mar 2026
  • GLA LETTER DATED: 18 MAR 2026 Correspondence · 23 Mar 2026
  • FINAL REVIEW REPORT 001 Environmental Statement · 23 Mar 2026
  • RESPONSE TO RAMBOLL ES REVIEW Correspondence · 26 Feb 2026
  • VOLUME I - 2 EIA METHODOLOGY Environmental Statement · 23 Dec 2025
  • VOLUME I - 3 ALTERNATIVES AND DESIGN EVOLUTION Environmental Statement · 23 Dec 2025
  • VOLUME I - 4 THE PROPOSED DEVELOPMENT - PART 1 Environmental Statement · 23 Dec 2025
  • VOLUME I - 4 THE PROPOSED DEVELOPMENT - PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME I - 4 THE PROPOSED DEVELOPMENT - PART 2 Environmental Statement · 23 Dec 2025
  • VOLUME I - 5 DEMOLITION AND CONSTRUCTION Environmental Statement · 23 Dec 2025
  • VOLUME I - 6 WASTE AND RECYCLING Environmental Statement · 23 Dec 2025
  • VOLUME I - 7 SOCIO-ECONOMICS Environmental Statement · 23 Dec 2025
  • VOLUME I - 8 TRAFFIC AND TRANSPORT Environmental Statement · 23 Dec 2025
  • VOLUME I - 9 AIR QUALITY AND ODOUR Environmental Statement · 23 Dec 2025
  • VOLUME I - 10 NOISE AND VIBRATION Environmental Statement · 23 Dec 2025
  • VOLUME I - 11 WIND AND MICROCLIMATE Environmental Statement · 23 Dec 2025
  • VOLUME I - 12 DAYLIGHT, SUNLIGHT AND OVERSHADOWING Environmental Statement · 23 Dec 2025
  • VOLUME I - 13 WATER RESOURCES, DRAINAGE AND FLOOD RISK Environmental Statement · 23 Dec 2025
  • VOLUME I - 14 GROUND CONDITIONS Environmental Statement · 23 Dec 2025
  • VOLUME I - 15 ECOLOGY Environmental Statement · 23 Dec 2025
  • VOLUME I - 16 ARCHAEOLOGY Environmental Statement · 23 Dec 2025
  • VOLUME I - 17 EFFECT INTERACTIONS Environmental Statement · 23 Dec 2025
  • VOLUME I - 18 RESIDUAL EFFECTS AND CONCLUSIONS Environmental Statement · 23 Dec 2025
  • IMPACT APPRAISAL AND JUSTIFICATION STATEMENT - PART 1 Heritage Statement · 23 Dec 2025
  • IMPACT APPRAISAL AND JUSTIFICATION STATEMENT - PART 2 Heritage Statement · 23 Dec 2025
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 1 Report · 23 Dec 2025
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 2 Report · 23 Dec 2025
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 3 Report · 23 Dec 2025
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 4 Report · 23 Dec 2025
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 5 Report · 23 Dec 2025
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT - PART 6 Report · 23 Dec 2025
  • VOLUME III - CONTENTS Environmental Statement · 23 Dec 2025
  • VOLUME III - FRONT COVER Environmental Statement · 23 Dec 2025
  • ACUTE AND SUB-CHRONIC VAPOUR RISK ASSESSMENT Report · 17 Dec 2025
  • DETAILED QUANTITATIVE RISK ASSESSMENT FOR CONTROLLED WATERS - PART 1 Report · 17 Dec 2025
  • DETAILED QUANTITATIVE RISK ASSESSMENT FOR CONTROLLED WATERS - PART 2 Report · 17 Dec 2025
  • DETAILED QUANTITATIVE RISK ASSESSMENT FOR CONTROLLED WATERS - PART 3 Report · 17 Dec 2025
  • DETAILED QUANTITATIVE RISK ASSESSMENT FOR CONTROLLED WATERS - PART 4 Report · 17 Dec 2025
  • DETAILED QUANTITATIVE RISK ASSESSMENT FOR CONTROLLED WATERS - PART 5 Report · 17 Dec 2025
  • DETAILED QUANTITATIVE RISK ASSESSMENT FOR CONTROLLED WATERS - PART 6 Report · 17 Dec 2025
  • INTERIM VERIFICATION REPORT ? VOLUME 1 Report · 17 Dec 2025
  • INTERIM VERIFICATION REPORT ? VOLUME 2 - PART 1 Report · 17 Dec 2025
  • INTERIM VERIFICATION REPORT ? VOLUME 2 - PART 2 Report · 17 Dec 2025
  • INTERIM VERIFICATION REPORT ? VOLUME 2 - PART 3 Report · 17 Dec 2025
  • INTERIM VERIFICATION REPORT ? VOLUME 2 - PART 4 Report · 17 Dec 2025
  • REMEDIATION STRATEGY - PART 1 Report · 17 Dec 2025
  • REMEDIATION STRATEGY - PART 2 Report · 17 Dec 2025
  • SITE INVESTIGATION INTERPRETIVE REPORT - PART 1 Report · 17 Dec 2025
  • SITE INVESTIGATION INTERPRETIVE REPORT - PART 2 Report · 17 Dec 2025
  • SITE INVESTIGATION INTERPRETIVE REPORT - PART 3 Report · 17 Dec 2025
  • SITE INVESTIGATION INTERPRETIVE REPORT - PART 4 Report · 17 Dec 2025
  • SITE INVESTIGATION INTERPRETIVE REPORT - PART 5 Report · 17 Dec 2025
  • BLACK REDSTART SURVEY Report · 17 Dec 2025
  • BREEAM ECOLOGY PRE- ASSESSMENT Report · 17 Dec 2025
  • GN13: RELATING ECOLOGIST?S REPORT AND BREEAM Report · 17 Dec 2025
  • LANDSCAPE AND ECOLOGY MANAGEMENT PLAN Report · 17 Dec 2025
  • ECOLOGICAL MANAGEMENT PLAN Report · 17 Dec 2025
  • PLOT G - DISCHARGE OF CONDITIONS 27 (ECOLOGY SURVEY AND MITIGATION) AND 36 (BIODIVERSE ROOFS) Report · 17 Dec 2025
  • LANDSCAPE MASTERPLAN - GROUND FLOOR Current Plan · 17 Dec 2025
  • CONDITION 54 DISCHARGE Correspondence · 17 Dec 2025
  • NOISE IMPACT ASSESSMENT Report · 17 Dec 2025
  • LL/23/00336/AOD DECISION Correspondence · 17 Dec 2025
  • EXTERNAL DAYLIGHT AND SUNLIGHT REPORT Daylight & Sunlight · 17 Dec 2025
  • REG 25 RESPONSE REPORT Report · 15 Dec 2025
  • REVISED NON-TECHNICAL SUMMARY Environmental Statement · 15 Dec 2025
  • DESK BASED GEOARCHAEOLOGICAL DEPOSIT MODEL Report · 15 Dec 2025
  • GEOARCHAEOLOGICAL & PALAEOENVIRONMENTAL WRITTEN SCHEME OF INVESTIGATION Report · 15 Dec 2025
  • ARCHAEOLOGICAL WORKS WRITTEN SCHEME OF INVESTIGATION Report · 15 Dec 2025
  • GEOARCHAEOLOGICAL & PALAEOENVIRONMENTAL FIELDWORK AND DEPOSIT MODEL REPORT Report · 15 Dec 2025
  • ARCHAEOLOGICAL EVALUATION REPORT Report · 15 Dec 2025
  • ARCHAEOLOGICAL WORKS WRITTEN SCHEME OF INVESTIGATION Report · 15 Dec 2025
  • DESK BASED GEOARCHAEOLOGICAL DEPOSIT MODEL REPORT Report · 15 Dec 2025
  • HISTORIC ENGLAND Consultee Comment · 15 Dec 2025
  • SITE WASTE MANAGEMENT PLAN Report · 15 Dec 2025
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Report · 15 Dec 2025
  • CONSTRUCTION MANAGEMENT PLAN Report · 15 Dec 2025
  • AIR QUALITY AND DUST MANAGEMENT PLAN Report · 15 Dec 2025
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - REV 1 Report · 15 Dec 2025
  • LBTH ES ADDENDUM SCOPE REVIEW Correspondence · 06 Oct 2025
  • APPLICANT?S EIA APPROACH NOTE Correspondence · 06 Oct 2025
  • SEQUENTIAL SITE ASSESSMENT Report · 15 Aug 2025
  • RESPONSE TO OFFICERS COMMENTS IN RELATION TO THE SUBMITTED SEQUENTIAL SITE ASSESSMENT (JUNE 2025) Correspondence · 15 Aug 2025
  • NMA MASTERPLAN GROUND FLOOR PLAN Current Plan · 15 Aug 2025
  • MASTERPLAN FIRST FLOOR PLAN Current Plan · 17 Jul 2025
  • MASTERPLAN SECOND FLOOR PLAN Current Plan · 17 Jul 2025
  • MASTERPLAN THIRD FLOOR PLAN Current Plan · 17 Jul 2025
  • MASTERPLAN FOURTH FLOOR PLAN Current Plan · 17 Jul 2025
  • MASTERPLAN FIFTH FLOOR PLAN Current Plan · 17 Jul 2025
  • MASTERPLAN SIXTH FLOOR PLAN Current Plan · 17 Jul 2025
  • MASTERPLAN SEVENTH FLOOR PLAN Current Plan · 17 Jul 2025
  • MASTERPLAN EIGHTH FLOOR PLAN Current Plan · 17 Jul 2025
  • MASTERPLAN NINTH FLOOR PLAN Current Plan · 17 Jul 2025
  • MASTERPLAN BASEMENT FLOOR PLAN Current Plan · 17 Jul 2025
  • OVERALL COMPOSITE ELEVATION 2 OF 4 Current Plan · 17 Jul 2025
  • OVERALL COMPOSITE ELEVATION 4 OF 4 Current Plan · 17 Jul 2025
  • WANSBECK SQUARE COMPOSITE ELEVATION 1 OF 4 Current Plan · 17 Jul 2025
  • WANSBECK SQUARE COMPOSITE ELEVATION 2 OF 4 Current Plan · 17 Jul 2025
  • WANSBECK SQUARE COMPOSITE ELEVATION 3 OF 4 Current Plan · 17 Jul 2025
  • WANSBECK SQUARE COMPOSITE ELEVATION 4 OF 4 Current Plan · 17 Jul 2025
  • WORKSHOP RESPONSE TO PLANNING MEETING 15.05.2025 Correspondence · 17 Jul 2025
  • BLOCK W19 PLANNING PLANS Current Plan · 17 Jul 2025
  • BLOCK W19 PLANNING PLANS Current Plan · 17 Jul 2025
  • PLANNING ELEVATIONS Current Plan · 17 Jul 2025
  • PLANNING SECTIONS Current Plan · 17 Jul 2025
  • MARKETING SUMMARY REPORT Report · 16 Jul 2025
  • LBTH ES REVIEW ? INTERIM REVIEW REPORT Report · 04 Jul 2025
  • EIA REGULATION 25 REQUEST Correspondence · 04 Jul 2025
  • ES ADDENDUM APPROACH LETTER - 19 MAY 2025 Environmental Statement · 28 May 2025
  • ES ADDENDUM APPROACH LETTER - 22ND MAY 2025 Environmental Statement · 28 May 2025
  • ACA DESIGN DOCUMENT Report · 27 Nov 2024
  • ENERGY STATEMENT - LETTER OF COMPLIANCE Correspondence · 27 Nov 2024
  • COVER LETTER 30-8-24 Correspondence · 27 Nov 2024
  • ADDENDUM SCOPE LETTER Environmental Statement · 27 Nov 2024
  • MASTERPLAN GROUND FLOOR PLAN Current Plan · 27 Nov 2024
  • SITE LOCATION PLAN PROPOSED Current Plan · 27 Nov 2024
  • MASTERPLAN FIRST FLOOR PLAN Current Plan · 27 Nov 2024
  • MASTERPLAN SECOND FLOOR PLAN Current Plan · 27 Nov 2024
  • MASTERPLAN THIRD FLOOR PLAN Current Plan · 27 Nov 2024
  • MASTERPLAN FOURTH FLOOR PLAN Current Plan · 27 Nov 2024
  • MASTERPLAN FIFTH FLOOR PLAN Current Plan · 27 Nov 2024
  • MASTERPLAN SIXTH FLOOR PLAN Current Plan · 27 Nov 2024
  • MASTERPLAN SEVENTH FLOOR PLAN Current Plan · 27 Nov 2024
  • MASTERPLAN EIGHT FLOOR PLAN Current Plan · 27 Nov 2024
  • MASTERPLAN NINTH FLOOR PLAN Current Plan · 27 Nov 2024
  • MASTERPLAN BASEMENT PLAN Current Plan · 27 Nov 2024
  • OVERALL COMPOSITE ELEVATION 1 OF 4 Current Plan · 27 Nov 2024
  • OVERALL COMPOSITE ELEVATION 3 OF 4 Current Plan · 27 Nov 2024
  • BLOCK W19 PLANNING PLANS Current Plan · 27 Nov 2024
  • BLOCK W19 PLANNING ELEVATIONS Current Plan · 27 Nov 2024
  • BLOCK W19 PLANNING SECTIONS Current Plan · 27 Nov 2024
  • ADDENDUM REPORT Environmental Statement · 27 Nov 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Tower Hamlets granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • McGrath Works Depot Waste Recycling Station, 3-13 Hepscott Road, London, E9 5HB

    PA/25/01617/S Submitted 12 Sep 2025 50 yards away

    Submission of details pursuant to condition no.9 (Fire Strategy) of planning permission ref: 21/00500/REM, dated 12/12/2023

    Granted Conditions 5 docs
  • McGrath Works Depot Waste Recycling Station, 3-13 Hepscott Road, London E9 5HB

    PA/25/01555/S Submitted 9 Sep 2025 50 yards away

    Submission of Details pursuant to Condition 12C (Wheelchair User Dwellings Marketing - Report of unsold Wheelchair Homes), of Planning Permission LL/21/00500/REM dated 12/12/2023

    Granted Conditions 2 docs
  • 25 Trego Road, London, E9 5HJ

    PA/25/01994/S Submitted 18 Nov 2025 50 yards away

    Application for Non-Material amendment to planning permission ref: LL/23/00435/VAR, Dated 27/11/2024. Non Material amendment(s) Sought Revision to phrasing of Condition 2, Condition 12 and Condition 13 of the permission

    Granted Amendments 12 docs
  • 25, Trego Road, LONDON, E9 5HJ

    PA/25/02075/S Submitted 1 Dec 2025 50 yards away

    Submission of details to discharge Condition 11b (Verification Report), of planning permission ref: LL/23/00435/VAR, dated 27/11/2024

    Granted Conditions 5 docs
  • 25, Trego Road, LONDON, E9 5HJ

    PA/25/02257/S Submitted 24 Dec 2025 50 yards away

    Submission of details to discharge Condition 20 (Secured by Design), of planning permission ref: LL/23/00435/VAR, dated 27/11/2024

    Granted Conditions 3 docs
  • 25 Trego Road, London E9 5HJ

    PA/26/00473 Submitted 13 Mar 2026 50 yards away

    Application to modify the S106 Agreement Dated 25/09/2018, relating to planning permission LL/17/00225/FUL Proposed modification to clauses 3.6 and 3.7 of schedule 1 of planning agreement to allow the remaining open market homes to be occupied.

    Refused Conditions 5 docs

In Tower Hamlets

  • PA/26/01362 Refused

    Cuba Street Site, Land At North East Junction Of Manilla Street And Tobago Street, Tobago Street, London E14

    Application for non-material amendment of planning permission dated 29/05/2025, ref: PA/24/00733. Non Material Amendment(s) Sought: Amendment to the wording of Condition 3(b)(Construction Hours) and Condition 11(Construction Environmental Management & Logistics Plan)

    Received 3 Aug, published by the council 12 Aug 2026 Amendments
  • PA/26/01245/NC Awaiting decision

    21 Bow Triangle Business Centre, 21 Eleanor Street, London, E3 4UR

    Certificate of lawfulness in respect of the existing use of the railway arch at Unit 21, Bow Triangle Business Centre, as a delivery-only commercial kitchen.

    Received 9 Sep, published by the council 11 Sep 2026 Amendments
  • PA/26/01428/S Awaiting decision

    Former Poplar Bus Depot, Leven Road, London, E14 0LN

    Application for Non-Material amendment to planning permission ref: PA/19/02148, Dated 20/10/2020. Non Material amendment(s) Sought Proposed changes on product specification/supplier due to procurement reason following appointment of landscape contractor.

    Received 27 Aug, published by the council 7 Sep 2026 Amendments
  • PA/26/01435/A1 Awaiting decision

    56 - 58 Marsh Wall, London E14 9TP

    Demolition of existing buildings and construction of building up to 46 storeys (151.905 m AOD) comprising up to 795 co-living units in sui generis use together with communal facilities, non-residential floor space (class E use) and public realm improvements including landscaping, access and highways works; together with other associated works in respect of the development. This application is accompanied by an Environmental Statement. Minor Material Amendments to Planning Permission PA/22/00591 Dated 28/07/2023 Amendment include:- Variation of Condition 2 of planning permission PA/22/00591 (as amended) to include design amendments to the southern elevation and reduce the approved affordable housing payment in lieu to £15,000,000.00 .' (the 'S73 Application')

    Received 25 Aug, published by the council 28 Aug 2026 Amendments
  • PA/26/01295/S Granted

    Mulberry Place Town Hall, 5 Clove Crescent, And Lighterman House, 3 Clove Crescent, London, E14 2BG (Republic Masterplan Site)

    Application for Non-Material amendment to planning permission ref: PA/21/02182, Dated 01/12/2023. Non Material amendment(s) Sought: Amendment to the wording of Condition 2 to allow any Reserved Matters applications to be made within 3 years for the first outline plot .

    Received 27 Jul, published by the council 10 Aug 2026 Amendments