Planning application
St Patricks RC Church, Green Bank, London, E1
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Levelling access pathway to rear entrance of church. Installation of hand rails to side wall and new gate.
As published by the council, reference PA/09/02743
Application record
- Reference
- PA/09/02743
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Permit
- Received
- 18 Jan 2010
- Validated
- 18 Jan 2010
- Decided
- 15 Mar 2010
- Ward
- St Katharines and Wapping
- Decision by
- Delegated
Timeline
Dates from the published record
-
18 Jan 2010
Received by Tower Hamlets
-
15 Mar 2010
Decision issued: Permit
-
21 Nov 2026
Added to PlanIndex
Documents
7 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Tower Hamlets granted permission on 15 March 2010, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Presbytery St Patrick's Church, Dundee Street, London, E1W 2PH
t1 Sycamore: Reduce by 1-2 meters to mitigate loading on unions.
Granted -
The Presbytery St Patrick's Church, Dundee Street, London, E1W 2PH
85% historically approved · decision due ~7 Dec
Extension to existing house, to remove existing garage and revert the space back to an integeral part of the house and return the external elevations to the original design.
Awaiting decision Full applications Extension 9 docs -
Flat 41, Dundee Court, 73 Wapping High Street, London, E1W 2YG
Replacement of existing single-glazed timber window with double glazed timber window. Replacemen...
-
Flat 41, Dundee Court, 73 Wapping High Street, London, E1W 2YG
Replacement of existing single-glazed timber window with double glazed timber window. Replacemen...
Granted Windows or glazing 2 docs -
Flat 30, Dundee Court, 73 Wapping High Street, London, E1W 2YG
Listed Building Consent for Internal alterations to non-loadbearing partitions to create an open plan kitchen / living space including the removal of false ceilings.
-
7 Pier Head, Wapping High Street, London, E1W 1PN
Comprehensive refurbishment of existing building, including internal and external restoration wor...
Granted 56 docs
Other full applications
In Tower Hamlets
-
PA/26/01422 Refused
404 Bancroft Road, London, E1 4DH
Change of use from office space (Use Class E) into a large HMO (Sui Generis) for a maximum of seven people. Associated minor internal alteration.
-
PA/26/01730/NC Awaiting decision
1 Susannah Street, London, E14 6LS
Demolition of the existing extension, erection of a new single storey rear extension with x2 roof lights.
-
PA/26/01685/NC Awaiting decision
Hult Tower, 2 Education Square, LONDON, E1 1FA
Creation of a new terrace at 17th floor roof level including associated external alterations to provide new balustrading and to create new access, along with the relocation and upgrade of PV panels to 17th and 18th floor roof levels
-
PA/26/01740/NC Awaiting decision
Brody House, Strype Street, London E1 7LQ
Removal of the existing non-compliant cladding materials, replacement with compliant insulated render and cladding materials, replacement windows and associated works.
-
PA/26/01756 Awaiting decision
1- 7 Brannan Street, Wood Wharf, E14
Application for temporary planning permission (7 years) for the provision of seven padel courts and the erection of associated enclosures and lighting, erection of ancillary clubhouse, enabling development, boundary treatments, back of house areas, works of hard and soft landscaping, provision of cycle parking and associated works.