Planning application

1/1239/2022/FUL

Coppers Rectory Road Dolton Winkleigh Devon EX19 8QL

Granted Torridge Full Application

Proposal

Erection of single story side extension and two storey extension to the rear

As published by the council, reference 1/1239/2022/FUL

Timeline

Dates from the published record

  1. 9 Dec 2022

    Received by Torridge

  2. 1 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 29 Mar 2023

    Decision issued: Application Approved

  4. 1 Aug 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 1/0463/2026/FUH Awaiting decision

    Silverdale Barfield Close Dolton Winkleigh Devon EX19 8QY

    Replacement of existing conservatory with a new sun/garden room

    25 Jun 2026 178m away Householder
  • 1/0138/2026/TCA Granted

    Stretton House Rectory Road Dolton Winkleigh Devon EX19 8QL

    Works to trees within a Conservation Area - Crown reduction to 1no. fir tree.

    17 Feb 2026 200m away Trees
  • 1/0834/2025/SEC106 Awaiting decision

    Land At Grid Reference 257625 112263 Dolton Devon

    Deed of variation for S106 agreement relating to permission 1/0701/2018/OUTM (Affordable Housing)

    27 Oct 2025 252m away Conditions
  • Land North Of Aller Road Dolton Devon

    Reserved matters application for appearance, landscaping, layout and scale for 25 dwellings pursuant to outline planning permission 1/0701/2018/OUTM and associated engineering works

    28 Sep 2023 252m away Reserved matters
  • 1/0037/2026/DIS Awaiting decision

    Land North Of Aller Road Dolton Devon

    Discharge of conditions 3,4,5,6 & 8 of planning approval 1/0939/2023/REMM (materials, LEAP, public open spaces scheme, phasing plan)

    28 Apr 2026 263m away Conditions
  • 1/0038/2026/DIS Granted

    Land North Of Aller Road Dolton Devon

    Discharge of condition 6 (Construction Management Plan) and condition 22 (WSI) of planning approval 1/0701/2018/OUTM

    28 Apr 2026 269m away Conditions

In Torridge

  • 1/0554/2026/FUL Awaiting decision

    The Forge Milton Damerel Holsworthy Devon EX22 7NP

    Removal of existing conservatory and roof, and erection of rear extension, first floor extension and new parking provision.

    30 Jul 2026 Full applications
  • 1/0258/2026/FUL Granted

    The Pollyfield Community Association Pollyfield Community Centre Avon Road Bideford Devon EX39 4BL

    Single storey extension, with internal refurbishment works and associated external works/landscaping

    1 Apr 2026 Full applications
  • 1/0362/2026/FUL Granted

    Higher Brendon Woodacott Holsworthy Devon EX22 7BR

    Construction of a menage

    19 May 2026 Full applications
  • 1/0551/2026/FUL Awaiting decision

    The Stables Buckland Filleigh Beaworthy Devon EX21 5HZ

    Installation of Package Treatment Plant

    29 Jul 2026 Full applications
  • 1/0549/2026/FUL Awaiting decision

    RHS Garden Rosemoor Torrington Devon EX38 8PH

    Erection of a glasshouse

    28 Jul 2026 Full applications