Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Grid Reference 254814 115022 Beaford Devon

Granted Torridge 1/0794/2022/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Part-retrospective application for the erection of implement shed and agricultural storage buildings

As published by the council, reference 1/0794/2022/FUL

Application record

Reference
1/0794/2022/FUL
Type
Full Application
Status
Application Permitted
Decision
Application Approved
Received
26 Jul 2022
Validated
17 Aug 2022
Decided
25 Oct 2022
Ward
Two Rivers And Three Moors
Parish
Beaford
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 26 Jul 2022

    Received by Torridge

  2. 17 Aug 2022

    Validated

    Checked as complete and ready for consideration.

  3. 25 Oct 2022

    Decision issued: Application Approved

  4. 23 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land At Grid Reference 254930 114990 Beaford Devon

    1/0566/2026/PIP Submitted 4 Aug 2026 58m away

    92% historically approved · decision due ~29 Sep

    Permission in Principle for a residential development of a minimum of 5no. to a maximum of 9no. dwellings.

    Awaiting decision Outline New dwelling 13 docs
    Several homes
  • Land At Grid Reference 254814 115022 Beaford Devon

    1/0739/2022/AGR Submitted 12 Jul 2022 130m away

    Erection of steel framed shed to store equipment

    Withdrawn Other
    Small domestic
  • Canns Down Press Beaford Winkleigh Devon EX19 8LZ

    1/0898/2025/FUL Submitted 19 Nov 2025 188m away

    Erection of garage and porches

    Granted Full applications 16 docs
  • Canns Down Press Beaford Winkleigh Devon EX19 8LZ

    1/0276/2024/FUL Submitted 20 Mar 2024 194m away

    Change of use of office & warehouse into a dwelling with office alongside, with proposed coach house with granny annexe above (Variation of conditions 2 and 4 of planning approval 1/0647/2020/FUL)

    Granted Full applications 15 docs
    Domestic
  • Land At Grid Reference 254855 114852 Mill Road Beaford Devon

    1/0757/2022/FUL Submitted 15 Jul 2022 244m away

    Part retrospective application for the proposed change of use of agricultural land to siting of 2 no. mobile shepherd huts for holiday use

    Withdrawn Full applications
  • Latchford Beaford Winkleigh EX19 8LU

    1/1071/2022/FUL Submitted 24 Oct 2022 273m away

    Proposed extension and internal alterations to create annexe (Amended red edge, plans and description)

    Granted Full applications Extension 26 docs

In Torridge

  • Land At Timber Lodge Buckland Brewer Devon

    Erection of a calf rearing building, extension to existing buildings, erection of farm office/grub room/welfare unit and associated yards, track and entrance.

    2 Mar 2026 Full applications
  • Land At Ebberley Down Ebberley Devon EX38 7JS

    Construction and operation of a grid-connected solar photovoltaic farm, incorporating battery storage, with infrastructure, landscaping and biodiversity enhancements (Variation of conditions 2, 8, 10, 11, 16, 17 and 22 of planning approval 1/1225/2023/FULM)

    20 Mar 2026 Full applications
  • 1/0473/2026/FUL Granted

    Bradworthy Inn The Square Bradworthy Holsworthy Devon EX22 7TD

    Part retrospective application for the erection of a pergola structure with retractable roof within courtyard

    1 Jul 2026 Full applications
  • 1/0548/2025/FUL Granted

    Agricultural Buildings At Grid Reference 238282 115642 East Putford Devon

    Conversion of redundant barns to 3 dwellings (amended description)

    3 Jul 2025 Full applications
  • 1/0487/2026/FUL Granted

    Land At Grid Reference 263552 108770 Winkleigh Devon

    Proposed vehicle inspection pit and B8 (Storage & Distribution) building including extension of existing concrete yard

    7 Jul 2026 Full applications