Planning application

Mahana Hilltop Road Bideford Devon EX39 3PA

Granted Torridge 1/0384/2023/FUL Full Application

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Extension and alterations to existing dwelling

As published by the council, reference 1/0384/2023/FUL

Application record

Reference
1/0384/2023/FUL
Type
Full Application
Status
Application Permitted
Decision
Application Approved
Received
26 Apr 2023
Validated
4 May 2023
Decided
13 Jun 2023
Ward
Northam
Parish
Northam
Decision by
Delegated Decision
Postcode
EX39 3PA

Timeline

Dates from the published record

  1. 26 Apr 2023

    Received by Torridge

  2. 4 May 2023

    Validated

    Checked as complete and ready for consideration.

  3. 13 Jun 2023

    Decision issued: Application Approved

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Torridge

  • Land At Timber Lodge Buckland Brewer Devon

    Erection of a calf rearing building, extension to existing buildings, erection of farm office/grub room/welfare unit and associated yards, track and entrance.

    2 Mar 2026 Full applications
  • Land At Ebberley Down Ebberley Devon EX38 7JS

    Construction and operation of a grid-connected solar photovoltaic farm, incorporating battery storage, with infrastructure, landscaping and biodiversity enhancements (Variation of conditions 2, 8, 10, 11, 16, 17 and 22 of planning approval 1/1225/2023/FULM)

    20 Mar 2026 Full applications
  • 1/0473/2026/FUL Granted

    Bradworthy Inn The Square Bradworthy Holsworthy Devon EX22 7TD

    Part retrospective application for the erection of a pergola structure with retractable roof within courtyard

    1 Jul 2026 Full applications
  • 1/0548/2025/FUL Granted

    Agricultural Buildings At Grid Reference 238282 115642 East Putford Devon

    Conversion of redundant barns to 3 dwellings (amended description)

    3 Jul 2025 Full applications
  • 1/0487/2026/FUL Granted

    Land At Grid Reference 263552 108770 Winkleigh Devon

    Proposed vehicle inspection pit and B8 (Storage & Distribution) building including extension of existing concrete yard

    7 Jul 2026 Full applications