Planning application
Land At Webbery Barton And Cleave Farm Bideford Devon
Works: Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of conditions 9, 10, and 15 of planning approval 1/1057/2021/FULM (Tree protection, CMP, CEMP)
As published by the council, reference 1/0089/2023/DIS
Application record
- Reference
- 1/0089/2023/DIS
- Type
- Discharge of Conditions
- Status
- Application Permitted
- Decision
- Application Approved
- Received
- 20 Nov 2023
- Validated
- 20 Nov 2023
- Decided
- 11 Jan 2024
- Ward
- Two Rivers And Three Moors
- Parish
- Alverdiscott
- Decision by
- Delegated Decision
Site history
Applications at this address on the Torridge register
This site has had 2 applications since 2022: 2 approved, 0 refused.
-
1/0796/2022/FUL Granted
Land At Webbery Barton And Cleave Farm Bideford Devon
Installation of underground electricity cables at Gammaton Moor Solar Farm to connect to the DNO substation - (1/1057/2021/FULM)
Timeline
Dates from the published record
-
20 Nov 2023
Received by Torridge
-
11 Jan 2024
Decision issued: Application Approved
-
1 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Torridge granted permission on 11 January 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Electricity Substation At Grid Reference 250194 125149 Alverdiscott Devon
Replace an existing switch room flat roof with a pitched roof increasing the height by 2.6 metres.
Granted Full applications 15 docs -
Land At Webbery Barton And Cleave Farm Bideford Devon
Installation of underground electricity cables at Gammaton Moor Solar Farm to connect to the DNO substation - (1/1057/2021/FULM)
Granted Full applications 15 docs
Other condition discharge and variation applications
In Torridge
-
1/0078/2026/DIS Awaiting decision
Agricultural Building At Grid Reference 237302 103441 Hollacombe Devon
Discharge of conditions 3, 7 and 8 of planning approval 1/0207/2025/FUL
-
1/0077/2026/DIS Awaiting decision
Land At Grid Reference 238578 121024 Parkham Devon
Discharge of condition 4 (Noise) of planning approval 1/0686/2021/OUT
-
1/0057/2026/DIS Granted
Middle Dock New Quay Street Appledore Devon EX39 1LU
Discharge of conditions 8, 9, 12 and 22 of planning approval 1/0101/2025/LA (Boundary Treatments, WSI and lighting)
-
1/0076/2026/DIS Awaiting decision
Globe Hotel Fore Street Torrington Devon EX38 8HQ
Discharge of condition 3 of planning approval 1/0452/2026/LBC
-
1/0036/2026/DIS Granted
Higher Alsworthy Farm Caravan Site Bradworthy Devon EX22 7RW
Discharge of condition 6 of planning approval 1/0459/2025/FULM (Surface Water)