Planning application
Barn At Berrington Farm Ashwater Devon
Works: Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non material amendment to planning approval 1/0401/2021/FUL - Insertion of roof lights and addition and relocation of flues
As published by the council, reference 1/0059/2022/NMAT
Application record
- Reference
- 1/0059/2022/NMAT
- Type
- No Mat difference to exist Plan Perm
- Status
- Application Permitted
- Decision
- Application Approved
- Received
- 22 Dec 2022
- Validated
- 3 Jan 2023
- Decided
- 24 Jan 2023
- Ward
- Broadheath
- Parish
- Ashwater
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
22 Dec 2022
Received by Torridge
-
3 Jan 2023
Validated
Checked as complete and ready for consideration.
-
24 Jan 2023
Decision issued: Application Approved
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Torridge is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
Barn At Grid Reference 238517 097363 Ashwater Devon
Change of use of barn from offices to dwelling (Amendment to 1/0402/2021/LBC) - Insertion of roof lights and addition and relocation of flues
Granted Heritage and listed buildings Loft or dormer 32 docsDomestic -
Agricultural Building Adjacent Home Farm Ashwater Beaworthy Devon EX21 5EP
Prior notification for the change of use of agricultural building to 1no. dwellinghouses and associated building operations under Class Q
Granted Other 16 docsDomestic -
Agricultural Building At Grid Reference 238658 097391 Ashwater Devon
91% historically approved · decision due ~20 Oct
Demolition of existing building and erection of 1no. dwelling with associated works in lieu of Class Q permission 1/0349/2025/AGMB
Awaiting decision Full applications Demolition 11 docsDomestic -
Land At Grid Reference 238542 097402 Ashwater Devon
Creation of an access track
Granted Other 5 docs -
Heath Ashwater Beaworthy Devon EX21 5EP
Demolition of existing conservatory and replacement two storey extension
Granted Full applications Extension Demolition 19 docs