Planning application

Big Pit (blaenafon) Trust Ltd Gilchrist Thomas Industrial Estate Blaenavon Torfaen NP4 9XP

Granted Torfaen 25/P/0289/FUL Full Application

Works: Extension Demolition Windows or glazing

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Proposed demolition and replacement of fan house extension, new external path and associated works and repairs including vision panels, balustrade and steps, restoration of windows and RWG, new downpipe, replacing slate tiles and repointing

As published by the council, reference 25/P/0289/FUL

Application record

Reference
25/P/0289/FUL
Type
Full Application
Status
Decided
Decision
Approve with Conditions
Received
6 May 2025
Validated
6 May 2025
Decided
13 Feb 2026
Ward
Blaenavon
Parish
Blaenavon Town Council
Decision by
Delegated Decision
Postcode
NP4 9XP

Timeline

Dates from the published record

  1. 6 May 2025

    Received by Torfaen

  2. 13 Feb 2026

    Decision issued: Approve with Conditions

  3. 3 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

67 applications on PlanIndex · across 20 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Torfaen

  • 26/P/0411/FUL Awaiting decision

    Unit 3a Lakeside Court Llantarnam Cwmbran Torfaen NP44 3GA

    Change of use of existing ground floor premises from B1 to D1 to provide a chiropractic clinic (re-submission of application 26/P/0041/FUL)

    1 Sep 2026 Full applications
  • 26/P/0407/FUL Awaiting decision

    Kiosk 7-9 Gwent Square Cwmbran Torfaen NP44 1PW

    Change of Use from A1 to A3 together with the provision of extractor fan

    28 Aug 2026 Full applications
  • 26/P/0400/FUL Awaiting decision

    60 Commercial Street Pontnewydd Cwmbran Torfaen NP44 1AE

    Siting of Royal Mail parcel locker

    27 Aug 2026 Full applications
  • 25/P/0692/FUL Withdrawn

    23 Broad Street Blaenavon Torfaen NP4 9NE

    Proposed conversion of three flats to six self-contained flats and associated works including new fenestration and external wall insulation

    11 Nov 2025 Full applications
  • 26/P/0379/FUL Awaiting decision

    Flat 1 High Street Pontypool Torfaen NP4 6EY

    Replacement of flat roof with new mono pitched lightweight metal roof

    18 Aug 2026 Full applications