Planning application
3 Roundhill Road Torquay TQ2 6TQ
Works: Extension Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of front extension and first floor side extension over existing utility. Construction of two storey rear extension. Construction of additional driveway, with widening of existing driveway, including front planter.
As published by the council, reference P/2026/0303
Application record
- Reference
- P/2026/0303
- Type
- Householder Application
- Status
- Decided
- Decision
- Granted As published: Approval
- Received
- 7 May 2026
- Validated
- 7 May 2026
- Decided
- 30 Jun 2026
- Ward
- Cockington With Chelston
- Decision by
- Delegated
- Postcode
- TQ2 6TQ
Site history
Applications at this address on the Torbay register
This site has had 2 applications since 2026: 1 approved, 1 refused.
-
P/2026/0105 Refused
3 Roundhill Road Torquay TQ2 6TQ
Variation of Condition relating to application P/2025/0047: Alterations and improvements to include two storey extension to front, first floor extension to side, creation of additional parking and installation of two storey conservatory to rear. Condition: P1 - Approved Plans. Variation sought: amendment to design of rear extension.
Timeline
Dates from the published record
-
7 May 2026
Received by Torbay
-
30 Jun 2026
Decision issued: Approval
-
1 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Buildingcontrol: 26.04804 (Building Work Started)
Who's behind it
Company information only, from the register and Companies House
Co Create Architects Agent, an architecture practice
60 applications on PlanIndex · across 6 councils · 82% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Torbay granted permission on 30 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About householder applications
Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
3 Roundhill Road Torquay TQ2 6TQ
Variation of Condition relating to application P/2025/0047: Alterations and improvements to include two storey extension to front, first floor extension to side, creation of additional parking and installation of two storey conservatory to rear. Condition: P1 - Approved Plans. Variation sought: amendment to design of rear extension.
Refused Amendments Extension -
6 Roundhill Road Torquay TQ2 6TH
Demolition of side garage and rear conservatory, formation of two storey side extension and single storey rear extension.
Granted Householder Extension Demolition 18 docsSmall domestic -
32 Barnfield Road Torquay TQ2 6TN
Removal of existing balcony and construction of enlarged replacement balcony. Enlargement of driveway to form turning area and new entrance steps.
Granted Householder 13 docsDomestic -
20 Roundhill Road Torquay Devon TQ2 6TH
Change Of Use To B1 (Office Accommodation)
Granted Full applications 6 docs -
Land Adjacent To 48 Broadpark Road Torquay TQ2 6UP
Installation of equipment cabinets.
Decided Telecoms -
18A Mead Road Torquay TQ2 6TF
80% historically approved · decision due ~5 Oct
Crown lift secondary branch growth only up to approximately 4.5m from ground level to achieve the required vertical clearance above the driveway and neighbours. Crown thin overall leaf bearing twig structure by 10 percent. This will also help with canopy crowding and avoid other trees rubbing against each other. Remove all major dead wood from crown All trees are Fagus Sylvatica (Mature Beech) This work has been previously accepted in 2023, application submitted by Devon Tree Services and works were completed by them as well.
Awaiting decision Trees
Other householder applications
In Torbay
-
P/2026/0356 Granted
White Gables Seaway Lane Torquay TQ2 6PS
Formation of off-grid single-storey, two-bedroom, self-contained ancillary accommodation with solar panels. Installation of solar panels on host dwelling and resurfacing of existing gated site access off Seaway Lane with block paving.
-
P/2026/0566 Awaiting decision
10 Lytes Road Brixham TQ5 9SN
Construction of single storey side extension to provide garage/store.
-
P/2026/0161 Refused
224 Newton Road Torquay TQ2 7JN
Formation of side and rear two story extension with additional windows on the (S) side elevation.
-
P/2026/0442 Granted
41 Braddons Hill Road East Torquay TQ1 1HB
Construction of replacement porch.
-
P/2026/0375 Granted
43 Albany Road Paignton TQ3 1BZ
Construction of single storey rear (N) and side (E) extension, front (S) canopies, associated landscaping works and retrospective shed and side (NW) window.