Planning application
Sea Change Cockington Court Cockington Lane Torquay TQ2 6XA
Works: Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of roofs to 3no. Sea Change units, to include removal of Velux roof lights.
As published by the council, reference P/2025/0818
Application record
- Reference
- P/2025/0818
- Type
- Regulation 3 Application - Torbay
- Status
- Decided
- Decision
- Approval
- Received
- 15 Dec 2025
- Validated
- 19 Jan 2026
- Decided
- 25 Feb 2026
- Ward
- Cockington With Chelston
- Decision by
- Delegated
- Postcode
- TQ2 6XA
Timeline
Dates from the published record
-
15 Dec 2025
Received by Torbay
-
19 Jan 2026
Validated
Checked as complete and ready for consideration.
-
25 Feb 2026
Decision issued: Approval
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Torbay granted permission on 25 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Cockington Court Cockington Lane Torquay TQ2 6XA
Upgrade of existing fire alarm system, to include installation of new ceiling mounted detectors, wall mounted manual call points and new cabling.
Withdrawn Heritage and listed buildings 22 docs -
Drum Inn Cockington Lane Torquay TQ2 6XA
Installation of fixed line broadband apparatus.
Decided Telecoms -
Weavers Cottage Cockington Lane Torquay TQ2 6XA
81% historically approved · decision due ~27 May
Replacement of failing single glazed C20/C21 windows with timber, heritage double glazed casement windows.
Awaiting decision Heritage and listed buildings Windows or glazing -
Weavers Cottage Cockington Lane Torquay TQ2 6XA
Change of use of ground floor to residential status.
Granted Full applications 10 docs -
Higher Cottage Cockington Lane Torquay TQ2 6XA
Oak next to garage. Beech in rear garden. Acer in front garden. Crown reduction for all trees to keep the size in proportion to the location in the garden. OAK (C on map) The current dimensions are width 10.6m x 12.2m high. As you can see in the photos, some of the branches are touching the roof of the garage. Recommendation - 2 metres crown reduction BEECH (B on map) The current dimensions are width 12.2m x 18.2 high. Recommended crown reduction of 3 metres to keep in proportion to size of garden and also prevent sap damage to neighbour's thatched roof. ACER (A on map) The current dimensions are width 10.6 x 13.7 high Recommended reduction of 3 metres, again to keep in proportion to the size of the garden and also to prevent sap from damaging another neighbours thatched roof. All these dimensions are approximate and all trees are in good condition because of continuing maintenance.
Granted Trees -
Mid Summer Cottage Cockington Lane Torquay Devon TQ2 6XA
T1: Beech- Deadwood; Crown lift to 3m; Reduction of branches from adjacent property by 2mT2: Sycamore- Reduction of branches away from adjacent building by 2m
Granted Trees 1 doc
Other less common application types
In Torbay
-
P/2026/0501 Awaiting decision
Bay Advocates Torbay Business Centre Lymington Road Torquay TQ1 4BD
Installation of 2 no. Air Source Heat Pumps and associated works.
-
P/2026/0109 Granted
Torre Abbey Beach Catering And Paddleboard Hire Torre Abbey Beach Promenade Torquay TQ2 5JE
Installation of two cabins for non-motorised water sports rental and sale of food and drink, with associated refuse bins and seating area from 24th April to 6th October each year. Operation of catering van (up to 3m in length) over winter from 7th October to 23rd April. Temporary period of five years.
-
P/2026/0225 Granted
Higher Brixham Primary And Nursery School Chestnut Drive Brixham TQ5 0EQ
Installation of 2 no. air source heat pumps and associated pipe works onto roof.
-
P/2026/0043 Granted
Victoria Centre And Victoria Square Parkside Road Paignton TQ4 6PE
Temporary change of use from commercial and a public square to a surface car park (Sui Generis) for a 5-year period, resurfacing of site and associated works. (The proposed development to which the application relates is situated within 10 metres of relevant railway land).
-
P/2026/0016 Granted
Sherwell Valley Primary School Hawkins Avenue Torquay TQ2 6ES
Installation of X 5 A/C condensers, associated cable trays and acoustic enclosure. Installation of insulation and associated works.