Skip to content
PlanIndex Get alerts
Menu

Planning application

Clover Hennapyn Road Torquay TQ2 6QR

Granted Torbay P/2024/0830 Non Material Amendment

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non-material amendment relating to P/2023/0844. Amendment sought: substitute vertical timber cladding with vertical Millboard cladding.

As published by the council, reference P/2024/0830

Application record

Reference
P/2024/0830
Type
Non Material Amendment
Status
Decided
Decision
Approval
Received
2 Dec 2024
Validated
2 Dec 2024
Decided
19 Dec 2024
Ward
Cockington With Chelston
Decision by
Delegated
Postcode
TQ2 6QR

Timeline

Dates from the published record

  1. 2 Dec 2024

    Received by Torbay

  2. 19 Dec 2024

    Decision issued: Approval

  3. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About amendments applications

How this application type works

An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.

More on amendments applications in our guide

Nearby applications

Within 500 metres

  • Mead Cottage Cockington Lane Torquay TQ2 6QS

    AT/2026/0179 Submitted 17 Jul 2026 42m away

    81% historically approved · decision due ~16 Sep

    Monterey cypress T1 and Lawson cypress T2 - crown reduction by a maximum of 2 metres. Both are in very limited space and are already damaging garden furniture. T1 was heavily reduced on one side by the utility company, as BT cables pass through the crown. Reasons: The tree?s root system has displaced and damaged the adjacent stone and brick walling, creating structural issues and minor trip hazards. The crown currently encroaches over the patio and wall, increasing debris fall and obstruction. The proposed works are intended to manage foreseeable conflict with built structures and reduce nuisance while retaining the tree?s overall form and contribution to the setting. The intervention is proportionate and consistent with BS3998 and NTSG principles, addressing specific areas of conflict without imposing excessive reduction.

    Awaiting decision Trees
  • 19 Monterey Close Torquay TQ2 6QW

    AT/2025/0338 Submitted 10 Nov 2025 104m away

    T1- Monterey Pine Reason for Works: The Monterey Pine is showing advanced physiological decline, with an estimated 70% crown dieback. The tree contains large-diameter deadwood throughout the canopy and displays symptoms consistent with needle blight, including extensive needle loss and poor foliage condition. Vitality is severely reduced and decline is progressive with no realistic chance of recovery. Justification: The structural integrity of the tree is compromised due to the extent of deadwood and crown decline. This creates an increased risk of branch and potential stem failure, posing a hazard to nearby property. Removal via sectional dismantle is necessary to mitigate safety risks and prevent uncontrolled failure. Proposed Method: Sectional dismantle using controlled climbing and rigging techniques to safely lower sections and avoid damage to surrounding property and vegetation. Stump to be left level with the ground. Replacement Planting: A suitable replacement tree species, to be agreed with the Local Planning Authority, will be planted within the next planting season to maintain site amenity and biodiversity value.

    Granted Trees
  • Charter House Cockington Lane Torquay TQ2 6QT

    AT/2024/0271 Submitted 4 Oct 2024 108m away

    I plan to remove the hazardous dead elm tree The tree is completely dead and within proximity to the public road foot path and also parking of the property.

    Granted Trees 6 docs
  • Charter House Cockington Lane Torquay TQ2 6QT

    P/2026/0160 Submitted 16 Mar 2026 119m away

    Change of use from guest accommodation with owners' accommodation (C1) to single residential dwelling with parking, waste storage and amenity space (C3).

    Granted Full applications
    Domestic
  • Morden House Cockington Lane Torquay TQ2 6QT

    AT/2024/0266 Submitted 3 Oct 2024 121m away

    I plan to remove the hazardous failed ash tree that poses an unacceptable risk to property of the nights house charter house which is run as an air bnb. The tree is targeting there building main drive and entrance for the guests. The tree has lost it's codominant stem and 50% of the canopy leaving it structurally compromised with a stem failure of over 50% leaving it mechanically and structurally compromised.

    Granted Trees 6 docs
  • Morden House Cockington Lane Torquay TQ2 6QT

    AT/2025/0273 Submitted 9 Sep 2025 129m away

    Oak (T1) - In accordance with BS3998:2010, it is proposed to remove internal branches that are exerting mechanical pressure on the BT telecommunications cables, ensuring pruning cuts are made at appropriate junctions to preserve structural integrity and maintain a maximum clearance of one metre from the cables, while also undertaking the removal of dead, dying, or fractured branches exceeding 25mm diameter throughout the crown to mitigate risk and improve tree health, with all works to be carried out by a qualified arborist using clean, sharp tools to promote optimal healing and ecological sensitivity. Seating area located within the crown's dripline. Ash (G1) - Removal due to its declining condition and poor contribution to the garden?s visual amenity, which has otherwise been developed to a high standard. The tree is exhibiting clear signs of Ash dieback (Hymenoscyphus fraxineus), and extensive decay is present within the lower stem, compromising its structural integrity and long-term viability. It is recommended that the tree be felled and replaced with a smaller, more suitable ornamental species, such as Sorbus, to enhance the landscape character and ensure sustainable planting within the garden setting.

    Granted Trees

In Torbay

  • P/2026/0304 Granted

    St Helens Higher Erith Road Torquay TQ1 2NQ

    Variation of Condition relating to application P/2023/1090 (Variation of Condition relating to application P/2022/0423: Conversion of existing building to form four flats and formation of extension to form further three flats. Condition: P1 - Approved Plans. Variation sought: Alterations to the parking layout and building entrance of approved development.). Variation sought in relation to Conditions: P1 - Approved Plans and 04 - External Materials.

    8 May 2026 Amendments
  • P/2026/0495 Awaiting decision

    11 Alta Vista Road Paignton TQ4 6DB

    Non-Material Amendments to P/2026/0277. Amendments sought: Solar panels added to southern roof elevation of coach houses, brick material finish added to northern and eastern elevations of coach houses, coach house garage doors resized, projecting brick wall added to ground floor of southern elevations of coach houses.

    7 Aug 2026 Amendments
  • P/2026/0497 Awaiting decision

    St Kilda 15 Drew Street Brixham TQ5 9JU

    Non-Material Amendment to P/2025/0417. Amendments sought: Colour change of down water pipes.

    7 Aug 2026 Amendments
  • P/2026/0371 Granted

    Riviera Mansion Warren Road Torquay TQ2 5TN

    Variation of Condition on application P/2024/0459: Extension of second floor balcony to rear elevation. Condition: p1 - Approved Plans. Variation sought: Installation of spiral staircase from balcony to communal garden. Retrospective.

    9 Jun 2026 Amendments
  • P/2026/0486 Awaiting decision

    Rowcroft Hospice Avenue Road Torquay TQ2 5LS

    Non-Material Amendment relating to application P/2024/0497: Variation of Conditions relating to major application P/2022/0772: Demolition of Mildmay, the art room and estate workshop buildings and construction of new 60-bed specialist dementia & complex needs nursing home with ancillary facilities (Use Class C2). Remodelling of and extension to Main House to provide a 14-bed inpatients unit with ancillary facilities (Use Class C2). Remodelling of Rainbow House and construction of 40 assisted living units with communal facilities (Use Class C2). Construction of 3 guest lodges (Use Class C2). Construction of shared resident and community facilities comprising restaurant (Use Class E(b)), creche / nursery (Use Class E(f)) and community room / village hall (Use Class F2(b)). Construction of estate workshop. Associated car and cycle parking. Comprehensive landscape scheme to include publicly accessible amenity space, communal and private amenity space, restoration of boating lake, sustainable drainage features, allotments, new tree planting and associated works. Various vehicular, cycle and pedestrian routes through the site. All associated infrastructure works. (As amended by plans received 14.11.2022). Conditions: P1 - Approved Plans, 15 - Arboricultural Method Statement, 21 - Parking Management Plan, 23 - Landscaping Scheme, 33 - Care Home Ancillary Units. Variation sought: amendments to restaurant, nursery and community room/village hall with associated amendments to landscaping, generator plant and parking. Amendments sought: Alterations to approved plans, including: Removal of gabion walls. Adjustments to location of proposed guest lodges. Amendment bridge access to proposed lodges, in line with appropriate grading. Amended engineering design of estates workshop and associated hardstanding.

    4 Aug 2026 Amendments