Planning application
39 Burridge Road Torquay Devon TQ2 6LZ
Works: New dwelling Extension Demolition Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition works; 2 storey extension at side to 2 flats; internal works to up grade living spaces to form 2 maisonettes; alterations to garden and parking
As published by the council, reference P/2010/0545
Application record
- Reference
- P/2010/0545
- Type
- Planning Application
- Status
- Decided
- Decision
- Approval
- Received
- 18 May 2010
- Validated
- 23 Jun 2010
- Decided
- 21 Sep 2010
- Ward
- Cockington With Chelston
- Decision by
- Delegated
- Postcode
- TQ2 6LZ
Timeline
Dates from the published record
-
18 May 2010
Received by Torbay
-
23 Jun 2010
Validated
Checked as complete and ready for consideration.
-
21 Sep 2010
Decision issued: Approval
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
58 Burridge Road Torquay TQ2 6LY
Extension at 1st floor level over existing kitchen extension.
Granted Householder Extension 11 docsDomestic -
Dingwood Huxtable Hill Torquay TQ2 6RN
Formation of single storey rear flat roof extension at ground floor and a first floor hipped extension to include composite cladding to 1st floor, single-storey garage to side & storm porch extension to front entrance.
Granted Householder ExtensionSmall domestic -
25 Nut Bush Lane Torquay TQ2 6SA
Removal of side conservatory and replace with two-storey side extension (south east elevation) and formation of ground floor raised balcony on the north east elevation (rear).
Granted Householder ExtensionSmall domestic -
Domestic
-
Fairfield West Huxtable Hill Torquay TQ2 6RN
T1 - Beech - Crown lift by approximately 2 metres removing up to 30 minor secondary branches to provide clearnance while retaining a natural and balanced form. T2 - Beech - Lateral reduction of the crown by 1-2 metres to leave an approximate final spread of 6 metres with all pruning cuts made back to suitable growth points. T3 - Holm Oak - Lateral crown reduction by up to 1 metre leaving an approximate final spread of 5 metres, maintaining natural shape and tree health. Justification for proposed works. T1 - Beech - The tree has developed low-hanging branches with excessive lateral weight increasing the risk of branch failure. A minor crown lift will help reduce loading stress while improving clearance and maintaining tree health and form. The proposed works are proportional and preventative. T2 - Beech - The crown is growing in close proximity to the building with lateral spread approaching the structure. Selective lateral reduction will prevent future conflict with the property, minimise risk of damage and maintain a safe management distance while retaining the tree's natural shape. T3 - Holm Oak - This tree is also spreading toward the building and requires a light lateral reduction to prevent obstruction and potential contact with the structure. The work is preventative and intended to avoid future damage, shading and maintenance issues. All works are minimal, sympathetic and designed to retain natural form while preventing future structural or safety-related issues. The works are considered appropriate tree management rather than aesthetic alteration.
Granted Trees -
35 Thorne Park Road Torquay TQ2 6RU
Formation of single storey extension to rear.
Granted Householder Extension 7 docsSmall domestic
Other full applications applications
In Torbay
-
P/2025/0768 Granted
St Edmunds Hotel 25 Sands Road Paignton TQ4 6EG
Change of use from guest house to dwelling.
-
P/2026/0532 Awaiting decision
41 Totnes Road Paignton TQ4 5LA
Change of use from ambulance offices (use class E) to residential institution as adult respite centre (use class C2) to include construction of single storey extension to rear and associated works.
-
P/2026/0271 Withdrawn
15 Scarborough Road Torquay TQ2 5UJ
Change of use from C1 (guesthouse) to C4 (six-bed HMO) with no external alterations. Existing self-contained basement flat retained as C3 dwelling. No building works proposed.
-
P/2026/0512 Awaiting decision
33A New Road Brixham TQ5 8NB
Change of use of garage to affordable residential unit. Alterations to fenestration.
-
P/2026/0309 Refused
The Rosewood 56 Belgrave Road Torquay TQ2 5HY
Change of use of upper floors of property from C1 (guesthouse) to six-bedroom HMO. Basement and ground floor owner's accommodation remains unchanged. No external alterations.