Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Windmill Hill Wrotham Heath Sevenoaks Kent TN15 7SU

Granted Tonbridge and Malling 26/01159/FL

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey and first floor rear extensions

As published by the council, reference 26/01159/FL

Application record

Reference
26/01159/FL
Status
Decided
Decision
Approved
Received
19 Jun 2026
Validated
19 Jun 2026
Decided
1 Sep 2026
Ward
Borough Green And Platt
Parish
Platt
Decision by
Delegated
Postcode
TN15 7SU

Timeline

Dates from the published record

  1. 19 Jun 2026

    Received by Tonbridge and Malling

  2. 29 Jul 2026

    Added to PlanIndex

  3. 30 Aug 2026

    Status changed to Awaiting decision

    Previously Registered.

  4. 1 Sep 2026

    Decision issued: Approved

  5. 10 Sep 2026

    Status changed to Decided

    Previously Awaiting decision.

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

  • DELEGATED REPORT Decision · 01 Sep 2026
  • PROPOSED ELEVATIONS Drawing · 10 Aug 2026
  • SOUTHERN WATER SERVICES Consultee Response · 16 Jul 2026
  • SITE NOTICE Application Form · 08 Jul 2026
  • APPLICATIONFORMREDACTED Application Form · 19 Jun 2026
  • EXISTING LOCATION PLAN Site Location Plan · 19 Jun 2026
  • PROPOSED LOCATION PLAN Site Location Plan · 19 Jun 2026
  • EXISTING ELEVATIONS Drawing · 19 Jun 2026
  • EXISTING FLOOR PLANS Drawing · 19 Jun 2026
  • EXISTING BLOCK PLAN Drawing · 19 Jun 2026
  • PROPOSED FLOOR PLANS Drawing · 19 Jun 2026
  • PROPOSED BLOCK PLAN Drawing · 19 Jun 2026
  • EXISTING PHOTOGRAPHS Photo · 19 Jun 2026
  • NETWORK RAIL Consultee Response · 21 Apr 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Tonbridge and Malling granted permission on 1 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Tonbridge and Malling's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres