Skip to content
PlanIndex Get alerts
Menu

Planning application

Rose Cottage 440 Lunsford Lane Larkfield Aylesford Kent ME20 6JA

Awaiting decision Tonbridge and Malling 26/01086/FL

Works: Extension Loft or dormer

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Two storey extension to front, dormer to rear, alterations to existing roof and fenestrations

As published by the council, reference 26/01086/FL

Application record

Reference
26/01086/FL
Status
Registered
Received
9 Jun 2026
Validated
26 Jun 2026
Ward
Larkfield
Parish
East Malling And Larkfield
Decision by
Delegated
Postcode
ME20 6JA

Site history

Applications at this address on the Tonbridge and Malling register

This site has had 2 applications since 2023: 1 approved, 0 refused.

  • 23/00397/FL Granted

    Rose Cottage 440 Lunsford Lane Larkfield Aylesford Kent ME20 6JA

    Demolition of existing garage/workshop/barn building. Erection of a 4 bedroom detached Chalet house with detached double garage

    Decided 21 Apr 2023 Full applications

Timeline

Dates from the published record

  1. 9 Jun 2026

    Received by Tonbridge and Malling

  2. 26 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tonbridge and Malling took a median of 62 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

david mills architect Agent, an architecture practice

48 applications on PlanIndex · across 11 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

  • NATIONAL GRID Consultee Response · 02 Sep 2026
  • EM&L PARISH COUNCIL Consultee Response · 08 Jul 2026
  • SOUTHERN WATER Consultee Response · 06 Jul 2026
  • PROPOSED ROOF PLAN Drawing Superseded · 09 Jun 2026
  • PROPOSED ELEVATIONS Drawing Superseded · 09 Jun 2026
  • APPLICATIONFORMREDACTED Application Form · 09 Jun 2026
  • SITE LOCATION PLAN Site Location Plan · 09 Jun 2026
  • EXISTING BLOCK PLAN Drawing · 09 Jun 2026
  • EXISTING GROUND FLOOR PLAN Drawing · 09 Jun 2026
  • EXISTING FIRST FLOOR PLAN Drawing · 09 Jun 2026
  • EXISTING ROOF PLAN Drawing · 09 Jun 2026
  • EXISTING ELEVATIONS Drawing · 09 Jun 2026
  • PROPOSED BLOCK PLAN Drawing Superseded · 09 Jun 2026
  • PROPOSED GROUND FLOOR PLAN Drawing Superseded · 09 Jun 2026
  • PROPOSED FIRST FLOOR PLAN Drawing Superseded · 09 Jun 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Tonbridge and Malling for determination, against a statutory target of eight weeks. Over the last year Tonbridge and Malling's median decision took 62 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Tonbridge and Malling's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres