Skip to content
PlanIndex Get alerts
Menu

Planning application

5 Orwell Spike West Malling Kent ME19 4PB

Granted Tonbridge and Malling 22/01856/FL Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey ground floor side extension

As published by the council, reference 22/01856/FL

Application record

Reference
22/01856/FL
Type
Planning Permission
Status
Approved
Decision
Approved
Received
23 Aug 2022
Validated
31 Aug 2022
Decided
3 Oct 2022
Ward
West Malling And Leybourne
Parish
West Malling
Decision by
Delegated Decision
Postcode
ME19 4PB

Timeline

Dates from the published record

  1. 23 Aug 2022

    Received by Tonbridge and Malling

  2. 31 Aug 2022

    Validated

    Checked as complete and ready for consideration.

  3. 3 Oct 2022

    Decision issued: Approved

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 5 Orwell Spike West Malling Kent ME19 4PB

    22/00445/RD Submitted 28 Feb 2022 0m away

    Details of condition 3 (Landscaping), 5 (Contaminated land desktop study) and 6 (Site investigation) pursuant to planning permission TM/21/01112/FL (New dwelling with integral garage)

    Granted Outline New dwelling 18 docs
    Domestic
  • 5 Orwell Spike West Malling Kent ME19 4PB

    21/01112/FL Submitted 19 Apr 2021 25m away

    New dwelling with integral garage

    Granted Full applications New dwelling 18 docs
    Domestic
  • 5 Orwell Spike West Malling Kent ME19 4PB

    22/01870/RD Submitted 24 Aug 2022 27m away

    Details of conditions 8 (archaeology) submitted pursuant to planning permission TM/21/01112/FL (New dwelling with integral garage)

    Granted Outline New dwelling 7 docs
    Domestic
  • 4 Orwell Spike West Malling Kent ME19 4PB

    21/00289/RD Submitted 3 Feb 2021 40m away

    Details of Condition 4 (contamination) pursuant to planning permission TM/20/01939/FL (Demolition of existing garage. Subdivision of existing site and construction of additional detached dwelling with integral garage, parking and replacement garage for existing dwelling)

    Granted Outline New dwelling Demolition 13 docs
    Domestic
  • 4 Orwell Spike West Malling Kent ME19 4PB

    20/01939/FL Submitted 7 Sep 2020 41m away

    Demolition of existing garage. Subdivision of existing site and construction of additional detached dwelling with integral garage, parking and replacement garage for existing dwelling

    Granted Full applications New dwelling Demolition 15 docs
    Domestic
  • 4 Orwell Spike West Malling Kent ME19 4PB

    22/01074/NMA Submitted 17 May 2022 41m away

    Non-Material Amendment to planning permission TM/20/01939/FL: minor layout amendments, ground floor rooflights amended to lanterns, window configuration/details clarified, Side B south west flank pitched rooflights omitted, new obscure glazed windows with opening fanlights only serving en suite and bathroom, side B south west flank ground floor window omitted

    Granted Amendments Loft or dormer Windows or glazing 4 docs

In Tonbridge and Malling

  • 26/00079/FL Refused

    Former Grimbles Long Mill Lane Crouch Borough Green Sevenoaks Kent TN15 8QB

    Erection of a detached residential dwelling with associated access.

    20 Jan 2026 Full applications
  • 26/00459/FL Granted

    8 Tumblefield Estate Tumblefield Road Stansted Sevenoaks Kent TN15 7PS

    Erection of timber fencing along boundary (retrospective).

    17 Mar 2026 Full applications
  • 26/00218/FL Granted

    Land North Of Recreation Ground Church Lane East Peckham Tonbridge Kent

    Change of Use of Land for Recreational Dog Walking (Sui Generis) and associated parking, access and hardstanding

    10 Feb 2026 Full applications
  • 26/00715/FL Granted

    57 St Peters Road Ditton Aylesford Kent ME20 6PF

    Construction of a single/ two storey rear extension comprising first floor side dormer addition

    20 Apr 2026 Full applications
  • 26/00667/FL Granted

    Land North Of Lodge Farmhouse High Street Aylesford Kent

    Erection of 2no. commercial buildings (Use Class B8) with associated external storage including storage racking, vehicle parking, servicing and associated works including boundary fencing and access gates (part retrospective)

    13 Apr 2026 Full applications