Skip to content
PlanIndex Get alerts
Menu

Planning application

26 Deakin Leas Tonbridge Kent TN9 2JU

Granted Tonbridge and Malling 20/02172/FL Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of existing integral garage to a habitable room and rear single storey extension

As published by the council, reference 20/02172/FL

Application record

Reference
20/02172/FL
Type
Planning Permission
Status
Approved
Decision
Approved
Received
30 Sep 2020
Validated
1 Oct 2020
Decided
24 Nov 2020
Ward
Vauxhall
Parish
Tonbridge
Decision by
Delegated Decision
Postcode
TN9 2JU

Timeline

Dates from the published record

  1. 30 Sep 2020

    Received by Tonbridge and Malling

  2. 1 Oct 2020

    Validated

    Checked as complete and ready for consideration.

  3. 24 Nov 2020

    Decision issued: Approved

  4. 20 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 24, Deakin Leas, Tonbridge, TN9 2JU

    21/02182/FL Submitted 6 Aug 2021 14m away

    Two storey side extension and single storey rear extension

    Granted Full applications Extension 8 docs
    Small domestic
  • 13 Deakin Leas Tonbridge Kent TN9 2JS

    22/02661/FL Submitted 2 Dec 2022 42m away

    Single storey rear extension, internal alterations, addition of rear dormer to the roofspace for the second floor

    Granted Full applications Extension Loft or dormer 10 docs
    Small domestic
  • 27 Deakin Leas Tonbridge Kent TN9 2JS

    21/00149/PDVLR Submitted 20 Jan 2021 46m away

    Prior Notification for Residential Extension: single storey 4.75m rear extension

    Decided Outline Extension 9 docs
    Small domestic
  • Marlfield Cottage 48A Pembury Road Tonbridge Kent TN9 2JE

    26/00762/TPOC Submitted 23 Apr 2026 48m away

    1 x dead Pine (shown in applicants photo IMG_2878) - Remove. Standing in Group G1 of Tree Preservation Order and 1 x dead Pine (shown in applicants photo IMG_2879) - Remove. Standing in Group G2 of Tree Preservation Order

    Decided Trees
  • 38 Deakin Leas Tonbridge Kent TN9 2JX

    20/02102/FL Submitted 22 Sep 2020 52m away

    Ground floor extension and demolition of the existing garage

    Granted Full applications Extension Demolition 16 docs
  • 38 Deakin Leas Tonbridge Kent TN9 2JX

    20/01816/FL Submitted 20 Aug 2020 52m away

    Ground floor extension, new basement and demolition the existing garage

    Withdrawn Full applications Extension Demolition 14 docs

In Tonbridge and Malling

  • 26/00079/FL Refused

    Former Grimbles Long Mill Lane Crouch Borough Green Sevenoaks Kent TN15 8QB

    Erection of a detached residential dwelling with associated access.

    20 Jan 2026 Full applications
  • 26/00459/FL Granted

    8 Tumblefield Estate Tumblefield Road Stansted Sevenoaks Kent TN15 7PS

    Erection of timber fencing along boundary (retrospective).

    17 Mar 2026 Full applications
  • 26/00218/FL Granted

    Land North Of Recreation Ground Church Lane East Peckham Tonbridge Kent

    Change of Use of Land for Recreational Dog Walking (Sui Generis) and associated parking, access and hardstanding

    10 Feb 2026 Full applications
  • 26/00715/FL Granted

    57 St Peters Road Ditton Aylesford Kent ME20 6PF

    Construction of a single/ two storey rear extension comprising first floor side dormer addition

    20 Apr 2026 Full applications
  • 26/00667/FL Granted

    Land North Of Lodge Farmhouse High Street Aylesford Kent

    Erection of 2no. commercial buildings (Use Class B8) with associated external storage including storage racking, vehicle parking, servicing and associated works including boundary fencing and access gates (part retrospective)

    13 Apr 2026 Full applications