Planning application
Land Adjacent Orchard House Pepingstraw Close Offham West Malling Kent
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of the existing dwelling and the erection of four detached dwellings together with associated parking, access and landscaping on land at Orchard House, Pepingstraw Close, Offham
As published by the council, reference 20/01954/FL
Application record
- Reference
- 20/01954/FL
- Type
- Planning Permission
- Status
- Decided
- Decision
- Approved
- Received
- 8 Sep 2020
- Validated
- 10 Sep 2020
- Decided
- 7 Apr 2021
- Ward
- Downs And Mereworth
- Parish
- Offham
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
8 Sep 2020
Received by Tonbridge and Malling
-
10 Sep 2020
Validated
Checked as complete and ready for consideration.
-
7 Apr 2021
Decision issued: Approved
-
4 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
34 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Cherry Court 3 Moorlands View Offham West Malling Kent ME19 5SY
95% historically approved · decision due ~28 Jul
Lawful Development Certificate Proposed: Proposed Garden Room to provide gym and sauna
Awaiting decision Lawful development 11 docs -
Cherry Court 3 Moorlands View Offham West Malling Kent ME19 5SY
Proposed Garden Room to provide gym and sauna
Refused Full applications 10 docs -
Greengates Teston Road Offham West Malling Kent ME19 5PD
Ground floor rear extension as per previous application granted TM/19/00940/FL, with addition of front porch and room extended at front
Granted Full applications Extension 10 docsSmall domestic -
7 Pepingstraw Close Offham West Malling Kent ME19 5PB
Demolition of existing one storey rear conservatory and construction of replacement one storey rear extension
Granted Full applications Extension Demolition 10 docs -
22, Pepingstraw Close, Offham, West Malling, ME19 5PB
Lawful Development Certificate Proposed: Erecting a single storey rear extension
Decided Lawful development Extension 10 docsSmall domestic -
16 Pepingstraw Close Offham West Malling Kent ME19 5PB
95% historically approved · decision due ~28 Aug
Demolition of existing conservatory, and construction of a single storey rear extension
Decided Extension Demolition 6 docsSmall domestic
Other full applications applications
In Tonbridge and Malling
-
26/00079/FL Refused
Former Grimbles Long Mill Lane Crouch Borough Green Sevenoaks Kent TN15 8QB
Erection of a detached residential dwelling with associated access.
-
26/00459/FL Granted
8 Tumblefield Estate Tumblefield Road Stansted Sevenoaks Kent TN15 7PS
Erection of timber fencing along boundary (retrospective).
-
26/00218/FL Granted
Land North Of Recreation Ground Church Lane East Peckham Tonbridge Kent
Change of Use of Land for Recreational Dog Walking (Sui Generis) and associated parking, access and hardstanding
-
26/00715/FL Granted
57 St Peters Road Ditton Aylesford Kent ME20 6PF
Construction of a single/ two storey rear extension comprising first floor side dormer addition
-
26/00667/FL Granted
Land North Of Lodge Farmhouse High Street Aylesford Kent
Erection of 2no. commercial buildings (Use Class B8) with associated external storage including storage racking, vehicle parking, servicing and associated works including boundary fencing and access gates (part retrospective)