Planning application
Telephone Exchange London Road Aveley Essex RM15 4XU
Works: Extension Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of a new cable trench, electrical secondary distribution substation within a GRP enclosure and electrical panel within a GRP enclosure, together with partial demolition of the existing fuel tank annex enclosure and extension of the existing concrete plinth by approximately 1.75m
As published by the council, reference 26/01017/FUL
Application record
- Reference
- 26/01017/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 28 Aug 2026
- Validated
- 7 Sep 2026
- Postcode
- RM15 4XU
Timeline
Dates from the published record
-
28 Aug 2026
Received by Thurrock
-
7 Sep 2026
Validated
Checked as complete and ready for consideration.
-
8 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Thurrock took a median of 58 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Thurrock for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
79 Water Lane Purfleet-on-thames Essex RM19 1GX
Part single storey side/rear extension and part first floor side and rear extension.
Refused Householder Extension 32 docsSmall domestic
Other full applications applications
In Thurrock
-
26/01027/FUL Awaiting decision
Essex Partnership University NHS Trust Thurrock Community Hospital Long Lane Stifford Clays Grays Essex RM16 2PX
Retention on a permanent basis of 2 storage containers established under previous temporary consent (Ref: 24/00962/FUL).
-
26/00996/FUL Awaiting decision
Rear Of 16 London Road Stanford Le Hope Essex SS17 0LD
Material changes to the previously approved planning application for first floor rear extension, previous planning application ref. 18/00343/ful.
-
26/01000/FUL Awaiting decision
Artistic Signs The Laurels Lower Dunton Road Horndon On The Hill Essex SS17 8QD
Demolition of the existing conservatory and outbuildings and erect extension to existing house and 2 new build dwellings and associated landscaping
-
26/00990/FUL Awaiting decision
Unit 8 Thurrock Shopping Park Weston Avenue West Thurrock Essex RM20 3LP
Change of use from retail use (Use Class E(a)) to restaurant and hot food takeaway use (sui generis) including external alterations and extension to existing building, external seating area, plant enclosure and bin store, provision of drive through lane and alterations to car parking and landscaping
-
26/00988/FUL Awaiting decision
Tilbury Riverside Art Activity Centre Ferry Road Tilbury Essex RM18 7NJ
Installation of a freestanding interpretation finger post sculpture with integrated bench (corten steel and Iroko timber) within the eastern external terrace area, together with two associated external spotlights for illumination of the structure, two wall-mounted entrance lights, and two freestanding lamp posts within the terrace.