Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Birchfield North Stifford Grays Essex RM16 5UU

Granted Thurrock 26/00916/HHA

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to the front elevation including the erection of a two-storey front entrance extension incorporating a lift, together with an external wheelchair access ramp and associated external alterations.

As published by the council, reference 26/00916/HHA

Application record

Reference
26/00916/HHA
Status
Permitted
Decision
Granted As published: Approved
Received
6 Aug 2026
Validated
6 Aug 2026
Ward
Stifford
Postcode
RM16 5UU

Timeline

Dates from the published record

  1. 6 Aug 2026

    Received by Thurrock

  2. 8 Aug 2026

    Added to PlanIndex

  3. 5 Oct 2026

    Status changed to Permitted

    Previously Awaiting decision.

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

  • APPLICATIONFORMREDACTED Application Form · 06 Aug 2026
  • EXISTING GROUND FLOOR PLAN Current Plan · 06 Aug 2026
  • EXISTING FIRST FLOOR PLAN Current Plan · 06 Aug 2026
  • PROPOSED GROUND FLOOR PLAN Current Plan · 06 Aug 2026
  • PROPOSED FIRST FLOOR PLAN Current Plan · 06 Aug 2026
  • EXISTING ROOF PLAN Current Plan · 06 Aug 2026
  • PROPOSED ROOF PLAN Current Plan · 06 Aug 2026
  • EXISTING ELEVATIONS Current Plan · 06 Aug 2026
  • EXISTING ELEVATIONS Current Plan · 06 Aug 2026
  • PROPOSED ELEVATIONS Current Plan · 06 Aug 2026
  • PROPOSED ELEVATIONS Current Plan · 06 Aug 2026
  • PROPOSED SECTION AA Current Plan · 06 Aug 2026
  • EXISTING BLOCK PLAN Current Plan · 06 Aug 2026
  • PROPOSED SITE PLAN Current Plan · 06 Aug 2026
  • LOCATION PLAN Current Plan · 06 Aug 2026
  • PLANNING STATEMENT Studies and Reports · 06 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Thurrock granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Thurrock's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles