Planning application
Lloyds TSB 20 - 22 Grover Walk Corringham Essex SS17 7LY
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of a Commercial Kitchen Extraction System Incorporating Internal Filtration in Connection with a Proposed Restaurant (Use Class E)
As published by the council, reference 26/00893/FUL
Application record
- Reference
- 26/00893/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 3 Aug 2026
- Validated
- 3 Aug 2026
- Ward
- Corringham And Fobbing
- Postcode
- SS17 7LY
Timeline
Dates from the published record
-
3 Aug 2026
Received by Thurrock
-
11 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Thurrock took a median of 58 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
3 applications on PlanIndex · across 3 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Thurrock for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Lloyds TSB 20 - 22 Grover Walk Corringham Essex SS17 7LY
81% historically approved · decision due ~17 Aug
Change of use from bank (Class E(c)(i)) to restaurant/cafe (Class E(b)).
Awaiting decision Lawful development -
Zer Shish 17 Grover Walk Corringham Essex SS17 7LP
Decking area and planters in front of the property.
Refused Full applications 8 docs -
Town Square Grover Walk Corringham Essex
Installation of CCTV camera on 6 metre columns adjacent 3
Granted 1 doc -
Amber Court 41A St Johns Way Corringham Essex
Change of use from approved A4 use (Sui Generis) as a public house to Class E - E(a) shop, for the display or retail sale of goods, other than for the sale of hot food.
Refused Full applications 13 docs -
1 Grover Walk Corringham Essex SS17 7LU
Removal of the existing 6 antennas and installation of an 11m stub mast comprising 6 no antennas and 2 dishes with ancillary development.
Withdrawn Full applications 40 docs -
London Real Estate 777 Limited First Floor 1 Grover Walk Corringham Essex SS17 7LU
The application seeks Prior Approval to add a third floor and fourth floor, and other associated development to create 4x 1 bed flats
Withdrawn New dwelling 9 docs
Other full applications applications
In Thurrock
-
26/01027/FUL Awaiting decision
Essex Partnership University NHS Trust Thurrock Community Hospital Long Lane Stifford Clays Grays Essex RM16 2PX
Retention on a permanent basis of 2 storage containers established under previous temporary consent (Ref: 24/00962/FUL).
-
26/00996/FUL Awaiting decision
Rear Of 16 London Road Stanford Le Hope Essex SS17 0LD
Material changes to the previously approved planning application for first floor rear extension, previous planning application ref. 18/00343/ful.
-
26/00990/FUL Awaiting decision
Unit 8 Thurrock Shopping Park Weston Avenue West Thurrock Essex RM20 3LP
Change of use from retail use (Use Class E(a)) to restaurant and hot food takeaway use (sui generis) including external alterations and extension to existing building, external seating area, plant enclosure and bin store, provision of drive through lane and alterations to car parking and landscaping
-
26/00988/FUL Awaiting decision
Tilbury Riverside Art Activity Centre Ferry Road Tilbury Essex RM18 7NJ
Installation of a freestanding interpretation finger post sculpture with integrated bench (corten steel and Iroko timber) within the eastern external terrace area, together with two associated external spotlights for illumination of the structure, two wall-mounted entrance lights, and two freestanding lamp posts within the terrace.
-
26/00986/FUL Awaiting decision
St Cleres School Butts Lane Stanford Le Hope Essex SS17 0NW
Demolition of five school blocks; refurbishment of one school block; construction of two new secondary education buildings and external plant room; reconfiguration of parking arrangements; provision of a new MUGA; associated hard and soft landscaping and ancillary works.